Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Veterans Affairs was posted on September 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z2DA--Open Market 660-26-220 - Replace Furniture, Fixtures & Equipment for IPU

Awarded
36C25926R0053Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 15 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope repairs, new roofing, and interior reconfiguration. Key technical upgrades include the installation of new HVAC systems, rooftop air-handling units, air-cooled water chillers, exhaust extraction, compressed air systems, and a full NFPA-compliant fire suppression system. Additionally, the work covers the replacement of electrical distribution, lighting, low-voltage systems, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The contract is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The project is subject to the Davis-Bacon Act and Buy American requirements, and all work must comply with ADA accessibility guidelines. Invoicing is processed monthly via Wide Area Work Flow (WAWF) using NAVFAC Form 7300/30.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 6 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of its North Wing dormitory in Troutdale, Oregon. The project aims to restore residential rooms, bathrooms, common areas, and mechanical rooms that suffered extensive interior damage due to water intrusion. The scope of work includes drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The selected contractor must provide all labor, materials, equipment, and supervision to return the affected spaces to safe residential use, ensuring proper protection of the occupied building and minimal service interruptions. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive work plan with project phasing, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the correction of all deficiencies and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 2 days
NAICS: 236220
New
SLED
CDBG-DR HS004 New Escambia County Area Transit (ECAT) Facility
Solicitation # PD 26-27.004
Solicitation PD 26-27.004 is an invitation to bid for the construction of a new, resilient Escambia County Area Transit (ECAT) facility in Pensacola, Florida. Funded by HUD Community Development Block Grant-Disaster Recovery (CDBG-DR) grants, the project aims to replace infrastructure damaged by Hurricane Sally and subsequent flooding. The scope of work is divided into multiple lots, including the construction of an Administration Building, a Maintenance Building, a Passenger Terminal Transfer Center with ballistic-resistant ticket windows, a Bus Wash, and a Fuel Station. The new facility will be built to Enhanced Hurricane Protection Area specifications to allow it to serve as an emergency shelter and will include a regional stormwater pond to mitigate local flooding. The contract will be awarded to the most responsive and responsible firm offering the lowest bid. Bidders must submit their proposals electronically by November 23, 2026, including a bid bond for 5 percent of the total bid price, a Section 3 Business Application, and proof of active SAM registration. Compliance requirements include the Davis-Bacon Act for prevailing wages, the Americans with Disabilities Act, and OSHA safety standards. Performance is measured by specific completion timelines, such as 300 days for final completion of the Bus Wash, with liquidated damages applied per the FDOT schedule for delays. The project also emphasizes economic opportunity through HUD Section 3 requirements to provide employment and contracting opportunities to low- and very low-income residents.
Purchasing

POSTED

about 4 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
27-007 CM at Risk Sonny Carter
Solicitation # PE-61110-NONST-2027-000000116
The Bibb County Board of Education is seeking a licensed general contractor to provide Construction Management at Risk (CMAR) services for the renovation of Sonny Carter Elementary School. The project involves a one-story building of approximately 62,108 square feet, with a preliminary budget estimated at 6,000,000.00. The scope of work includes upgrades to interior and exterior flooring, finishes, classroom and administration furniture, hardware, and the replacement of kitchen equipment, playground equipment, and partial HVAC, electrical, plumbing, and security systems. The project must adhere to sustainable design principles to achieve high-performance buildings, and all work must be completed by July 21, 2027. The contract is structured as cost of work plus a fee, which will eventually convert to a Guaranteed Maximum Price (GMP). The Construction Manager will be responsible for managing approximately 30 construction packages and providing pre-construction services, including budget validation and constructability evaluations. Proposals must be submitted by December 22, 2026, and must include a fee proposal, a safety program, financial references, and a local participation plan. Award selection will be determined by a committee of school district and architect representatives based on which proposal is most advantageous to the owner. Successful offerors must provide performance and payment bonds for 100 percent of the contract sum.
Bibb County Board of Education

POSTED

about 4 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Department of Veterans Affairs Network Contracting Office 19 awarded contract 36C25926C0064 to Bexar-Advanced Solutions Group, LLC for $842,382.00. This project, identified as Open Market 660-26-220, involves the comprehensive rehabilitation of the Intensive Psychiatric Unit (IPU) at the Salt Lake City VA Medical Center. The procurement was designated as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 236220. The work is designed to address safety and compliance issues identified by the Office of Inspector General and The Joint Commission, with a performance period of 180 calendar days from the Notice to Proceed. The scope of work focuses on enhancing patient safety through the installation of ligature-resistant and tamper-proof infrastructure. Key deliverables include replacing 3,655 square feet of ceiling with mental health-grade gypsum and acoustical panels meeting specific attenuation and noise reduction standards, and installing 18 ADA-compliant stainless-steel toilets and sinks. Additionally, the contractor is responsible for replacing 27 patient room doors with 20-minute fire-rated, inward-opening units featuring anti-ligature hardware, wicket doors, and laminated glass. All installations must meet rigorous impact-resistance levels and VA material approvals, with final inspection and acceptance occurring on-site at the Salt Lake City facility.

General Info

Contract Value

$842,382

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CO, USA

Set-Aside

SDVOSBC

Award Issued Date

Potential End Date

January 23, 2027

Documents

2
DOCX, High priority: read this first4 pages · presolicitation
High
DOCX, Low priorityaward
Low

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Building 262 Renovations FLETC GlyncoOpen now, due in 15 days
  • Repair Auto Maintenance Bldg 575Open now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA

Full Description

Show more
THIS IS A PRESOLICIATION NOTICE A REQUEST FOR PROPOSAL WILL BE POSTED ON OR ABOUT MARCH 9, 2026 (i.e., estimated)
Salt Lake City VA Medical Center (SLC VAMC) Statement of Work REPLACE FURNITURE, FIXTURES & EQUIPMENT (FF&E)
Project Number: 660-26-220 Project Title: Replace Furniture, Fixtures & Equipment (FF&E) IPU
General Objectives and Requirements
Number and Title of project: 660-26-220 Replace Furniture, Fixtures & Equipment (FF&E) IPU.
Authority for the project: Veterans Affairs (VA); National Contracting Office (NCO) 19.
Purpose of the project: To replace all sinks, toilets, and locksets in all IPU patient rooms, to replace the grid ceiling in all patient areas, including the hallways, community rooms including the sunroom, where patients have physical access, as well as the sally port areas, with either a hard gypsum ceiling with access panels or a mental health grade ceiling panel system, see attached floor plan for locations of each of ceiling type. The door to the laundry area needs to be replaced with a door with built in wicket door (it s possible we may allow a new door to be installed to open outward, for the laundry room, but this must be approved by the COR) to eliminate barricade risk. All patient room and patient bathroom doors with hardware to receive new anti-ligature hardware and anti-ligature strike/latch assemblies. Must provide adequate number of sizes of anti-ligature access doors to all areas above the ceiling requiring any maintenance access. Please estimate to provide around 1 access door for every 100SF of solid ceiling installed, although final locations will need to be determined once ceiling is open and access doors can be scheduled.
Background: It was determined, through The Joint Commission (TJC) Environment of Care (EOC) and Office of Inspector General (OIG) survey, that several aspects of the IPU are degraded beyond repair.
Scope and methodology: To replace the entire grid ceiling with a gypsum ceiling, mental health grade panels and tamper-resistant access panels, all patient-use fixtures, and all patient room doors and hardware. The project shall consist of 6 distinct construction phases. This was decided after stakeholders input to maintain access to the isolation room and emergency egress.
The C&A requirements do not apply, and a Security Accreditation Package is not required.
Tasks and Associated Deliverables
Description of tasks and associated deliverables: Construction tasks and deliverables shall be in accordance with this statement of work (SOW), construction specifications, and drawings.
Complete the following tasks: To replace 1,090 SF of existing acoustical ceiling tile (ACT) ceiling system with a framed 5/8 gypsum drywall ceiling system, with access panels: Access panels must be installed and sized appropriately where maintenance access is required (junction boxes, etc.) All access panels must be tamper proof and accessible with a specialized key. Wall repair shall be a level IV finish, where disturbed, to fully match existing material and finish. To replace 2,565 SF of existing ACT ceiling system with a tamper-resistant ceiling panel system capable of a minimum sound blocking (CAC) value of 35 and sound absorption (NRC) value of 0.85. Panels shall be mechanically fastened with tamper resistant fasteners or installed with tamper resistant clips to the ceiling grid. Panels shall be accessible with a special tool and must not be openable by hand for patient safety. Panels must be sized appropriately for maintenance access (30 x 30 ). Implement manufacturers required suspension system, and HVAC diffusers and grilles. Install ceiling panel system in manner that meets manufacturer requirements. Panel color shall be approved by VA prior to ordering. To replace 18 patient-use toilets with Ligature Resistant ADA Compliant Stainless-Steel Toilet for In-Wall Mounting, with powder-coated finish on the exterior of the fixture only. No paint or power-coating or any other finish on the interior basin of the fixture. Automatic flush valves are preferred. If automatic valves are not available, please supply the COR with shop drawings for a mechanical flushing toilet. To replace 18 patient-use sinks with Ligature Resistant ADA Compliant Stainless-Steel Sink for in-wall mounting, with powder-coated finish on the exterior of the fixture only. No paint or power-coating or any other finish on the interior basin of the fixture. To replace 27 (no longer replacing the isolation room door) patient room doors with inward-opening, 20-minute rated Barrier-Resistant Interior Wood Doors. The doors shall include: Outward-opening wicket door, as close to a 34 width x 64 height as allowable by manufacturer, centered horizontally and vertically in main door, with opening 10 from bottom of door to 10 from top of door, to include: Beveled Wicket Door Edge. Laminated glass view panel (5/16 thick, 5 width x 20 height opening), horizontally set 9 from the opening side of the wicket door, vertically set 3 6 from the bottom of the view panel to finished floor; must include integral blinds in the view panel, with operable controls, with a specialized key, located on the corridor for staff access. Replacement of both C-wing and D-wing door handles with a new anti-ligature handle that matches the design of the current C-wing handles. Implement quiet action to door handles, if possible, without negatively impacting the door s fire rating. Painted metal frame around the View Panel to match patient room door color as closely as possible. Concealed wicket door hinge, as supplied by Manufacturer. A single-sided deadbolt able to accept the housing and cylinder in use at the VHASLCHCS IPU. Flush-mount door pulls. Mylar 20-minute label to be located on top of wicket door in lieu of being located on the corridor door, so that it is hidden from view and protected from tampering. Over the door alarms shall be removed, reinstalled, and recertified to confirm connection to the established alarm system. Protection Plates on the lower 10 of door, just up to the wicket door opening as close to the side and bottom edges of the door as possible. Beveled Replaceable Edge Profile. Ligature-resistant institutional privacy mortise locksets, to include: Ligature-Resistant Strikes Ligature-Resistant Tapered Collars compatible with the cylinders in use at the VA Salt Lake City Health Care Service IPU. Housing for all locks. For added security, construction hard walls must be Hard-Body Impact Resistant Classification Level 1 (90f.-lbs).
Performance Period: 180 calendar days from NTP.
Hours of work: Work shall take place during normal business hours (7:00 AM to 5:00 PM), Monday through Friday, all Federal Holidays excluded. Weekend and holiday work and work outside normal business hours may be allowed upon approval from the COR. Written notification must be given to the COR at least five working days before the weekend, holiday, or day in question.
Federal Holiday: The following Federal legal holidays are observed by this facility: New Year s Day January 1 Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in November Veteran s Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

NAICS: 334516
New
Federal
Q301--NEW | Automated Blood Bank Solid Phase Analyzer and Associated Reagents/Consumables
Solicitation # 36C25927Q0058
The Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 19 is conducting market research through a Sources Sought Notice to identify potential providers for an instrument rental reagent agreement. The requirement is for an Automated Blood Bank Solid Phase Analyzer and associated reagents and consumables to support the Rocky Mountain Regional VA Medical Center. The proposed period of performance is from April 1, 2027, through March 31, 2032. The system must be new, in current production, and FDA approved for in vitro diagnostic methods, maintaining a monthly up-time of 95 percent. Key technical requirements include the ability to perform ABO/Rh testing, antibody screening, antibody identification, antigen phenotyping, Direct Antiglobulin Tests, and crossmatching. The system must achieve a Type and Screen turnaround time of 26 minutes or less and include an automated cell washer and centrifuge. Reagents must be compatible with manual tube testing for backup purposes, or a second analyzer must be provided. The contractor is responsible for providing and maintaining an uninterruptable power supply and ensuring all hardware and software upgrades are installed within 60 days of commercial release. Interested parties must submit a capabilities statement and a completed market research questionnaire by November 25, 2026, at 1630 CST.
Analytical Laboratory Instrument Manufacturing

POSTED

4 days ago

DEADLINE

in 8 days
View Details
NAICS: 238110
New
Federal
554-27-117 Conduct Concrete and Civil Site Repairs.
Solicitation # 36C25926Q0826
Solicitation 36C25926Q0826 is a 100 percent Service-Disabled Veteran-Owned Small Business set-aside for concrete and civil site repairs at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The project, estimated between 100,000 and 250,000 dollars, involves comprehensive drainage remediation and concrete work, including removing and replacing concrete, sidewalk leveling, curb repair, sidewalk additions, wall reconstruction, and the installation of bollards. The contractor must provide all labor, equipment, and supervision, adhering to strict OSHA safety standards, including OSHA 10 certification for all personnel and OSHA 30 for supervisors. Performance is expected to begin within 10 calendar days of award and must be completed within 90 calendar days. The award will be based on best value, evaluating price, past performance on at least two similar projects of 100,000 dollars or more within the last five years, and safety records, including an Experience Modification Rate of 1.0 or less. Key requirements include the submission of a Site Specific Safety Plan, compliance with the Davis-Bacon Act, and adherence to SDVOSB limitations on subcontracting. Technical specifications mandate the use of qualified journeyman painters for coatings and strict quality control protocols, including final acceptance inspections. Proposals must be submitted via email to the designated contracting officer, including a signed SF 1442, a 20 percent bid bond, and necessary certifications.
Poured Concrete Foundation and Structure Contractors

POSTED

5 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS