Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z2DA--620-22-700 Electronic Health Record Modernization Infrastructure Upgrades - Franklin Delano Roosevelt VA Hospital, Montrose, NY

Closed
RFP-36C77626R0033Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic or FRP shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations in a phased sequence, completing one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a detailed bid sheet with a cost breakdown separating materials and labor, a project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. Award selection is based on technical alignment with the scope of work and risk mitigation rather than the lowest bid. The contract requires strict adherence to ADA, OSHA, and NFPA 101 Life Safety codes, as well as compliance with the Davis-Bacon Act and various FAR clauses, including 100 percent performance and payment bonds. Payment terms are net 30 days upon receipt of a proper invoice and final project acceptance, which requires a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 12 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract, identified as RFP-36C77626R0033 under project number 620-22-700, is a Firm Fixed Price procurement issued by the Department of Veterans Affairs through the Program Contracting Activity Central for the EHRM Infrastructure Upgrades at the Franklin Delano Roosevelt VA Hospital in Montrose, New York. The solicitation is a total small business set-aside under NAICS code 236220, requiring all offerors to be certified as small businesses in SBA’s Small Business Search at the time of submission and award. The work involves comprehensive construction and infrastructure upgrades, including HVAC commissioning per Section 23 08 00, with deliverables requiring adherence to strict standards such as NFPA 70, NFPA 99, ASTM E84, E814, E2174, E2393, and TIA/EIA-568-B throughout design, installation, and testing. Inspections and acceptance are conducted at the project site, with the Government verifying compliance through its Contracting Officer’s Representative, and contractors are obligated to submit detailed submittals including shop drawings, test reports, operation manuals, and training programs, with all systems required to operate error-free for 30 days before final acceptance. The contract imposes stringent operational and compliance requirements, including the mandatory use of specialized inspectors such as the Special Inspector of Record and independent Third Party Inspectors, who must maintain organizational and financial separation from the contractor. All construction personnel must complete OSHA 10-hour training prior to site access, with additional specialized training required for high-hazard tasks. Specific safety and health protocols governed by Executive Order 13899 and the VHA ICRA and PCRA frameworks must be followed and updated if the scope changes. Contracting parties must comply with detailed packaging, preservation, and marking standards, requiring original sealed manufacturer packaging, moisture and UV protection, permanent labeling, and proper storage for materials including lumber and coatings. Payment is exclusively through the VA’s electronic invoicing portal, and proposals must be submitted electronically in three searchable PDF volumes under 5MB each, with Past Performance evaluated as significantly more important than price in a best-value trade-off process. Amendments have extended the response deadline to May 14, 2026, and added critical clauses such as 52.222-90, while requiring updated attachments, revised instructions

General Info

Small business set-aside for EHR infrastructure upgrades at FDR VA Hospital, deadline May 14, 2026.

Agency

Department Of Veterans Affairs → Pcac (36C776)View Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Montrose, NY, USA

Set-Aside

SBA

Documents

(109)

Attachment+33+-+Drawing+Site+20250627.pdf

PDF

VHA Infection Control Risk Assessment Template for Construction and Maintenance Activities

PDFsow

Pre-Renovation Asbestos Inspection and Lead Paint Screening Report - Montrose VAMC Building 07

PDFreport

ATTACHMENT+21+-+Montrose.EHRM.Addendum.01.B13.20260330.pdf

PDF

ATTACHMENT+13+-+Montrose.EHRM.Addendum.01.B01.20260330.pdf

PDF

Attachment+5+-+01+00+00.D+-+Appendix+D1+SOP+138-06HV+OCCUPATIONAL+SAFETY+AND+HEALTH+PROGRAM.pdf

PDF

Amend+5+-+B17.20260330.pdf

PDF

VHA Pre-Construction Risk Assessment (PCRA) Template 2024

PDFsow

Amend+5+-+B04.20260330.pdf

PDF

Attachment+17+-+Drawing+B05+20250627.pdf

PDF

Montrose EHRM Addendum 01 Site 20260330

PDFamendment

ATTACHMENT+32+-+Montrose.EHRM.Addendum.01.B52.20260330.pdf

PDF

ATTACHMENT+18+-+Montrose.EHRM.Addendum.01.B06.20260330.pdf

PDF

Solicitation 36C77626R0033 - Technical Questions and VA Response Tracking Sheet

PDFrfi

Amend+5+-+B01.20260330.pdf

PDF

Attachment+25+-+Drawing+B17+20250627.pdf

PDF

Montrose EHRM Addendum 01 B29 20260330

PDFamendment

Pre-Renovation Asbestos Inspection and Lead Paint Screening Report - Montrose VAMC Building 07

PDFreport

Addendum #1 for Project 620-22-700 Montrose EHRM

PDFamendment

Amendment 2 to Solicitation 36C77626R0033 for EHRM Infrastructure Upgrades

PDFamendment

Original+attachments+22-29+B14-B28.zip

ZIP

ATTACHMENT+23+-+Montrose.EHRM.Addendum.01.B15.20260330.pdf

PDF

ATTACHMENT+15+-+Montrose.EHRM.Addendum.01.B03.20260330.pdf

PDF

ATTACHMENT+31+-+Montrose.EHRM.Addendum.01.B31.20260330.pdf

PDF

Attachment+27+-+Drawing+B20+20250627.pdf

PDF

SOP 138-22HV Construction Standard Procedures Quality Assurance

PDFsop

Amend+5+-+B06.20260330.pdf

PDF

Amend+5+-+B31.20260330.pdf

PDF

36C77626R0033 Site Visit Sign-In Sheet for EHRM Infrastructure Upgrades

PDFsite-visit-sign-in-sheet

ATTACHMENT+25+-+Montrose.EHRM.Addendum.01.B17.20260330.pdf

PDF

Solicitation 36C77626R0033 RFI Tracking Sheet for EHRM Project 620-22-700 Montrose

XLSXrfi-tracking-sheet

Montrose VA Medical Center Supplemental Asbestos and Lead Paint Inspection Report J2237038

PDFreport

Attachment+20+-+Drawing+B12+20250627.pdf

PDF

ATTACHMENT+16+-+Montrose.EHRM.Addendum.01.B04.20260330.pdf

PDF

Attachment 36 - Division Cost Breakdown Construction Estimate

XLSXcost-estimate

Attachment+31+-+Drawing+B31+20250627.pdf

PDF

Wage Rates Westchester County NY 1-30-2026

PDFwage-determination

Amend+5+-+B05.20260330.pdf

PDF

Amend+5+-+B02.20260330.pdf

PDF

ATTACHMENT+5+-+01+00+00.D+-+Appendix+D+-+SOP+138-06HV+OCCUPATIONAL+SAFETY+AND+HEALTH+PROGRAM.pdf

PDF

Attachment+37+-+Site+Visit+Instructions.pdf

PDF

Amend+5+-+B27.20260330.pdf

PDF

Amend+5+-+B16.20260330.pdf

PDF

Amend+5+-+B28.20260330.pdf

PDF

ATTACHMENT+2+-+01+00+00.A+-+Appendix+A+-+OIT-InfrastrucStdTelecomSpaces.pdf

PDF

Solicitation 36C77626R0033 - Technical Questions and VA Response Tracking Sheet

PDFq-and-a

Attachment+21+-+Drawing+B13+20250627.pdf

PDF

Attachment+15+-+Drawing+B03+20250627.pdf

PDF

Geotechnical Engineering Report for VAMC EHRM Montrose NY

PDFgeotechnical-report

Original+attachments+1-12.zip

ZIP

Amend+5+-+B07.20260330.pdf

PDF

Amend+5+-+SITE.20260330.pdf

PDF

Infrastructure Standard for Telecommunications Spaces v3.1

PDFspecifications

Amend+5+-+B26.20260330.pdf

PDF

Montrose EHRM Addendum 01 B19 20260330

PDFamendment

Amend+5+-+B18.20260330.pdf

PDF

Attachment 33A - Construction Estimate Breakdown Template

XLSXconstruction-estimate

ATTACHMENT+20+-+Montrose.EHRM.Addendum.01.B12.20260330.pdf

PDF

Amendment 3 to Solicitation 36C77626R0033 for EHRM Infrastructure Upgrades

PDFamendment

Amend+5+-+B12.20260330.pdf

PDF

Attachment+32+-+Drawing+B52+20250627.pdf

PDF

Montrose EHRM Addendum 01 B28 20260330

PDFamendment

Attachment+22+-+Drawing+B14+20250627.pdf

PDF

Geotechnical Engineering Report for VAMC EHRM Montrose NY

PDFgeotechnical-report

Montrose EHRM Addendum 01 B26 20260330

PDFamendment

Attachment+16+-+Drawing+B04+20250627.pdf

PDF

SOP 138-22HV Construction Standard Procedures QA for Projects

PDFsop

Attachment+19+-+Drawing+B07+20250627.pdf

PDF

Supplemental Asbestos and Lead Paint Inspection Report - Montrose VA Medical Center

PDFreport

Montrose EHRM Addendum 01 B18 20260330

PDFamendment

ATTACHMENT+24+-+Montrose.EHRM.Addendum.01.B16.20260330.pdf

PDF

Attachment+23+-+Drawing+B15+20250627.pdf

PDF

Amend+5+-+B03.2020330.pdf

PDF

Attachment+28+-+Drawing+B26+20250627.pdf

PDF

ATTACHMENT+17+-+Montrose.EHRM.Addendum.01.B05.20260330.pdf

PDF

Attachment+24+-+Drawing+B16+20250627.pdf

PDF

GPRS Triple C Montrose Underground Utility Locating Report

PDFreport

Original+attachments+13-17+B01-B05.zip

ZIP

Amend+5+-+B14.20260330.pdf

PDF

Amend+5+-+B20.20260330.pdf

PDF

VHA Infection Control Risk Assessment Template for Construction and Maintenance Activities

PDFsow

Amendment 4 to Solicitation 36C77626R0033 for EHRM Infrastructure Upgrades

PDFamendment

FAR 52.222-90 Addressing DEI Discrimination Clause APR 2026

PDFclause

Attachment+14+-+Drawing+B02+20250627.pdf

PDF

Amend+5+-+B13.20260330.pdf

PDF

Attachment+18+-+Drawing+B06+20250627.pdf

PDF

Amendment 0001 to Solicitation 36C77626R0033 for EHRM Infrastructure Upgrades

PDFamendment

Attachment+30+-+Drawing+B29+20250627.pdf

PDF

EHRM Infrastructure Upgrades Montrose VAMC Project Specifications

PDFspecifications

Amendment 5 to Solicitation 36C77626R0033 - EHRM Infrastructure Upgrades

PDFamendment

Amend+5+-+B52.20260330.pdf

PDF

Amend+5+-+B29.20260330.pdf

PDF

RFP 36C77626R0033 EHRM Infrastructure Upgrades Construction

PDFrfp

Attachment+26+-+Drawing+B18+20250627.pdf

PDF

ATTACHMENT+19+-+Montrose.EHRM.Addendum.01.B07.20260330.pdf

PDF

Past Performance Questionnaire (PPQ)

DOCXpast-performance

ATTACHMENT+14+-+Montrose.EHRM.Addendum.01.B02.20260330.pdf

PDF

ATTACHMENT+27+-+Montrose.EHRM.Addendum.01.B20.20260330.pdf

PDF

ATTACHMENT+22+-+Montrose.EHRM.Addendum.01.B14.20260330.pdf

PDF

Attachment+39+-+Project+Information+Sheet+for+Contractors.docx

DOCX

ATTACHMENT+28A+-+Montrose.EHRM.Addendum.01.B27.20260330.pdf

PDF

Attachment+29+-+Drawing+B28+20250627.pdf

PDF

ATTACHMENT+1+-+SPECS+-+620-22-700.Montrose.EHRM.Spec.IFC.20260410.pdf

PDF

Attachment+13+-+Drawing+B01+20250627.pdf

PDF

Attachment 3 - Appendix B - Submittal Log

PDFother

Attachment+12+-+Additional+Security+Badging+Requirements+rev+2.pdf

PDF

Original+attachments+18-21+B06-B13.zip

ZIP

Amend+5+-+B19.20260330.pdf

PDF

Amend+5+-+B15.20260330.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Pcac (36C776)
Contacts2 people available
OfficeINDEPENDENCE, OH, 44131, USA
Organization / Agency
Department Of Veterans Affairs → Pcac (36C776)
View Agency Profile
Office AddressINDEPENDENCE, OH, 44131, USA
Contacts
Jason PhillipContract Specialist

Full Description

Show more

5-4-2026 - Amendment 5 - Extend due date to May 14, 2026 and re-upload original attachments and additional attachments.


4-27-2026 - Amendment 4 - Extend due date to May 6, 2026 and add clause 52.222-90


4-20-2026 - Amendment 3 - Provide answers to technical questions and updated attachments


4-7-2026 - Amendment 2 - Revised Instruction sections 2.8 and 2.9, additional Povision & Clauses


3-24-2026 - Amendment 1 - Posting site visit sign-in sheet


Project 620-22-700 - EHRM Infrastructure Upgrades Construction – Franklin Delano Roosevelt VA Hospital (Montrose VAMC)


2094 Albany Post Road
Montrose, NY 10548-1454


This project is a competitive Small Business Set-Aside.    

More opportunities from Department Of Veterans Affairs → Pcac (36C776)

Same awarding agency

NAICS: 236220
New
Federal
Y1DZ--519-371 Construct New CLC Phase III Minor Construction - Big Spring, TX VAMC
Solicitation # 36C77626B0011_1
The Big Spring CLC Phase III Minor Construction project is a competitive fixed-price solicitation issued by the Department of Veterans Affairs for the construction of a new 10-bed Community Living Center cottage and associated site work at the West Texas VA Health Care System in Big Spring, Texas. This project is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated contract value between 10 million and 20 million dollars. The scope includes general construction, dirt work, and the installation of specialized healthcare systems, including Siemens Desigo fire alarms, Motorola Avigilon security cameras, and HID access control. The procurement includes a base bid for general construction and several deductive alternates to eliminate specific items such as electric fireplaces, kitchen millwork, and exterior planters. The contract is subject to strict regulatory and technical standards, including the Davis-Bacon Act for prevailing wages in Howard County, Texas, and the Buy American Act. Key technical requirements involve adherence to VHA Pre-Construction Risk Assessments (PCRA) for patient and staff safety, as well as specific standards for medical gas systems and firestopping inspections. Award will be made to the responsible bidder offering the most advantageous price. Bidders must provide electronic submissions, including a signed SF 1442, a bid guarantee on SF 24, and a certification of compliance regarding subcontracting limitations. Final acceptance is contingent upon a formal inspection by the Contracting Officer's designee and the contractor's quality control personnel.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
Federal
Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC
Solicitation # 36C77626B0026
Solicitation 36C77626B0026 is a competitive design-bid-build project for the Department of Veterans Affairs to implement EHRM infrastructure upgrades and data center construction at the Malcom Randall VA Medical Center in Gainesville, Florida. The project involves replacing all data infrastructure across campus, including the removal of equipment and cabling from 59 telecom rooms, and the construction of a new 3,931 square foot data center facility. This facility will include a 1,177 square foot data center room, a generator room, and supporting spaces for mechanical, electrical, and HVAC systems. The contract is a firm-fixed-price award set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220, with a construction magnitude estimated between 20 million and 50 million dollars. The period of performance is approximately 921 calendar days from the notice to proceed, with work required to commence within 10 calendar days of that notice. Award is based on the lowest dollar value for the base bid. Key requirements include adherence to the Davis-Bacon Act for wage rates, strict compliance with VHA Infection Control Risk Assessment (ICRA) and Pre-Construction Risk Assessment (PCRA) protocols, and the use of specific brand-name systems for security, fire alarms, and building automation to ensure operational integrity. The contractor must maintain a comprehensive Quality Control organization and provide electronic bid bonds. Bids are submitted via email to the contracting office, with a final deadline of September 17, 2026.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
Federal
Y1DA--534-24-706 EHRM Data Center Upgrades Construction - Charleston
Solicitation # 36C77626B0027
Solicitation 36C77626B0027 is a sealed bid Invitation for Bid (IFB) issued by the Department of Veterans Affairs for the EHRM Data Center Upgrades project at the Ralph H. Johnson VA Medical Center in Charleston, South Carolina. This design-bid-build construction project is a competitive set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220, with an estimated construction magnitude between 2 million and 5 million dollars. The scope of work involves the demolition and renovation of approximately 1,000 gross square feet of the B200 Computer Room and associated rooftop HVAC equipment. Key infrastructure upgrades include the installation of redundant power distribution and UPS, improved computer room cooling, grounding and bonding, cable management, and raised floor modifications. The project also requires hazardous material abatement, specifically for asbestos-containing flooring and mastic. The contract is a firm-fixed-price agreement with a mandatory performance period of 365 calendar days, starting within 10 days of the notice to proceed. Award will be made to the responsible bidder based solely on the lowest price that is fair and reasonable. Technical requirements mandate the use of Gamewell FCI fire alarm systems and Siemens Desigo HVAC controls to ensure system compatibility. Bidders must submit their offers electronically by September 14, 2026, at 13:00 EDT, including a signed SF 1442, a bid guarantee on SF 24, and a certificate of compliance regarding subcontracting limitations. Compliance with Davis-Bacon prevailing wage rates and the Buy American Act is required. Final acceptance is contingent upon a series of inspections, including a contractor-led punch-out, a government pre-final inspection, and a formal final acceptance inspection.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS