Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on March 27, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z1DA--Roofing Project Muskogee (623-20-126)

Closed
36C25923R0043Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Solicitation # W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB
The U.S. Army Corps of Engineers, supporting the U.S. Air Force, is conducting market research via a Request for Information to identify qualified industry partners for seven construction and renovation projects at Wright-Patterson Air Force Base, Ohio. These projects range in scope from the renovation of sensitive Special Access Program spaces and the construction of a 90,000 square foot research laboratory to the modernization of compressor facility systems, the decentralization of heating plants, and the repair of military dormitories. The estimated acquisition magnitudes for these individual efforts vary significantly, with the largest project valued at approximately 160 million dollars. The government intends to utilize Other Transaction Agreements and a Progressive Design-Build delivery method, which splits the work into a collaborative design and pre-construction phase followed by a construction phase based on a Guaranteed Maximum Price. Interested firms must provide detailed company profiles, evidence of cybersecurity compliance through CMMC and SPRS, and experience with complex MEP infrastructure and secure facility standards. Responses are due by November 2, 2026, and should be submitted to the primary point of contact in PDF format.
W072 Endist Louisville

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 8 hours ago

DEADLINE

in 19 days

General Info

Contract Value

$3,206,058.78

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CO

Set-Aside

SDVOSBC

Award Issued Date

Documents

9

Amendment 0001 to Solicitation 36C25923R0043

DOCX, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 36C25923R0043

DOCX, High priority: read this firstamendment
High

Pre-Proposal Site Visit Meeting 36C25923R0043 Roofing Project Muskogee

PDF, High priority: read this firstpresolicitation
High

Q&A Document for Roofing Project Muskogee RFP

PDF, High priority: read this firstq-and-a
High

Solicitation 36C25923R0043 Roofing Project Muskogee

DOCX, High priority: read this firstifb
High

VA Medical Center Muskogee Re-Roof Multiple Buildings Project 623-20-126 Specifications

PDF, High priority: read this firstspecifications
High

VAMC Muskogee Re-Roof Project Drawings 623-20-126

PDF, Low prioritydrawings
Low

Past+Performance+Questionnaire.docx

DOCX

S04+-+Site+Visit+Attendance+%28Roofing+Project+Muskogee%29+signed.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Mar 20, 2023 to Mar 29, 2023. Set-aside added: Service-Disabled Veteran-Owned Small Business Set Aside.

Deadline changed

Response deadline changed from Mar 29, 2023 to Apr 5, 2023.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA
Contacts
Jared Detton (CSContract Specialist

Full Description

Show more
Statement of Work Project # 623-20-126 Re-roof Bldg. 50, 53, 56 Roofing Project Jack C. Montgomery VA Medical Center - Muskogee, OK Scope of work: The project has a requirement for the replacement of existing roof system which includes re-roof with new TPO roof system. Investigation will take place to replace support surfaces and structural elements as needed, replace all perimeter and penetration flashings, remove all unnecessary penetrations replace all roof drain hardware, rings, gutters, and downspouts In addition to the re-roof, Bldg. 53 will require removal and replacement of the lightning protection system. Refer to page EJ132 of the design and section 26-41-00 of the VA specifications for lightning protection plans. Due to the Very Severe Hail (VSH) classification of Muskogee and the surrounding area, a 115-mil fleece backed TPO membrane (60 mil TPO + 55 mil fleece) and high-density coverboard was selected. The Bldg. 50 roof is sloped metal deck, approximately 460 square feet. The Bldg. 56 roof is sloped structural concrete deck, approximately 2,100 square feet. Building 53 is the largest roof and includes an elevated penthouse roof. The main roof is a flat structural concrete deck, approximately 32,650 square feet, with tapered insulation for drainage. The Machine Room roof is a sloped metal deck, approximately 2,650 square feet. All roofs will have the aggregate, roofing membrane, and insulation removed down to the structural deck. New polyisocyanurate insulation, high-density coverboard, and 115-mil fleece backed TPO membrane will be installed in all locations. The concrete roof decks will receive a vapor barrier below the insulation and the metal decks will have a substrate board to cover the fluted deck. General: Contractor to provide all required labor, material, equipment, and site investigations to develop to perform re-roof of Bldgs. 50, 53, and 56 as called out in design drawings and specifications. Firms shall be properly licensed and bonded to perform general contracting work in the State of Oklahoma or have equivalent licensing and be approved for such work by the Veteran s Administration. It is to be documented in the construction documents that the prime construction contractor shall provide engineering and technical support, all manuals, wiring diagrams, and tools necessary for adjusting, maintaining, repairing, and testing of equipment for use by VA Engineering staff or VA s designated Maintenance Provider Construction documents to include contract drawings and specifications for the development of contract documents. Project Management: Based on the above list of work items, contractor must complete, maintain, and submit the following documentation and managerial requirements: Construction schedule including sequencing and durations. The schedule will be provided to the Contracting Officer s Representative (COR) fifteen calendar days after the pre-construction meeting Site-Specific Safety Plan (SSSP) with an emphasis on tasks to be performed during the work. The SSSP must: Include a detailed description of how the work will be performed and be submitted with sketches, supporting documents, submittals etc. Include a Job-Safety-Analysis (JSA) for all tasks associated with Statement of Work (SOW) Be reviewed and commented by VA-Safety and COR prior to commencement of work. Maintain site supervision by a competent individual(s) with OSHA-30 certificates. OSHA-30 certified technician shall be onsite anytime work is being performed. Obtain VA identification PIV badges for all employees. Contractor to consider lead-time for badge procurement. Manage job-site access and security. Implement and maintain required ICRA and ILSM measures. Code and Regulation Compliance: The Contractor shall comply with public laws and statutes including all changes and amendments to federal, state, and local environmental statutes and regulations in effect the date of issuance of this delivery order, including applicable portions of the documents cited in the basic contract and below: NFPA 99-2015 Healthcare Facilities Codes. ANSI/ASSE Z359 NFPA 101 Life Safety Code Architectural Barriers Act (2005) International Code Council (ICC): IBC: International Building, 2015 Building Officials and Code Administrators International (BOCA), 1999 International Conference of Building Officials (ICBO): UBC 1997: Uniform Building Code 29 CFR 1910 Occupational Safety and Health Standards 29 CFR 1926 Safety and Health Regulations for Construction Federal Occupational Safety and Health Act (OSHA) Underwriters Laboratories Submittals: Contractor shall submit the following prior to beginning scope of work: Project schedule with sequencing, durations, phasing, and cost loading within Site Specific Safety Plan (SSSP) SSSP to be submitted to VA Safety staff and COR for review 10 working days after issuance of NTP. SSSP to be reviewed and commented by VA Safety staff and COR prior to start of construction activities. Construction Demolition/Removal Plan Inspection reports, manufacturer approval certificates, and warranties as noted in specifications. Penetration and or hot work permits as necessary. Manufacturer and construction warranties as noted in specifications. Project Schedule including sequencing and durations. SOV Schedule of Values Site superintendent OSHA-30, and tradesmen/laborer OSHA-10 certificates. OSHA-30 certified technician shall be onsite anytime work is being performed. Material Submittals Submit for COR approval Manufacturer s specifications for all materials and equipment planned for installation. Inspection reports, manufacturer approval certificates, and warranties as noted in specifications. Technical literature and/or descriptions of all materials, equipment and