This Government Contract opportunity from Department Of Veterans Affairs was posted on December 22, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z2DA--B1 Toilet Replacement (666-22-120)(VA-22-00077495)

Awarded
36C25922Q0507Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
36C25627R0012_PRESOLICITATION_NOTICE_REPLACE PERIMETER SECURITY FENCE
Solicitation # 36C25627R0012
The Department of Veterans Affairs, Network Contracting Office 16, is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) for a firm-fixed-price construction project to replace the perimeter security fence at the Veterans Health Care System of the Ozarks (VHSO) Main Campus in Fayetteville, Arkansas. The scope of work involves a turn-key operation to replace the existing perimeter fence, replace one gate, and automate gates one through eight. The project includes general construction, architectural, mechanical, electrical, and structural repairs. The estimated magnitude of construction is between 5 million and 10 million dollars, with a performance period of 365 calendar days from the Notice to Proceed. This opportunity is a 100 percent SDVOSB set-aside under the Veterans First Public Law 109-461, requiring that at least 15 percent of personnel costs be spent on employees of the prime or other eligible SDVOSB concerns. Eligible offerors must be registered in the System for Award Management (SAM) and SBA VetCert under NAICS code 236220. The solicitation will be issued as a Request for Proposals (RFP) with documents expected to be available around November 5, 2026. Requirements for submission include a bid bond, a 90-day proposal acceptance period, and the subsequent provision of performance and payment bonds upon award. Technical requirements include a certified penetrating radar survey for underground utilities and adherence to OSHA, NEC, and NFPA 70E safety standards.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 4 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
Federal
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Solicitation # W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB
The U.S. Army Corps of Engineers, supporting the U.S. Air Force, is conducting market research via a Request for Information to identify qualified industry partners for seven construction and renovation projects at Wright-Patterson Air Force Base, Ohio. These projects range in scope from the renovation of sensitive Special Access Program spaces and the construction of a 90,000 square foot research laboratory to the modernization of compressor facility systems, the decentralization of heating plants, and the repair of military dormitories. The estimated acquisition magnitudes for these individual efforts vary significantly, with the largest project valued at approximately 160 million dollars. The government intends to utilize Other Transaction Agreements and a Progressive Design-Build delivery method, which splits the work into a collaborative design and pre-construction phase followed by a construction phase based on a Guaranteed Maximum Price. Interested firms must provide detailed company profiles, evidence of cybersecurity compliance through CMMC and SPRS, and experience with complex MEP infrastructure and secure facility standards. Responses are due by November 2, 2026, and should be submitted to the primary point of contact in PDF format.
W072 Endist Louisville

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 10 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 10 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Department of Veterans Affairs awarded contract 36C25923P0192 to Betance Enterprises, Inc. for the replacement of three toilets in the Building 1 Women s Restroom at the Sheridan, Wyoming VA Medical Center. The project, valued at 39,601.46 dollars, addresses safety hazards caused by existing wall-mounted toilets pulling away from the walls. The contractor is required to install new ADA height-compliant, floor-mounted, rear-outlet toilets with manual flush valves, ensuring all work meets VA Barrier Free Design Standards and applicable building codes. The scope of work includes the temporary removal and reinstallation of restroom stalls and fixtures, plumbing adjustments, and the restoration of wall finishes, including painting and tiling to match existing specifications. The project must be completed within 90 calendar days from the Notice to Proceed. Strict adherence to safety and infection control is required, including the maintenance of a negative pressure environment, the completion of an Infection Control Risk Assessment, and the presence of an OSHA-30 certified supervisor on-site. All work must be coordinated to minimize disruption to the Administrative Operations Center, with final acceptance contingent upon successful testing, commissioning, and an Environment of Care walk-through.

General Info

Contract Value

$39,601.46

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CO, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

7

Bldg 1 As-Builts - Plumbing Drain Waste and Vent Plans

PDF, High priority: read this firstspecifications
High

Bldg 1 Restroom Tile Layout

PDF, High priority: read this firstspecifications
High

Bldg 1 Room 105 Toilets Replacement Plans

PDF, High priority: read this firstspecifications
High

Sheridan Wyoming VA Building 1 Floor Plans

PDF, High priority: read this firstspecifications
High

Solicitation 36C25922Q0507 - B1 Toilet Replacement

DOCX, High priority: read this firstrfp
High

Wage Determination WY20220014 - Sheridan County, Wyoming

PDF, High priority: read this firstwage-determination
High

Award 36C25923P0192 - B1 Toilet Replacement

DOCX, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA
Contacts
Denver RobbContract Specialist

Full Description

Show more
B1 Toilets Replacement, Project # 666-22-120 STATEMENT OF WORK INTRODUCTION: The Sheridan, Wyoming VA Medical Center (VAMC), located at 1898 Fort Road, Sheridan, WY 82801, requires the replacement of several wall-mounted toilets in their Building 1 Women s Restroom. Building 1 serves as the Administrative Operations Center for the Medical Center. Wall-mounted, rear-outlet toilets were installed a few years ago during the renovation of Building 1. All existing toilets are manual-flush type. Recently, these toilets are pulling away from the walls and creating safety hazards. The toilet carriers are not supported properly in the walls, so the toilets rotate easily during use. The Women s Restroom has been temporarily closed until the safety hazards can be remedied. New floor-mounted, rear-outlet toilets must be installed to meet VA safety, cleaning, and infection control guidelines in the restroom. STATEMENT OF WORK: General Construction project is to be completed within 90 calendar days from date of Notice to Proceed. All demo and installation work, including passing all testing and inspections, is to be completed in accordance with the Phasing section of this SOW. Contractor shall provide all equipment, materials, tools, supplies, and labor required for this project, providing negative pressure environment for work, and providing new room finishes as indicated in this SOW, the drawings, and specifications per VA construction standards. Safety submittals shall be completed prior to the commencement of on-site construction work. Material-selection submittals shall be completed and approved prior to ordering of materials for the project. The VA will provide the contractor with the specifications of the existing paint color and existing wall tile in the Building 1 Women s Restroom after contract award. The contractor must still complete material-selection submittals for the paint and wall tile. The building tenants not in the construction areas will remain at work in the building during this construction. The contractor shall make patient, staff, and visitor safety and infection control measures a priority. The contractor shall coordinate work locations and schedules with VA to minimize impact to building tenants and the Medical Center. All carpentry, architectural, electrical, mechanical work, product design, project management, and other work needed on this project shall be provided by the contractor. All electrical work low, medium, or high voltage will be installed and terminated by the contractor. No piping, cabling, or wiring shall be abandoned in place. All piping, cabling, and wiring shall be labeled. The installation must, at a minimum, be in accordance with the current versions of all applicable codes indicated in the Department of Veterans Affairs (VA) Design Manuals and VA PUBLICATIONS (Master Construction Specifications, Construction Standards, National Fire Protection Association (NFPA) Underwriters Laboratory, International Building Code IBC 2003, NFPA and National Electric Code (NEC) building codes and standards, VA Information Security Handbook 6500.6, 6550.0, VA Barrier Free Design Standard, etc.). Any penetrations through any floors, ceilings, or walls shall be fire caulked, or otherwise fire sealed, and shall be done in this contract to meet VA standards and National Fire Protection Association (NFPA) standards. Building 1 is an existing business occupancy. One-hour fire ratings must be maintained for floor separations. Any penetrations between floors must be fire caulked and meet one-hour fire ratings. Fire caulking material must be commercial-rated and be tested to ASTM E814 (UL 1479) and CAN/ULC-S115 and any VA Safety requirements that are stricter. Contractor must submit a fire caulking submittal and get it approved prior to using the product. The contractor shall inquire of the Contracting Officer s Representative (COR) if any doors, frames, associated hardware, and any other property removed is desired to be retained by the VA for reuse elsewhere within the Medical Center, at the time of removal. If the VA desires to retain an item, the contractor shall deliver it to a location designated by the COR. If the VA does not desire to retain an item, the contractor shall dispose of it properly off-site of the Medical Center. The new components installed shall be tested and commissioned, recertified, and/or tested before VA acceptance. All testing parameters must be provided by the contractor with source references to the COR and 3rd party reviewer before testing begins. Fire alarm devices that are tied into the building fire alarm system, that are affected because of this work, shall be tested before that phase of the project is complete. If any fire alarm devices are damaged, the contractor shall arrange for all required fire alarm testing and any necessary repairs by a certified company. All fire sprinkler work shall be coordinated with VA Safety to avoid accidentally setting off the system. At the conclusion of the project, the contractor shall provide the COR with a redlined set of construction drawings, showing any as-built variations from the plans as called for in the specifications. The contractor shall accomplish all work laid out in this SOW, the plans, and the specifications. Any damages caused by the contractor during the course of work must be corrected by the contractor at their expense. Contractor shall perform post-construction cleaning to remove all dust from vents, surfaces, etc. Medical Center business hours are 7:30 a.m. to 4:00 p.m. Monday Friday, excluding federal holidays. Any work outside of business hours shall be coordinated in advance with the COR. The VAMC observes eleven (11) federal holidays per year, listed below. When a holiday falls on a Saturday, it is observed the day before on Friday. When a holiday falls on a Sunday, it is observed the day after on Monday. In addition to the designated federal holidays, the Government observes any day designated by Federal Statute, Executive Order, or the President of the United States to be a federal holiday. New Year s Day January 1st Birthday of Martin Luther King, Jr. Third Monday in January Washington s Birthday Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas Day December 25th Safety and Security The contractor shall follow all safety specifications and shall always have an OSHA-30 certified person on-site, at each work location, overseeing the construction. All other construction personnel shall each have a minimum of OSHA-10 certifications. Work will be in active administrative areas of the Medical Center. The contractor shall plan for infection control measures to include dust containment, negative pressure, and cleanup to hospital standards. The contractor shall complete an Infection Control Risk Assessment (ICRA) with the COR and get it approved by Infection Control, using the VA forms and process, prior to beginning physical work. The contractor must implement all protection measures called for as a result of the ICRA. Contractor must follow all current COVID-19 VAMC station standards. The contractor shall follow strict tool control and access control in construction areas. Any unauthorized personnel found in construction areas shall be immediately reported to the COR. Each contractor personnel must obtain a temporary contractor badge when they first arrive on site. Each personnel will be required to present a Government-issued, valid photo identification (e.g., driver s license) prior to a badge being issued to them. Contractor personnel shall wear their badges in visible locations above the waist while performing work on the VAMC property. Phasing There is one phase on this project: Women s Restroom (Building 1, Room 105) Three (3) toilets Room 105 is approximately 150 square feet (sq ft) The wall tile in this restroom runs on each wall from the floor to approximately 52 above finished floor. The timing of work must be coordinated in advance with the COR. Only one restroom may be under construction at a time. The contractor must notify the COR at least 2 business days in advance of when they anticipate each phase will be completed so the COR can arrange a VA Environment of Care (EOC) walk-through of the area. The EOC walk-through must be completed, and any findings must be resolved by the contractor. Contractor will have all equipment, materials, supplies, and tools on site before physical work starts. The contractor shall minimize disruptions to the daily operations in Building 1 and the Medical Center. All construction work, including passing all testing and inspections, shall be completed within 90 calendar days from date of Notice to Proceed. Work will include: The Sheridan, WY VAMC requires the replacement of three (3) existing toilets in the Women s Restroom (Room 105) in Building 1, their Administrative Operations Center. The contractor must field verify all dimensions, finishes, layouts, and information provided under this project. If the contractor finds discrepancies, they shall report them to the COR. All work for this project must meet the current version of the VA Barrier Free Design Standard. If required, the contractor shall adjust toilet spacing, stalls spacing and size, add grab bars, and any other work required so work is compliant with this standard and all other applicable standards and codes. For each phase listed in the Phasing section: The contractor shall temporarily remove the existing stalls to access the walls and utilities behind the toilets. The contractor must provide a clean place to store the stalls and protect them from damage. The contractor shall be responsible for temporarily removing, properly storing, and reinstalling any other equipment, fixtures, or furnishings that may be in the way of the project work, such as grab bars, diaper changing stations, sanitary bins, and seat cover dispensers. The contractor shall replace each existing wall-mounted, rear-outlet toilet with a new floor-mounted, rear-outlet toilet. All existing toilets are manual-flush type. All new toilets must be ADA height-compliant, have manual Sloan brand flush valves or equal, and use a minimum of 3.5 gallons of water per flush. The contractor shall perform all necessary prep and installation work. Contractor must ensure new toilets are plumbed into existing utilities (e.g., water, sanitary sewer) properly, including adding a new flange on the backing for each toilet and tying it into existing plumbing. The existing water lines that feed the toilets may need to be relocated or adjusted to feed the new toilets. If a cleanout needs to be relocated, it will be placed approximately 2 feet higher in elevation then the main sewer pipe feeding the new toilets. After utilities and wall work is completed, contractor shall repair and patch the wall, paint it, and re-tile and grout it to match the existing finishes. The contractor shall fully caulk around the new toilets bases on the floor and around the flanges on the wall. The contractor must reinstall the stalls, ensuring that they are secure, plumb, and that all stall doors and hardware are functioning properly. Contractor must also reinstall any other equipment, fixtures, or furnishings that were temporarily removed and stored during work. All other necessary services shall be included in the Offeror s bid. Base Bid: All work listed in this SOW, the drawings, and specifications. Fees for this project shall be a lump sum. There are no deductive alternates. End of Statement of Work

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS