Z2DA--Install Compressor for SPS Cabinets 552-25-501

Active
36C25026Q0468Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract solicitation, issued by the Department of Veterans Affairs through the Network Contracting Office 10, seeks offers for the installation of compressors in SPS cabinets, specifically referenced as solicitation number 36C25026Q0468. The firm-fixed-price contract involves performance at a site in Dayton, Ohio, with a solicitation response deadline of May 21, 2026. It emphasizes compliance with federal regulations such as the Federal Acquisition Regulation (FAR) and includes specific clauses addressing diversity, equity, and inclusion (DEI), safety, security, and subcontractor management. Notably, the clause 52.222-90 mandates that neither the contractor nor subcontractors engage in racially discriminatory DEI activities, requires reporting potential violations, and conditions contract continuation on compliance. This commitment to non-discrimination extends to all tiers of subcontracting within the U.S. The technical scope entails installation, testing, and certification of gas piping systems under stringent quality and safety protocols, including maintaining a nitrogen atmosphere during installation and executing COR-witnessed operational tests validated against standards such as ASME A13.1 and relevant NFPA codes. Inspection and acceptance occur onsite, with the Government retaining formal acceptance authority. Safety requirements mandate qualified site safety officers and competent persons with formal OSHA or equivalent training, regular safety briefings, and documented weekly safety meetings coordinated through the Contracting Officer Representative. Information security provisions require safeguarding of Federal Contract Information following FAR security clauses. Proposal evaluation is based on best value considering price and past performance; however, no pricing details or option periods are specified in the solicitation. Submission is exclusively electronic using SF-1442 forms, with clear deadlines and file size constraints. The contract is administered under strict compliance, payment processes, and documentation requirements aligned with Veterans Affairs standards.

General Info

Department of Veterans Affairs contract for compressor installation in Dayton, Ohio, with DEI, safety, and compliance requirements.

Agency

Department Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)

NAICS

236220 - Commercial and Institutional Building Construction View NAICS

Place of Performance

OH

Set-Aside

NONE

Documents

(19)

Combined Specs 552-25-501 General Requirements for Dayton VA Compressor Installation

PDFspecifications

Image+3.pdf

PDF

ENDDRY Storage and Drying System Product Description

PDFspecifications

Laser In Use Notice

PDFother

Image+2.pdf

PDF

Amendment 0001 to Solicitation 36C25026Q0468

DOCXamendment

VHA+ICRA-1.3++-+552-25-501+Air+Compressor+for+SPS+cabinets+Level+IV.pdf

PDF

Image+5.pdf

PDF

Solicitation 36C25026Q0468 Install Compressor for SPS Cabinets

DOCXifb

Wage Determination OH20260093 for Montgomery County, Ohio

PDFwage-determination

VAAR 852.219-75 Notice of Limitations on Subcontracting Certificate

PDFcertificate-of-compliance

VHA Infection Control Risk Assessment Template for Construction and Maintenance

PDFicra-template

Image+1.pdf

PDF

RFI 36C25026Q0468 Install Compressor for SPS Cabinets

DOCXrfi

Amendment 0002 to RFQ 36C25026Q0468 for Install Compressor for SPS Cabinets

DOCXamendment

Dayton VAMC EndoDry Medical Air Study Report

PDFother

36C25026Q0468 Install Compressor for SPS Cabinets

DOCXpresolicitation

VHA Infection Control Risk Assessment for Construction, Renovation and Maintenance

PDFicra

VHA PCRA 552-25-501 Install Compressor for SPS Cabinets

PDFpcra

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseSolicitation
Amendment 2

Contract was updated

Posted

Solicitation

Amendment 3

Contract was updated

Amendment 0

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)
Contacts1 person available
OfficeDAYTON, OH, 45428, USA
Organization / Agency
Department Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)
Office AddressDAYTON, OH, 45428, USA
Contacts
Jeffrey P. RozemaContracting Officer

Full Description

Show more
RFI s and VA Responses on 552-25-501 Install Compressor for SPS Cabinets
Are the ceilings in Surgery hallway and the Surgery room where the cabinets are to be mounted on hard ceilings or accessible drop ceilings.
VA Response: Hard ceilings.
Are the ceilings in Endoscopy where the cabinets are to be mounted hard ceilings or accessible drop ceilings.
VA Response: Drop ceilings.
Can we obtain pictures of these areas?
VA Response: Yes (Images 1-5 attached).
Does the chase have any access panels, or will it need to be opened through drywall?
VA Response: The chase will need to be opened through the drywall.
For the containment in surgery we are assuming that needs to be solid wall (Edge Guard type) walls and not simply plastic sheets, please confirm.
VA Response: Countermined. Please refer to the ICRA attached to this solicitation. Also, negative air is to be supplied, can this exhaust through Hepa filters to the hall? If direct exhaust of the filters is needed how can this be accomplished? VA Response: Negative air shall be exhausted to the exterior of the building, per Level IV control measures described the provided ICRA. Will the work in the surgical area be after hours? Also, the work in the scope room on the first floor, is that after hours?
VA Response: As per paragraph 1 General 1.2 of the SOW, All work shall be coordinated and scheduled through the VA COR in accordance with Division 1 of the VA Standard Specification found in the TIL. All work shall be conducted during normal business hours (Monday to Friday, 0700-1700), excluding federal holidays, unless prior approval is obtained from the CO. However, some work will be approved for after hours to reduce interruptions in patient care. The contractor shall submit an RFI for approval from the CO and COR prior to after-hours work being performed. This appears to be an ICRA category B project in the surgical areas, can you confirm?
VA Response: Activity Category determined to be D not B. Will core drilling be necessary to get the piping from the basement to the 1st floor scope room. Is this supposed to occur inside the wall? What if there is no access in the wall?
VA Response: Please refer to drawings for areas that piping penetrates through the flooring.
What should the terminations of the pipe to connect to the Endodry cabinets be? Typically, we see a basic ball the size of the piping with a threaded connection for the cabinets.
VA Response: Please refer to specs section 22 63 00 for valve requirements.
The term medical and instrument air are used in the SOW. We are assuming the air just needs to meet the clean air standards and not necessarily be classified as a medical gas. A medical gas would require multiple additional master alarm points which aren't mentioned in the scope. Please confirm. We do use a medical compressor company to supply compressors (that technically meets the provisions of Instrument air.
VA Response: Highlighted in blue below. 1.1 ... suitable medical air compressor 2.1 ... instrument air compressor. The installation must comply with the current 2024 NFPA99 Standards for medical gas systems. The fresh air intake is not required for instrument error; the scope seems to indicate a fresh air intake is needed, please clarify.
VA Response: Please follow requirements specified in the scope of work. Are we responsible to hire third party verifier/tester for final inspection?
VA Response: Yes, the contractor is responsible for hiring third party verifier/tester for final inspection.
Is a bid bond required for this project? Please specify the bonding requirements for this project; I see conflicting information.
VA Response: A bid bond is not required since this solicitation is a Request for Quotes and not an Invitation for Bids. See the Bonding Information section in the RFQ Important Bidder Information regarding requirements for performance and payment bonds.

Similar Contracts