tools proposed for use by the Contractor shall be submitted to the Contracting Officer or his/her designee for approval prior to contract start and whenever a change is required. All Contractor-furnished materials, equipment and tools used shall be standard products all manufacturers regularly engaged in the production of such items. The Contractor shall secure all materials. The Government assumes no liability for loss of or damage to Contractor-owned property held upon Government premises. Contractor shall submit hours worked, full report of completed piping which shall include location, hours worked, the full name of Contractor s employees on site, and digital photographs before and after work is completed. Reports shall be submitted within one day upon completion of work performed. Contractor will provide a completed redline drawing of the completed routing of piping. If necessary, a secondary report shall be submitted after any repairs outside of the Work Required have been completed. Reports shall be provided in hard copy as well as in an agreeable and compatible electronic format such as, but not limited to, pdf or Microsoft Word. Applicable & Supporting Documents: VA Drawing & Specification sections: 623-20-126 100pct Drawings Stamped 623-20-126 100pct Specifications Stamped 623-20-129 100pct Design Narrative Safety: In the performance of this contract, the contractor shall take such safety precautions as necessary to protect the lives and health of occupants of the building including but not limited to the items listed below: The Contractor shall communicate and coordinate onsite safety training which shall be completed prior to the start of any work. The Contractor shall assume responsibility of environmental protection of all material storage. The VA safety officer will hold VA medical center specific safety training. All contracted personnel will be required to have this course Any personnel found working on-site without it will be asked to vacate the premises immediately All contractors deemed a supervisor, superintendent, or any variation of shall have an OSHA 30 card and provide proof at the VA medical center safety training. Proof of safety training and OSHA 30 cards shall be electronically submitted to the COR and CO. All contracted personnel shall have a minimum of OSHA 10 certification and shall provide proof during the VA medical center training. Hours of Work: With few preapproved exceptions, the hours of work shall take place during the normal business hours of 0800-1600 (8:00 AM to 4:00 PM), Monday through Friday. Federal Holidays excluded. Weekend, after-hour, and Federal holiday work is permitted with a request in writing submitted beforehand. Allow 10 working days for approval. Off hours are not to billed as overtime. Federal Holidays and any other day declared a federal holiday by the President of the United States are defined below. New Year s Day Martin Luther King Jr s Day Presidents Day Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day Juneteenth Quality Control: The Contractor shall have a quality control program to assure the requirements of this contract are provided as specified. The Contractor and COR will inspect the work. Deficiencies will be noted and corrected before beginning work in another area. Any damage done by Contractor will also be noted and corrected by the Contractor within 2 working days. Damage causing an immediate impact on the environment of the hospital shall be corrected immediately. Quality control measures will be observed daily by VA safety staff. Acceptance Standards: The VA reserves the right to dispute completion of contract scope if contract work is found not in accordance with manufacturer recommendations, or is not satisfactorily executed in accordance with the SOW. All work completed by the Contractor must be reviewed and approved by the COR prior to final acceptance. Meetings: The contractor is required to attend the pre-construction meeting after award, this meeting will be held at a date and time specified by the Contracting Officer to review project scope, site, and requirements, as well as provide answers to any questions. Place of Performance: Location: Jack C. Montgomery VAMC Address: 1011 Honor Heights Drive - Muskogee, OK 74401 Period of Performance: The period of performance for this contract is 270 calendar days from the notice to proceed. Badges and Parking Contractor must acquire PIV badge for all staff onsite prior to work beginning. While on VA Facilities official I.D. badges shall be worn continuously. Failure of the background check may result in specific personnel being disallowed to work on VA premises and the Contractor will need to provide replacement personnel. Contractor shall coordinate all badging requests through the COR It is the responsibility of the Contractor s personnel to park in the appropriate designated parking areas. The designated parking area will be specified by COR upon award of contract. While performing under this contract, all vehicles used by the Contractor shall be locked and the keys removed when not in use. This is intended to protect the Contractor s property and the safety of the patients at the Medical Center. Parking passes and/or PIV badges can be accepted and/or rejected by the VA police force. The VA police force is a federal law enforcement agency. Access The COR shall provide the Contractor access to all buildings and rooms required in the provisions of this contract. The Contractor shall notify the COR when leaving these areas and immediately turn in any keys to prevent unauthorized reproduction or utilization. Contractor shall give the COR 48 hours notice when access to a locked space is needed and granted.

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS