Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on March 2, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z2DA--Upgrade Paging System 695-20-101

Closed
36C25222B0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency (IEUA) is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections on energized transformers under typical load, installing standardized external oil sampling devices to improve safety and access, and performing comprehensive oil testing analysis. Additionally, the contractor is responsible for evaluating nitrogen blanket systems to ensure positive pressure and providing on-site training for up to 20 agency staff members on inspection tools and defect identification. All work must adhere to strict industry standards, including ASNT Level 1 certification for thermography, ASTM D923 for oil sampling, and NFPA 70E safety protocols. The agency intends to make a single award to the most capable offeror based on a cost-effective and time-efficient proposal. Key evaluation criteria include a proven track record of at least two similar projects within the last five years, the proposed staffing plan, personnel availability, and the fee structure. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as a Non-Collusion Statement and Workers' Compensation Certificate. The resulting contract will utilize fixed pricing with a not-to-exceed total value and may include one-year extension options at the agency's discretion. Payment will be processed electronically via ACH within 30 days of invoice approval by the Project Manager.
Inland Empire Utilities Agency

POSTED

about 9 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-2
Axia Electric LLC is soliciting bids from SBE/DBE certified firms for the Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility and Brine Ponds project in California for the Eastern Municipal Water District. The requested scopes of work include low voltage systems, fiber optics, and the supply of electrical materials. Interested subcontractors must submit their price quotes by 2:00 PM on November 18th, with a final bid deadline of November 19th, 2026. Bidders are encouraged to provide information regarding any lower-tier SBE/DBE participation to be considered during the evaluation process. Qualified bidders must be registered to perform public work pursuant to Labor Code Section 1725.5 and must adhere to the AGC Master Labor Agreements. Awardees will be bound by the prime contract terms and Axia's Standard Long Form Subcontract or Purchase Order. Minimum insurance requirements include 1 million dollars for Auto Liability and Workers Compensation, 5 million dollars for Excess Liability, and General Liability coverage of 1 million dollars per occurrence, 2 million dollars aggregate, and 2 million dollars for completed operations. Primary points of contact for the solicitation are Ryan Falk for estimating and Amy Roller for contract documents.
Axia Electric

POSTED

about 9 hours ago

DEADLINE

in 28 days
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves a qualified electrical contractor inspecting, testing, repairing, and certifying emergency lighting systems to ensure compliance with NFPA 101 (2024 Edition) and NFPA 70 standards. Key deliverables include a full inventory of fixtures, functional testing via simulated power outages, the application of durable tracking labels to each fixture, integration of maintenance requirements into the facility's Computerized Maintenance Management System, and the provision of disposal certificates for hazardous materials. The estimated contract value ranges between $25,000 and $100,000. Bids are due by December 1, 2026, and must be submitted via email with a detailed cost breakout and the official MTC Bid for Lump Sum Contract form. A mandatory physical site visit is required prior to bid submission. For bids equal to or greater than $25,000, contractors must provide a bid bond guarantee of 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. The award will be based on overall best value. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. The contract is subject to the Davis-Bacon Act, Federal Contractor Minimum Wage requirements, and FAR standards regarding work hours, safety, and the Buy American Act.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$933,555

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

WI

Set-Aside

NONE

Award Issued Date

Documents

9

09+29+00+Gypsum+Board.pdf

PDF

3+-+695-20-101+Firestop_SingleSourceJustification_MPT-SAT+Amed+1.doc

DOC

36C25222B0006+0001.docx

DOCX

36C25222B0006+0002.docx

DOCX

36C25222B0006.docx

DOCX

P01+6a+-+695-20-101+Drawings.pdf

PDF

P01+6b+-+695-22-101+Specs.pdf

PDF

P07+Wage+Decision.pdf

PDF

Paging+Site+Visit+Roster.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Feb 24, 2022 to Mar 10, 2022. NAICS code changed from 236220 to 238210. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
Contacts1 person available
OfficeMILWAUKEE, WI, 53214, USA
Office AddressMILWAUKEE, WI, 53214, USA
Contacts
Michael1 RosenthalContract Specialist

Full Description

Show more
05/17/2017 6:17 AM CLEMENT J. ZABLOCKI MEDICAL CENTER DEPARTMENT OF VETERANS AFFAIRS MILWAUKEE, WI PROJECT NAME: 111 Expand Urgent Care VA PROJECT NO: 695-402 A/E PO NO: ____________________ Construction PO No.: _____________ CLEMENT J. ZABLOCKI MEDICAL CENTER DEPARTMENT OF VETERANS AFFAIRS MILWAUKEE, WI PROJECT NAME: UPGRADE OVERHEAD PAGING SYSTEM VA PROJECT NO: 695-20-101 CONTINUATION PAGE CONSTRUCTION BULLETIN 1 Page | 1 AMENDMENT NO. 1 Page | 2 of 7 CLEMENT J. ZABLOCKI MEDICAL CENTER DEPARTMENT OF VETERANS AFFAIRS MILWAUKEE, WI PROJECT NAME: UPGRADE OVERHEAD PAGING SYSTEM VA PROJECT NO: 695-20-101 AMENDMENT NO. 1 AMENDMENT NO. 1 DATE: 3/1/2022 2:47 PM RE: RFI s for IFB 36C25222B0006 VA Medical Center 5000 West National Avenue Milwaukee, WI 53295 PROJECT NAME: Upgrade Overhead Paging System PROJECT NUMBER: 695-20-101 This Addendum consists of: Narrative - (1) Pages Sole source Justification (1) Sole source Justification were ADDED The following changes regarding the contract specifications and drawings are hereby provided by amendment. The amendment consists of deletions, additional work, and clarifications as follows: CHANGES TO DRAWINGS (see attached full size sheets): NONE CHANGES TO SPECIFICATIONS (see attached specification sections): 09 29 00 GYPSUM BOARD. Revision Date: 1-8-20 ADDED specification 09 29 00 Gypsum Board The following questions and answers provide clarification to the contract documents: General Questions: Question: Please confirm personnel requirements for this project. Can (1) superintendent fulfill SSHO requirements? Or does (1) superintendent and (1) SSHO need to be on site full-time? Response: Yes; Site Superintendent can be the SSHO and must be onsite during any and all work. Question: Please provide an abatement report. Per drawing page G-002, contaminated material is within the scope of work in Building 124. If this is the case, please provide a specification section and quantities. Response: There is no hazardous material survey in the scope of work for this project. Question: Please confirm if contract has material staging location at facility. If so, where is it? Is prime contractor responsible for any costs associated with staging? Response: See specification 01 00 00-13 1.13 Question: Please provide a specification section for gypsum board assemblies Response: Specification 09 29 00 ADDED this Amendment Question: Due to the nature of this project, a full-height gypsum infection control barrier is not recommended at each location. Constructing gypsum infection control barriers at each work location, would take up more time and cost than the actual work. Is Edgeguard an acceptable infection control barrier instead? Response: The use of temporary barriers as ICRA barriers may be approved if they comply with required fire rating requirements and must be submitted for review and acceptance. Question: Is conduit required for the entire length of all cable runs, or only in areas with exposed ceilings? Response: In all exposed areas that does not have a drop ceiling. Question: Will all 12 buildings for the paging upgrade be geared towards one contractor? Response: If awarded there will be one award. Question: What is the start date, and duration/length of the intended project? (All Buildings) Response: All work shall be completed within 534 calendar days after receiving Notice to Proceed. Question: I see the spec recommendations call for all low voltage wiring in RMC/EMT conduit, but the prints say the cable can be plenum and in a J-hook/cable tray assembly except for where areas are exposed such as garages, unfinished areas, boiler rooms, electrical rooms, etc. then those are required to be in raceway. Do the detailed description sheet notes (G. and H.) pertain to all buildings, including 111? Response: Conduits and boxes with supports shall be provided in all exposed areas without drop ceiling. Question: Will all work be done after normal working hours (7-3:30pm), or only in building 111 that interferes with normal working hours or conditions of the main hospital? Response: Yes, intent is for most work to be completed during business hours. See specification 01 01 10SN 3.20 (7:30am - 4:30pm). Ceiling work to be done after business hours. See phasing notes. Work that interferes with operations must be done on off hours. Question: The bid submission is currently called out to be submitted via USPS. Due to the current Covid-19 situation and being that this project is an IFB can we submit the total proposal via email with the bond being submitted via USPS prior to the bid due date. Response: We need original bid; they can be mailed via USPS however they need to have original signatures. You do not need to be present the time of your bid, but an original bid document need to be. No emails will be accepted. Question: Is the project tax exempt or taxable? Response: Taxable Question: The project scope includes work in 12 different buildings located all around the campus. Please, provide specific phasing of work to be completed. Is there any sequencing on what building, or floor has to be completed first? Response: See sheet T-001 Paging System Phasing Question: Are there areas withing the building where work can only be confirmed off hours? If there are, please list the areas/building/floors and time GC are available to work on. Response: See Question #10 Question: The project site map does not show a GC laydown area. Can the VA confirm if certain area is proposed for laydown? Response: See specification 01 00 00-13 1.13 Question: Can we use the existing raceways and conduit to run any new cabling and wires? Response: Yes. Question: How many speakers in total do you require? Response: speakers are shown on the drawings. Question: Do you want a one for one replacement of speakers (existing and new speakers)? Response: Drawings indicate existing speakers and new speakers that is required. Question: Are the "S" speaker icons the existing speakers that are already installed or represent the new speaker points? Response: Drawings indicate existing speakers and new speakers that is required. Question: Do you want the paging activation from only Bldg. 111 or from all Bldgs out to other buildings as well? Response: Paging activation is as shown on the drawings. Question: With the current COVID-19 situation, will the Government allow for an extension to the due date to ensure the vendor can submit the best proposal possible. Response: Amendment has bee complete to extend Bid Opening to Question: Can the Government identify the type of ceiling (sealed, drop down, etc.) and the height of the ceiling from the floor? Response: the ceiling type and height is indicated on the drawings, see ceiling table legend on T001. Question: How is this integration currently connectioned (API, I/O, custom integrations module, etc.)? Where is this current integration executed (building and room)? Response: As shown on the drawings, in the main paging cabinet. Question: As the Vendor can install indoor alert panels (wall mounted 7" and 10" color displays) that are ADA compliant to support the visually impaired with the paging alerts. Would the Government be interested in the Vendor offering these ADA compliant paging panels? Response: Bid per contract documents Question: As the Vendor can integrate in any networked Televisions into the Paging System, would the Government be interested in the Vendor offering the networked TV integration? Response: Bid per contract documents Question: As the Vendor can integrate in any outdoor digital signs, would the Government be interested in the Vendor integrating in the Digital signs? If so, how many digital signs are there to be integrated that are networked (Brand and Model). Response: Bid per contract documents Question: As the Vendor can integrate in any outdoor warning sirens, or speakers, are there any outdoor warning sirens or speakers that the Government desires to be integrated into the paging system? Response: Only the parking garages Talk a Phone as shown on the drawing and specified Question: The Vendor can provide a FEMA certified IPAWS integrated paging system that can receive automatic alerts to warn and alert the staff and patients of FEMA identified emergencies. Would the Government desire this capability? Response: Bid per contract documents Question: The Vendor can provide a paging system with a text to speech foreign language and English paging capability. Would the Government be interested in this capability? Response: Bid per contract documents Question: What is the Brand and Model of the current overhead paging system? Response: Existing old Bogen system. Question: Can the Government please provide the total number of current existing speakers are currently installed? Response: quantity of speakers is shown on the drawings. Question: How many of the existing speakers are currently fully operational? What is the Brand and Model of the speakers (watts and amps) Response: quantity of speakers is shown on the drawings, contractor to verify. Question: If the speakers are nonfunctioning, does the Government desire the vendor to replace a one for one in the exact location? Response: quantity of speakers is shown on the drawings. Question: Could the Government provide a picture of the current speakers as they are installed so that the Vendor can plan for the size of drop down or surface mounting for materials planning. Response: the speakers is round as shown, and the new speakers matches the existing as specified. The contractor is responsible for verifying the existing conditions. Question: Is the Vendor authorized to utilize the current raceways, conduit, and other available wire and cable management solutions on site? This could save the Government significant costs and time to complete the project. Response: Existing conduit can be used. All new wring to all new and existing speakers as shown on the drawings. Question: Does the Government desired to have zoning capabilities into each floor of the zoned buildings to further focus the paging to the right department to reduce interruptions? Response: paging zones are shown on the drawings. Question: Does the Government desire the new equipment to be rack or desk mounted? Is there adequate space on the rack or the desk? Is there adequate power outlets to support the new system being installed? Response: Rack mounted equipment s as shown on the drawings. Question: Where are the desired Paging Activation points in each building? Vendor understands that Building 111 will be the installation point for the paging headend and amplifiers. However, if the Government desires to have the ability to activate the paging systems from each building, the Vendor would like to know which room these activation points will be. Response: Provide paging equipment as shown on the drawings. Question: Does the Government desire to have a simple activation systems which would be microphone with the ability to choose the zones to activate. The Vendor has the capability to tie in the Government's VoIP phones into the activation capabilities to allow the staff to page from the VoIP phones. This is ideal during emergencies when alerting from the emergency incident point is desired. Response: Provide activation system as shown on the drawings and as specified. Drawing Questions: Sheet G-002 Questions: Question: General Notes #13 calls out that GC is responsible for relocation of medical equipment and store in designated areas. Provide identification of specific equipment to be relocated, and locations of storage. Also identify if specific vendors are required to be involved in any specific relocations Response: Equipment inside spaces where work is being performed must be identified and coordinated with the COR for removal and reinstallation by contractor. Question: Abatement and Contaminated Note indicated that there is ACM, Lead materials, however there is no report of drawing reflecting location of materials and quantity of materials to be removed. Provide report and information reflecting extent of Abatement required and specific locations. Response: Hazardous material survey and abatement not in Scope of Work. Question: Provide drawing(s) / information reflecting ICRA enclosure(s) and specific locations of Anti-room locations. Response: The basic information is provided for ICRA barrier requirements. The installation and location of barriers is Means and Methods and the responsibility of the Contractor. The use of temporary barriers as ICRA barriers may be approved if they comply with required fire rating requirements and must be submitted for review and acceptance. Question: In locations of ICRA barricades, provide specific floor to structure vertical heights for type A & C walls that are required. Response: Typical Main Hospital Floors Deck to Deck 11 6 and basement deck to deck 13 9 Sheet TS101 Question: Question: Provide / identify location of GC trailer and lay down area. Will trailer be adjacent to an existing building and allow for connection to existing electrical power. Connection by GC at no cost to VA. Response: See specification 01 00 00-13 1.13 Sheet 108T-101 Questions: Question: Building 108 Second Floor: Coded note 4: Provide floor construction for new sleeve penetration Response: Concrete What is fire rating at floor construction? Response: 2-hour fire rated. Sheet 111T-100A Question: Question: Warehouse B0625: Verify existing ceiling type. Being warehouse is area exposed, coded note ceiling type 5? Response: Conduits and boxes with supports shall be provided in all exposed areas without ceiling, mount speakers at 8 ft AFF. Sheet 111T-100B Question: Question: Transformer Room B0255: Verify that speaker shown on West wall is wall mounted? Symbol is not defined in Symbol Legend. If wall mounted what is mounting hgt? Response: Wall mounted 12 x12 steel speaker with baffle, mounted at 8 ft AFF. Sheet 111T-101A Question: Question: Coded note 4: confirm that existing to be removed is within brindle rings system or raceway? Response: Confirmed; there are both types of low voltage pathways (Open and closed) Question: Coded note 11: What are floor thicknesses / construction to be penetrated? Response: Typical 4 What is rating to be sealed? Response: 2 hours rated. Sheet 111T-101B Question: Question: Coded note 1: Microphone specification? Response: Bogen DDU 250nDynamic Desk Type gooseneck Microphone or equal. Microphone accessories? Response: Bogen DDU 250nDynamic Desk Type gooseneck Microphone or equal. Sheet 111T-102 Question: Question: Coded note 4: What is sleeve rating? Response: 2 hours rating. Sheet 111T-104 Question: Question: Coded note 5: What is sleeve rating and is new core drilling required? Response: 2 Hours rating Verify coded note 1 throughout and if this is the correct designation. Response: yes Sheet 111T-105 Question: Question: Coded note 5: What is sleeve rating and is new core drilling required? Response: 2 hours rating Confirm new speaker in Lounge 5436? Response: Yes, new speaker with back box, baffle and cabling. Sheet 111T-106 Question: Question: Coded note 3: What is sleeve rating. Is new core drilling required? Response: 2 hours rated. Sheet 111T-107 Questions: Question: Coded note 6: What is sleeve rating? Response: 2 hours rated Is new core drilling required? Response: Yes Sheet 111T-108 Question: Question: Coded note 6: What is sleeve rating? Is new core drilling required? Response: See question 31 Sheet 111T-109 Question: Question: Coded note 3: What is sleeve rating? Is new core drilling required? Response: See question 31 Sheet 111T-110 Question: Coded note 5: What is sleeve rating? Is new core drilling required? Response: See question 31 Coded note 3: Clarify UL listing for correct penetration rating Response: a. 2 hours rated, b. yes. 2a. 2 hours rated Sheet 123T-101A Question: Coded note 1: Clarify UL listing for correct penetration rating Response: See question 31 Sheet 123T-101B Question: Question: Coded note 2: note and symbol do not correspond. Response: See Sheet 123T-101B KEY notes No dashed line or does coded note 2 to control area in Wing A, Hallway CA1-4? Response: Control the area within the boundary which includes Wing A corridor CA1-4. Sheet T-401 Question: Question: Coded note 1: Provide rating for sleeve. Typical Response: See question 31 Question: Coded note 6: Provide rating for sleeve. Typical Response: See question 31 Sheet T-402 Question: Question: Coded note 2: Provide rating for sleeve. Typical Response: See question 31 Question: Coded note 3: Provide existing rating for sleeve. Typical Response: See question 31 Specifications Question: Question: Specification Section 07 84 00 / 2.1 Firestop Systems: calls out HILTI systems. Provide specific product information Response: Hilti is the manufacture for basis of design, and a sole soured item. See Sole Source Justification this amendment Question: Specification 01 01 10SN: Provide designation and locations of Ante room construction (1 hour rated barrier) and Ante room (ICRA only) 3.2 Asbestos Response: See question #17 Question: Specification Section 01 91 00 General Commissioning Requirements. Section is missing. Response: No 3rd party commissioning required, See section 27 08 00 for communications commissioning requirements. Question: Specification Section 02 41 00 Demolition: Can Electrical / Communication contractor utilize HEPA carts when working in corridors within facility? Response: The Contractor must comply with the ICRA requirements. How that is maintained is Means and Methods. Question: Specification sections 02 82 11 or 02 82 13 (series) for Traditional or Glove bag Asbestos Abatement. Sections are missing Response: No known ACM in work areas Question: Specification 06 10 00 Rough Carpentry: Provide clarification of carpentry scope of work? Response: The wood is for backing and the plywood is if a backer sheet is required to mount equipment. Question: Specification 09 51 00 Acoustical Ceiling: Provide specifications for acoustical ceiling tiles (2x2 and 2x4) where replacement tiles are called out or required. Response: Basis of design: Armstrong 2 x2 Dune square white. See Specification 09 51 00 The documents call out the replacement of damaged ceilings and ceiling tile and to match the existing. The spec is the basic requirements for ceiling material and installation. The replacement and repair include ceilings damaged during installation of the paging system. Question: Specification Section 09 91 00 Painting: Clarify specification is for repair of areas where renovation work takes place and painting may be required? No finish schedule can be located in drawings. Response: There is no reference to a Finish Schedule since the painting is patching to match existing conditions only. Sherman Williams Color will be provided based on the area requiring touch up. Question: Specification Section 26 05 36 Wireways for Radiology Equipment. Provide identification of specific work related to Radiology Equipment. Response: Not required. Question: Specification Sections 26 24 16 Panelboards, 26 27 26 Wiring Devices and 26 29 21 Enclosed Switches and Circuit Breakers. Specific electrical work not shown on Bid Drawings. Provide clarification and extent of work. Response: the work is shown on the drawings. Example Drawing T401 note 6. Question: Specification 27 08 00 Commissioning of Communications Systems. Clarify if Commissioning is GC responsibility or if VA responsible for this SOW? Response: See question #44 Question: Does the Government desire the Vendor to place a speaker at each speaker icon point or can the Vendor propose a new ideal installation point if after commencing the installation that there is an issue that may hinder the coverage plan. Response: existing and new speaker locations are shown on the drawings.. Question: Drawing T601 Detail 2 shows New Paging Stations. We cannon locate these on the floor plans. Please provide locations on the floor plans. (see highlighted on attached document). Response: The new paging stations are shown on the drawings. Question: Drawing T601 Detail 2 shows new feeds coming from New Paging Equip. to either a speaker or volume control as a tie-in point. We cannot locate these on the floor plans. Could you please provide the location of these tie-in points on the floor plans? (see highlighted on attached document) Response: New paging equipment are shown with plan notes on the drawings for each building. Question: Drawing 111T-101A note 6 states Existing Bogen amplifier to be replaced with new. Interconnect amplifier with new system . We cannot locate this room/amplifier on drawing T601. Please provide details on how this is to be connected. Will this require a CAT 6 cable to it like the other amplifiers on T601? Response: New paging equipment are shown with plan notes on the drawing, connections is a means and methods for the paging integrator to provide. Question: Drawing T-601 paging system zones at top right of the page lists zones 31, 32 and 33 for parking garage and lot. We cannot locate a riser diagram on T-602 for the parking garage or lots. Could clarification be provided on what is required for head end equipment for zones 31, 32 and 33? Response: Parking garages are shown on the site plan. Question: Drawing T-601 details 5 and 6 show typical paging data racks. For the new racks that need to be provided, which detail should be used? Could clarification be provided on which exact head ends get a new paging data rack? We cannot locate any fiber optic cable run to the data racks other than fiber jumpers from the existing VA network rack. Is the fiber optic patch panel required in the data rack? Could more details be provided on the POE switch in the rack? What voltage does the UPS need to be in paging rack? Response: Both details. New racks are shown and described in a plan note. Fiber optic patch is requiring and specified. Provide PoE switches as specified. 120 volt. Question: Drawing T-602, detail 12. Does a new paging microphone need to be installed and included in each building? If so, in what location are these required? Response: Provide paging microphones as specified and as shown on the drawing. Question: Spec section 01 35 26, 1.7. Question: 01 35 26, 1.7, A, 1 states The superintendent may not perform any duties for the sub-contractor as designated competent person. However, 01 35 26, 1.7, C states These Competent Persons can have collateral duties as the subcontractor s superintendent and/or work crew lead persons as well as fill more than one specialized CP role . Which is correct or required? Response: The GC superintendent cannot be the subs CP as stated. The CP works for the sub and can have multiple responsibilities within the subs purview as stated. Question: 01 35 26, 1.7, A The Prime Contractor shall designate a minimum of one SSHO at each project site. Can the SSHO have other duties or only SSHO? 01 35 26, 1.7, C states However, the SSHO has be a separate qualified individual from the Prime Contractor s Superintendent and/or Quality Control Manager with duties only as the SSHO. Is a separate SSHO, separate Superintendent and separate Quality control manager required on site at all times, dedicated only to this project? Response: The GC provides the Site Super that can also be the SSHO; to be onsite at all times of work. The Sub provides the Competent person. END

More opportunities from Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)

Same awarding agency

NAICS: 561710
New
Federal
F105--Integrated Pest Control Services for the Oscar G Johnson VA Hospital located in Iron Mountain MI
Solicitation # 36C25227Q0064
The Department of Veterans Affairs, through the Great Lakes Acquisition Center (NCO 12), has issued a Sources Sought Notice for market research purposes to identify qualified sources capable of providing integrated pest control services for the Oscar G Johnson VA Hospital in Iron Mountain, Michigan. The potential contractor will be responsible for providing all necessary management, tools, floor mats, supplies, equipment, transportation, and labor. This notice is not a formal solicitation or request for proposal, but the information gathered will help the government determine the appropriate acquisition methodology. Interested parties must submit a capabilities statement and a summary of past experience with similar projects, not exceeding 10 pages, in MS Word or PDF format by November 2nd at 8:00 a.m. Central. Submissions must include the organization's name, address, point of contact, SAM UEI number, business size, socio-economic status, and GSA contract number. For SDVOSB and VOSB contractors, a signed certification of compliance regarding limitations on subcontracting is mandatory; specifically, the contractor must certify that they will not pay more than 50 percent of the government contract value to firms that are not VIP-listed SDVOSBs or VOSBs. Failure to provide this certification will result in the response being deemed ineligible for evaluation.
Exterminating and Pest Control Services

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 561621
New
Federal
J042--Fire Alarm System Monitoring and Programming INTENT TO SOLE SOURCE
Solicitation # 36C25227Q0062
The Department of Veterans Affairs, through the Great Lakes Acquisition Center, intends to award a sole source, firm fixed price contract to Johnson Controls Fire Protection for fire and smoke alarm testing and fire suppression system services at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The contract consists of a one year base period with four optional one year extensions. The scope of work requires 24/7/365 monitoring of all fire systems across various medical, long term care, and general buildings, as well as two scheduled technician visits per month on the second and last Thursdays. All services must comply with National Fire Protection Association codes, The Joint Commission standards, OSHA, VA standards, and ISO 9000. To execute these services, the contractor must provide personnel certified in Simplex Grinnell systems and technicians with a minimum NICET Level II certification. The monitoring service must be UL 827 or FM-approved. Key administrative requirements include the appointment of a dedicated contract manager, adherence to specific check-in and check-out procedures at Building 188, and the procurement of facility identification badges. Invoicing is required on a monthly basis, with separate detailed billing for monitoring and labor services. While this is a notice of intent to sole source under 41 U.S.C. 1901, other firms may submit capability statements and references via email to the contracting officer by October 28, 2026, for evaluation.
Security Systems Services (except Locksmiths)

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
Federal
Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295
Solicitation # 36C25227B0001
Solicitation 36C25227B0001 is a sealed bidding construction project for the Department of Veterans Affairs to replace Boilers 4 and 5 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. Located in Building 112 Powerhouse, the project involves the demolition and removal of existing boilers and their associated electro-mechanical infrastructure, followed by the installation of one new firetube boiler. The base bid covers the full replacement of both units, while a deduct alternate allows for the removal of only Boiler 5, retaining Boiler 4 as a backup. The estimated project magnitude is between 2 million and 5 million dollars, with a total performance period of 455 calendar days divided into a 90-day pre-construction phase and a 275-day construction phase. This procurement is a 100 percent set-aside for CVE verified Service-Disabled Veteran-Owned Small Businesses under NAICS 238220. Eligible bidders must provide a bid bond and certify compliance with VAAR 852.219-75, which limits payments to non-VIP-listed SDVOSBs or VOSBs to 85 percent of the government payment. The contract is subject to the Davis-Bacon Act and Buy American requirements. Key technical requirements include the use of specific boiler controls from the Whesco Group and Fireye Nexus for system compatibility, strict adherence to equipment labeling and packaging standards, and the submission of monthly invoices using AIA forms G702/G703. Awarded contractors must also provide performance and payment bonds equal to the full contract value.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS