Zanesville/ Cambridge Campus Renovations
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Zane State College is seeking professional architectural and engineering services for capital improvements at its Zanesville and Cambridge, Ohio locations under project number MAT-270001. The scope of work involves two primary components: the replacement of HVAC chillers in College Hall and the Willet Pratt Training Center, including integration into the existing Niagara BAS system, and a comprehensive modernization of the network infrastructure. The technology upgrades include replacing four core network routers, two network firewalls, and the campus-wide wireless network layer to ensure compliance with NIST cybersecurity standards and improve threat detection and performance. The selected firm will be responsible for the full project lifecycle, beginning with the development of the Program of Requirements and continuing through schematic design, construction document preparation, bid support, and post-construction services. During construction, the firm must provide at least four hours of on-site administration weekly. Selection is based on qualifications, including experience with large HVAC systems, IT infrastructure, and State of Ohio design standards. Applicants must be registered design professionals and submit Form F110-330 by November 16, 2026. Compliance with State prevailing wages and specific Ohio Executive Orders regarding domestic services and prohibited Russian investments is required.
General Info
Place of Performance
Not specifiedSet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Zane State College, located in Muskingum County, Zanesville, is seeking professional architectural and engineering services for capital improvements to buildings in Zanesville and Cambridge, Ohio. The projects include HVAC Chiller replacement in College Hall, HVAC Chiller Replacement in Willet Pratt Training Center. Air cooled chiller units will be pulled into existing Niagra BAS system for system monitoring and set point adjustments. A technology infrastructure improvement project with intent of modernizing Zane State College’s network infrastructure by replacing four (4) core network routers, two (2) network firewalls, and the campus-wide wireless network layer. The upgrade will strengthen technology security, improve performance, and ensure compliance with current NIST cybersecurity standards. These enhancements are critical to protecting institutional data and mitigating risks posed by evolving cyber threats. The project will implement advanced threat detection and monitoring capabilities to proactively identify and respond to potential intrusions, align network infrastructure with NIST cybersecurity standards and best practices, and replace aging hardware to reduce downtime and improve network performance for students, faculty, and staff.
Scope of Services: Upon award of the Agreement, the selected firm shall commence by developing the Program of Requirements (POR). The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner’s project requirements. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Request for Qualifications (Registered Design Professional*) State of Ohio Standard Forms and Documents Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. During the construction period, provide not less than 4 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (FormF110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Experience with large HVAC systems and controls 2. Experience with building envelopes 3. Experience with mechanical and electrical systems 4. Experience with IT infrastructure to include core network routers, and familiarity with NIST cyber security standards 5. Experience with IT infrastructure to include network firewalls, and campus wide wireless network 6. Experience with State of Ohio facilities and construction design standards 7. Experience with project scheduling and sequencing in occupied spaces 8. Experience with higher education State funded capital projects 9. Experience with project budgeting and pay applications 10. Experience with project quality assessment and intervention. SEE A/E AGREEMENT EXHIBIT B FOR A DESCRIPTION OF ADDITIONAL SERVICES – DELETE THIS INSTRUCTION
Similar Contracts
Same NAICS industry code
More opportunities from Ohio → Zane State College
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
