Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Industrial Concrete Ramp Coating Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Industrial Concrete Ramp Coating Installation involves providing specialized industrial flooring services for prime contractors on City of West Sacramento facility projects. The scope of work includes comprehensive surface preparation through pressure-washing, degreasing, and shotblasting or grinding, followed by the application of a multi-layer system featuring a 1/4 inch urethane cement base coat, non-slip aggregate, and a polyaspartic topcoat to ensure a chemical-resistant and non-slip finish. Qualified contractors must hold a valid CSLB license and ensure all work complies with the 2015 Caltrans Standard Specifications. The project falls under NAICS code 238320 and requires the delivery of a fully warranted completed ramp. Interested parties must submit their responses by November 10, 2026.

General Info

Subcontract for industrial concrete ramp coating installation in West Sacramento due November 10, 2026.

Documents

This scope was carved out of 26-092-ITB.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Corpyard Phase II - Concrete Ramp Coating

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Capital Projects - Construction
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs industrial flooring installation for prime contractors on City of West Sacramento facility projects. Pressure-washes and degreases surfaces, shotblasts or grinds concrete, and applies a multi-layer system consisting of 1/4" urethane cement base coat, non-slip aggregate, and polyaspartic topcoat. Requires CSLB license and compliance with Caltrans Standard Specifications 2015. Delivers a completed, warranted, chemical-resistant, non-slip coated ramp.

Similar Contracts

Same NAICS industry code

NAICS: 238320
New
SLED
Weill Institute SMSR 2022-23 Repaint Building Exterior
Solicitation # 20261027022
The Kern Community College District is soliciting proposals for the Weill Institute SMSR 2022-23 Repaint Building Exterior project in Bakersfield, California. The scope of work includes providing all labor, materials, equipment, and supervision to pressure wash, prepare, repair, seal, prime, and paint various exterior surfaces, including metal columns, wood guardrails, stucco, brick, concrete, CMU walls, light poles, generator enclosures, gates, and monument signs. An optional Alternate #1 is included for the preparation and painting of second-floor siding on the south side. The contractor must adhere to manufacturer recommendations for all materials, protect adjacent landscaping and surfaces from overspray, and coordinate scheduling with the college to minimize office hour interruptions. The contract will be awarded to the responsible proposer with the lowest total aggregate proposal. Key requirements include a C-33 license, adherence to prevailing wage rates for proposals exceeding 1,000 dollars, and a one-year workmanship guarantee. Bonding requirements include a 10 percent bid bond for proposals of 45,000 dollars or more, and 100 percent payment and performance bonds for contracts of 25,000 dollars or more. Insurance must be provided by a carrier with a Best Key Rating Guide A or better. The contractor must commence work within five calendar days of the notice to proceed and is required to notify the owner one week prior to completion for final inspection. Submissions must be delivered in a sealed envelope with original wet signatures and include a Non-Collusion Affidavit, Prevailing Wage Compliance Certificate, and Certification of Workmen's Compensation.
Kern Community College District

POSTED

about 5 hours ago

DEADLINE

in 22 days
View Details

More opportunities from California → Capital Projects - Construction

Same awarding agency

NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento is soliciting bids under solicitation 26-091-ITB for the Corpyard Phase II project, which involves the structural anchoring and welding of fourteen existing shipping containers to a cement-treated asphalt surface. The scope of work includes container pre-checks, anchor installation, drilling and cleaning of holes using Bolthold, welded angle connections, and rust protection, all performed according to PSE stamped drawings and structural calculations. The project requires a final inspection by the City's Building department and special inspections during installation. The anticipated project value is 35,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals through the City's e-Procurement Portal by November 10, 2026, including a bid security of at least 10 percent of the total bid price. Requirements for the contractor include registration with the California State Department of Industrial Relations, compliance with prevailing wage rates, and adherence to various federal and state labor laws, including the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Executive Order 11246. Additionally, contractors must provide a Workers' Compensation certification and comply with ISO standards for shipping container certification. The project is managed by Project Manager II Mubusi Muhapi and overseen by the Director of Capital Projects, Jaipal Chahal.
Structural Steel and Precast Concrete Contractors

POSTED

about 4 hours ago

DEADLINE

in 13 days
View Details
New
SLED
Corpyard Phase II - Concrete Ramp Coating
Solicitation # 26-092-ITB
The City of West Sacramento has issued Invitation to Bid 26-092-ITB for the Corpyard Phase II Concrete Ramp Coating project. The scope of work involves providing all labor, equipment, and materials to install a commercial-grade, chemical-resistant, and anti-slip surface flooring system on a concrete ramp measuring approximately 50 feet by 78 feet. The required system consists of a 1/4-inch urethane cement base coat, non-slip aggregate, and a polyaspartic topcoat designed to withstand heavy vehicular torque, continuous tire scrubbing, and organic acid exposure from green waste. The estimated project value is 35,000 dollars, and the contract will be awarded to the apparent low bidder. Bids must be submitted through the City's e-Procurement Portal by November 10, 2026, at 2:00pm. Required submission documents include a signed W-9, legal company identification, a technical response in a single PDF, and a cost proposal entered into the electronic pricing table. Bidders must provide a bid security of at least 10 percent of the total bid price, and the successful contractor must furnish both payment and faithful performance bonds equal to 100 percent of the contract price. Compliance requirements include adherence to California Department of Industrial Relations prevailing wage rates and registration under Labor Code section 1725.5. The project must follow City of West Sacramento Standard Specifications 2002 and Caltrans Standard Specifications 2015. Additionally, the contract incorporates FHWA-1273 federal-aid construction provisions, requiring strict adherence to non-discrimination laws, safety standards, and federal debarment certifications. Contractors must also meet specific insurance requirements, including Commercial General Liability and Workers' Compensation, naming the City as an additional insured. Project administration will be managed via the Virtual Project Manager cloud-based system.

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS