Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Chemical Anchoring & Asphalt Substrate Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Chemical Anchoring and Asphalt Substrate Installation involves providing specialized drilling and chemical epoxy setting services for prime contractors on City of West Sacramento capital projects. The scope of work requires drilling and cleaning holes in cement-treated asphalt and utilizing the Bolthold asphalt anchoring system to install chemical and structural bonding epoxy in strict accordance with PSE stamped drawings. The project entails the delivery and installation of 672 chemical anchors. This effort falls under NAICS code 238110 and is managed through the Capital Projects Construction agency. Interested parties must adhere to the response deadline of November 10, 2026.

General Info

Subcontract for installing 672 chemical anchors in West Sacramento by November 10, 2026.

Documents

This scope was carved out of 26-091-ITB.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Capital Projects - Construction
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs drilling and chemical epoxy setting for prime contractors on City of West Sacramento capital projects. Drills holes in cement-treated asphalt, cleans holes, and utilizes the Bolthold asphalt anchoring system to set chemical/structural bonding epoxy per PSE stamped drawings. Delivers 672 installed chemical anchors.

Similar Contracts

Same NAICS industry code

More opportunities from California → Capital Projects - Construction

Same awarding agency

NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento has issued solicitation 26-091-ITB for the Corpyard Phase II project, which requires the structural anchoring and welding of 14 existing shipping containers to a cement-treated asphalt surface. The scope of work includes container pre-checks, drilling and hole cleaning, the installation of Bolthold asphalt substrate, bolting down ASTMA36 plates using epoxied steel rods, and performing AWS welding to secure the plates to the container framing. To prevent corrosion, the contractor must apply a zinc-rich cold galvanizing rust-inhibiting coating. All work must be performed by a licensed contractor holding a current California C-51 or C-60 license and must adhere to PSE stamped drawings, structural calculations, and standards including ASCE 7-22, CBC 2022, and AISC 360-16. Final acceptance is contingent upon a successful inspection by the City's Building department. The estimated project value is 35,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically via the OpenGov portal by November 10, 2026, at 1:00 pm, and must include a bid security of at least 10 percent of the total bid price. The successful bidder is required to provide performance and payment bonds equal to 100 percent of the contract price and must comply with California prevailing wage requirements and DIR registration. Additionally, the contractor must utilize the Virtual Project Manager system for submittals and maintain comprehensive insurance coverage, including Commercial General Liability and Workers Compensation. As a federal-aid construction project, the contract mandates strict adherence to FHWA-1273 provisions, including nondiscrimination and equal employment opportunity policies.
Structural Steel and Precast Concrete Contractors

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details
New
SLED
Corpyard Phase II - Concrete Ramp Coating
Solicitation # 26-092-ITB
The City of West Sacramento has issued Invitation to Bid 26-092-ITB for the Corpyard Phase II Concrete Ramp Coating project. The scope of work involves providing all labor, equipment, and materials to install a commercial-grade, chemical-resistant, and anti-slip surface flooring system on a concrete ramp measuring approximately 50 feet by 78 feet. The required system consists of a 1/4-inch urethane cement base coat, non-slip aggregate, and a polyaspartic topcoat designed to withstand heavy vehicular torque, continuous tire scrubbing, and organic acid exposure from green waste. The estimated project value is 35,000 dollars, and the contract will be awarded to the apparent low bidder. Bids must be submitted through the City's e-Procurement Portal by November 10, 2026, at 2:00pm. Required submission documents include a signed W-9, legal company identification, a technical response in a single PDF, and a cost proposal entered into the electronic pricing table. Bidders must provide a bid security of at least 10 percent of the total bid price, and the successful contractor must furnish both payment and faithful performance bonds equal to 100 percent of the contract price. Compliance requirements include adherence to California Department of Industrial Relations prevailing wage rates and registration under Labor Code section 1725.5. The project must follow City of West Sacramento Standard Specifications 2002 and Caltrans Standard Specifications 2015. Additionally, the contract incorporates FHWA-1273 federal-aid construction provisions, requiring strict adherence to non-discrimination laws, safety standards, and federal debarment certifications. Contractors must also meet specific insurance requirements, including Commercial General Liability and Workers' Compensation, naming the City as an additional insured. Project administration will be managed via the Virtual Project Manager cloud-based system.

POSTED

2 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS