Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Electrical Engineering and Lighting Design Consultant

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Electrical Engineering and Lighting Design Consultant subcontract involves providing specialized electrical design services for lighting upgrades at City recreation center projects. The selected consultant will work under prime contractors to conduct existing conditions assessments, develop fixture schedules and photometrics, and design lighting control systems. A critical requirement of the role is ensuring all designs comply with the California Title 24 Energy Code through the use of AutoCAD and lighting simulation software. To qualify for this engagement, the consultant must hold a valid California Professional Engineer license. Key deliverables include comprehensive existing conditions reports, photometrics, and stamped electrical construction drawings. This opportunity is managed by the California Capital Projects Construction agency, with a response deadline set for December 11, 2026.

General Info

Licensed CA engineer provides Title 24 lighting design for City recreation center projects.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-085-RFP.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Architectural and Engineering (A&E) Services for a Recreation Center Lighting Upgrade

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Capital Projects - Construction
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical design for lighting upgrades for prime contractors on City recreation center projects. Conducts existing conditions assessments, develops fixture schedules and photometrics, and designs lighting control systems. Ensures compliance with California Title 24 Energy Code using lighting simulation software and AutoCAD. Requires California PE license. Delivers existing conditions reports, photometrics, and stamped electrical construction drawings.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, a project with an estimated budget of 350,000 dollars and a duration of 18 months. The primary objective of the study is to evaluate existing, planned, and potential managed lane facilities to identify priority segments ready to advance into the Project Initiation Document phase. The work is structured into four key tasks: project management and coordination, segment inventory and screening, priority segment advancement assessment for up to two segments, and the delivery of a final study report with technical appendices. This is a firm fixed price contract requiring the consultant to provide designated key personnel and adhere to Level 1 Health, Safety, and Environmental specifications, including compliance with CCR Title 8. Invoicing occurs on a monthly basis, with payments remitted within 30 calendar days of approval, and final acceptance is contingent upon the release of retention. Proposals must be submitted electronically via the OpenGov portal by November 30, 2026, and must include a detailed cost proposal across the four specified tasks. Consultants are also required to disclose any conflicts of interest and may be required to file Statements of Economic Interest.
Planning-Planning & Analysis

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Capital Projects - Construction

Same awarding agency

NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento is soliciting bids under solicitation 26-091-ITB for the Corpyard Phase II project, which involves the structural anchoring and welding of fourteen existing shipping containers to a cement-treated asphalt surface. The scope of work includes container pre-checks, anchor installation, drilling and cleaning of holes using Bolthold, welded angle connections, and rust protection, all performed according to PSE stamped drawings and structural calculations. The project requires a final inspection by the City's Building department and special inspections during installation. The anticipated project value is 35,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals through the City's e-Procurement Portal by November 10, 2026, including a bid security of at least 10 percent of the total bid price. Requirements for the contractor include registration with the California State Department of Industrial Relations, compliance with prevailing wage rates, and adherence to various federal and state labor laws, including the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Executive Order 11246. Additionally, contractors must provide a Workers' Compensation certification and comply with ISO standards for shipping container certification. The project is managed by Project Manager II Mubusi Muhapi and overseen by the Director of Capital Projects, Jaipal Chahal.
Structural Steel and Precast Concrete Contractors

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
New
SLED
Corpyard Phase II - Concrete Ramp Coating
Solicitation # 26-092-ITB
Solicitation 26-092-ITB, titled Corpyard Phase II - Concrete Ramp Coating, is an invitation for bids issued by the City of West Sacramento, California, through its Capital Projects - Construction agency. The project requires the installation of a commercial-grade, chemical-resistant, and anti-slip surface flooring system on a concrete ramp measuring approximately 50 feet by 78 feet. The specified system consists of a 1/4-inch urethane cement base coat, non-slip aggregate, and a polyaspartic topcoat designed to withstand heavy vehicular torque, continuous tire scrubbing, and organic acid exposure from green waste. All work must comply with the City of West Sacramento Standard Specifications 2002 and Caltrans Standard Specifications 2015. The contract will be awarded to the apparent low bidder, with the three lowest bidders allowed seven calendar days to provide data for any product or material substitutions. Bidders must submit their proposals via the City's e-Procurement Portal by November 10, 2026, at 2:00 PM. Required submission documents include a signed W-9, legal company identification, a comprehensive technical response in PDF format, and a cost proposal entered into the electronic pricing table. A bid security of at least 10 percent of the total bid price is required. Successful contractors must provide both payment and faithful performance bonds equal to 100 percent of the contract price and adhere to California Department of Industrial Relations prevailing wage rates. Registration with the California State Department of Industrial Relations per Labor Code section 1725.5 is mandatory. Project administration will be managed through the Virtual Project Manager (VPM) cloud-based system. Final acceptance of the work is determined by the Engineer, who also serves as the sole judge for any equivalency determinations regarding material substitutions.

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS