Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

3 Rivers Telephone Cooperative Inc.

UEI: SLED_86CD9E33EE775A8A

3 Rivers Telephone Cooperative Inc. is a federal contractor, registered under UEI SLED_86CD9E33EE775A8A. It has been awarded $62,921 across 1 federal contract. Primary work spans Power and Communication Line and Related Structures Construction. Top awarding agencies include 690567 Western Federal Lands Division.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_86CD9E33EE775A8A

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
690567 Western Federal Lands Division$62.9K100%
Awards by NAICS
237130 - Power and Communication Line and Related Structures Construction$62.9K100%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in 3 Rivers Telephone Cooperative Inc.'s top NAICS codes and agencies

NAICS: 237130
New
SLED
Central Utility Plant Expansion Bid Package 03a – Site Electrical Infrastructure Extension (Design Build)
Solicitation # 20260729028
This design-build contract addresses the site electrical infrastructure extension for the Central Utility Plant expansion at UC Davis Health in Sacramento, specifically focusing on Bid Package 03a. The project involves extending electrical service from SMUD to support a new 40,000 square foot CUP Annex and 9,000 square feet of renovations to the existing CUP, while establishing a redundant normal power feed via a new SMUD East City feed to ensure system reliability. The electrical infrastructure upgrade is critical to powering the California Tower replacement hospital and other campus-wide utility improvements, requiring seamless coordination with SMUD, the CUPx team, and multiple university stakeholders. The scope includes both HCAI-regulated and non-HCAI components, demanding adherence to diverse regulatory standards and collaboration with multiple Authorities Having Jurisdiction. Multiple design phases and permits are necessary to accommodate the complexity of interfacing with municipal, state, and institutional requirements. The solicitation, numbered 20260729028 and classified under NAICS code 237130, is managed by the University of California Davis Health and is set to close on August 14, 2026. The work is located at 4800 2nd Avenue, Sacramento, with Pierce Salamack identified as the primary point of contact. The project leverages a design-build delivery method to streamline integration between design and construction, enabling efficient execution of the electrical system expansion. No set-aside type is specified, and the state agency is operating under California’s SLED classification. All deliverables must align with the project’s urgency to support broader healthcare infrastructure goals, with design and construction activities tightly synchronized to meet the operational deadlines of the California Tower and related campus expansions.
University of California Davis Health

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
Federal
Z2DA--519-20-200 VABS Replace Boiler Plant Solicitation 36C25726B0006
Solicitation # 36C25726B0006
The solicitation for the Z2DA--519-20-200 VABS Replace Boiler Plant, identified by number 36C25726B0006, was posted on April 21, 2026, with six amendments issued through July 30, 2026, and a response deadline of August 17, 2026. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under FAR 19.14, with NAICS code 237130, managed by the Department of Veterans Affairs’ Network Contracting Office 17 in San Antonio, Texas, and performance required at Big Spring, Texas. Offerors are solely responsible for monitoring SAM.gov for all amendments, clarifications, and updates; failure to do so will render a proposal non-responsive without recourse. The solicitation operates under a Lowest Price Technically Acceptable (LPTA) evaluation model, with award based strictly on conformance, responsiveness, and lowest price, with no considerations for technical approach, past performance, or management plan. The scope of work involves the installation, commissioning, and testing of boiler plant systems, including steam generation, controls, instrumentation, and safety interlocks, with deliverables requiring manufacturer literature, operating manuals, as-built drawings, test reports, and compliance documentation per ASME, ANSI, NFPA, IPC, and VA-specific standards. Inspection and acceptance occur at the job site, governed by FAR 52.246-12 and other standards including NEC and NFPA 99, with testing requirements such as insulation-resistance checks, thermographic surveys, and functional performance validation. Invoicing must be submitted electronically via VA’s EIPP system through the Tungsten Network; no WAWF or other alternatives are permitted. Contract administration is overseen by COR Horacio Fernandez. Special requirements under the VA Veterans First Contracting Program mandate that no more than 85% of non-material payments be made to non-SDVOSB subcontractors in general construction and 75% in special trade construction, with all SDVOSB subcontractors required to be SBA-certified and a certificate of compliance submitted. Joint ventures are permitted but must comply with 13 CFR §128.402, and VAAR 819.70 supersedes any conflicting SBA rules. Proposals must
257-NETWORK Contract Office 17 (36C257)

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237310
New
Federal
MT PRAIRIE 2016(3), Milwaukee Bridge Resurfacing and Rehabilitation
Solicitation # 69056726B000003
The solicitation for the MT PRAIRIE 2016(3) Milwaukee Bridge Resurfacing and Rehabilitation project in Prairie County, Montana, is a federal construction procurement issued by the U.S. Department of Transportation’s Western Federal Lands Division under solicitation number 69056726B000003, classified under NAICS code 237310 with no set-aside. The project involves a 0.348-mile stretch located five miles west of Terry, Montana, and includes comprehensive bridge rehabilitation work such as replacing existing timber decking with an open grid steel deck, removing and installing steel bridge rail, repairing concrete piers, modifying backwalls at Bents 1 and 5, installing a new steel floorbeam system, conducting scour remediation, and resurfacing approach roads with roadway aggregate. Additional scope elements encompass clearing and grubbing, removal and resetting of fencing, implementation of erosion control measures, and both temporary and permanent traffic control systems as outlined in FP-14 specifications. The contractor must provide a containment system and worker protection plan per Section 203, ensure contractor quality control and testing per Division 150, and comply with material standards including ASTM A123 for galvanized steel posts and ASTM B221 Alloy 6061-T6 aluminum. The contract includes line items for mobilization, surveying, structural steel fabrication (382,000 pounds), bridge rail installation (2,170 linear feet), temporary support structures, and labor hours for flagging (200 hours), among others, with an estimated project value between $5 million and $10 million. The bid opening was originally scheduled for August 4, 2026, but has been extended to August 6, 2026, with all documents, including updated amendments, Q&A documents, and final plans, available through SAM.gov. The place of performance is Terry, Montana, with a tentative completion date in fall/winter 2026, and all technical inquiries must be directed to wfl.plans-spec@dot.gov while general questions should be directed to wfl.contracts@dot.gov or 360-619-7520. No site tours will be conducted, and proposers are advised to monitor SAM.gov for the latest updates, having been provided with preliminary and final plans, quantity summaries, and detailed construction specifications under the Construction Contract
690567 Western Federal Lands Division

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 237130
New
SLED
CVIN, dba Vast Networks State Route 99 Middle-Mile Broadband Network Project (Encroachment Permit 03-25-6-BB-1277)CVIN, doing business as Vast Networks, is partnering with the California Department of Technology and the California Department of Transportation to deploy a middle-mile broadband infrastructure project along State Route 99 in Butte County, specifically between post mile 38.207 and post mile 45.975. The project involves the installation of conduit, fiber optic cable, and associated vaults to enhance regional broadband connectivity, with all work occurring under Encroachment Permit 03-25-6-BB-1277. The initiative is designed to support statewide digital infrastructure goals by expanding high-capacity network access in underserved areas along this corridor. The project is managed by Caltrans, District 3 based in Marysville/Sacramento, and the primary point of contact is Dotrik Wilson, Branch Chief, reachable at 530-821-3054 or dotrik.wilson@dot.ca.gov. Cindy Kinkade of AECOM serves as the Project Manager and can be contacted at 619-917-8235 or cindy.kinkade@aecom.com. The solicitation was posted on July 30, 2026, and the place of performance is centered in Red Bluff, California. The project falls under a forecast listing with no assigned NAICS code or set-aside classification, indicating it is an advance notice for upcoming procurement activity rather than an active solicitation. All project details and documentation are accessible via the provided ceqanet link.
Caltrans, District 3 - Marysville/Sacramento

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237130
New
SLED
Arcadian Interstate 5 Middle-Mile Broadband Network Project (Encroachment Permit 03-25-6-BB-0290Arcadian, in partnership with the California Department of Technology and the California Department of Transportation, is moving forward with the installation of underground broadband infrastructure along Interstate 5 in Sacramento County, specifically between mileposts 0.2 and 14.9. The project will involve laying conduit, deploying fiber optic cable, constructing vaults, and placing markers to support middle-mile broadband connectivity. This initiative is being executed under Encroachment Permit 03-25-6-BB-0290 and is aimed at enhancing regional digital infrastructure by creating a robust underground communications network beneath the freeway corridor. The work will be coordinated closely with state transportation authorities to ensure compliance with highway safety and maintenance standards. The project is forecasted and was posted on July 30, 2026, with Caltrans District 3 in Marysville/Sacramento serving as the overseeing agency. Primary contact for the state is Dotrik Wilson, Branch Chief, reachable through the California Department of Transportation, while Tiffanny Hale of Arcadian serves as the project manager and primary point of contact for the contractor. All work will take place within California, and details of the project can be accessed through the state’s CEQA Net portal. No set-aside classification or NAICS code is indicated, suggesting the procurement is not restricted to specific business categories at this stage, and no formal solicitation number has been assigned yet.
Caltrans, District 3 - Marysville/Sacramento

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237130
New
SLED
Frontier Project 5288532Frontier Communications plans to deploy approximately 40,208 linear feet of underground fiber-optic broadband cable within existing public road rights-of-way in the Alturas area of Modoc County, California, to replace outdated copper telecommunications infrastructure. The project is divided into five non-contiguous segments located along Buck Lane, Hat Mountain Road, County Road 54, County Road 76, and County Road 260, with construction methods primarily involving horizontal directional drilling and trenching, supplemented by bore pits and utility pole connections where needed. Each segment has defined start and end points along specific road intersections, ensuring the new fiber network connects key areas without requiring new easements or extensive road disruptions. The work aims to enhance broadband reliability and speed for residents and businesses in the region by leveraging existing public infrastructure. The project is formally identified as Frontier Project 5288532 and was posted as a forecast on July 30, 2026, under the oversight of Modoc County. Primary point of contact for the county is Sean Curtis, Interim Planning Director, while Greg Bordelon of Frontier Communications serves as the company’s engineering liaison. The initiative is focused exclusively on upgrading telecommunications capacity within established county rights-of-way, avoiding new land use or environmental disturbances. The full scope and precise technical specifications are detailed in Attachment A – Project Description, which outlines the methodology, material standards, and alignment of each segment. All work is designed to be minimally invasive, using existing utility corridors and infrastructure connections to streamline deployment and reduce long-term maintenance needs.
Modoc County

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237130
New
SLED
EDPP Surge Tank Control Line Project Phase 2 Additional WorkThe San Joaquin Field Division will execute critical infrastructure upgrades between the Edmonston Pumping Plant and Edmonston surge tank, involving the removal of twenty aging power poles and installation of eight new ones, along with 1.5 miles of fiber optic cable and replacement of 0.25 miles of damaged conductor cable. Access challenges in remote or inaccessible terrain will be addressed using helicopters to transport personnel, equipment, and new poles, while ground-based machinery like pickup trucks, digger derricks, and air compressors will support work in accessible zones. Old poles will be cut below grade and airlifted out, and crews will manually transfer existing wires from old to new poles after climbing them. Fiber installation will proceed without ground disturbance, with rope rigs installed at Pole VV and fiber pulled by hand from Pole 001, with all splices and connections completed on site by SJFD staff. Damaged #4 conductor between poles LL and VV will be replaced with #2 ACSR conductor, accompanied by reframing of three poles, with conductor pulled directly without ropes. All equipment will remain on designated roads and paved or graveled staging areas, with foot and helicopter access used exclusively elsewhere. The operation will utilize two ¾-ton pickup trucks, two 55-foot AWD bucket trucks, two 47-foot AWD digger derricks, two air compressors, one rope rig, a helicopter, a water buffalo, a flatbed truck, and a telehandler or forklift. This work is essential to maintain reliable water delivery infrastructure to southern California.
California Water Resources, Department of

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237130
New
SLED
Arcadian Interstate 5 & 80 & State Route 51 Middle-Mile Broadband Network Project (Encroachment Permit 03-26-6-BB-0818)The California Department of Transportation, District 3, is planning to install middle-mile broadband infrastructure along key highways in Sacramento County, including I-5, I-80, and SR 51, with work spanning multiple specific路段 intervals on each route. The project involves placing conduit and fiber optic cable along these transportation corridors to support expanded broadband connectivity, and it is linked to the previously approved Encroachment Permit 03-25-6-BB-0298. The effort is part of a broader initiative to enhance regional digital infrastructure by leveraging existing state right-of-way to minimize environmental and logistical disruption while expanding high-speed network access. The project is classified as a forecast and is administered under Encroachment Permit 03-26-6-BB-0818, with primary oversight from Dotrik Wilson, Branch Chief at Caltrans, and Tiffanny Hale, Project Manager at Arcadian Infrastructure. Work activities are confined to designated segments within Sacramento County, and all construction will comply with state transportation and utility installation standards. The project timeline is set for 2026, with the official posting date recorded as July 30, 2026, and the point of contact for inquiries is available through the provided agency email and phone details.
Caltrans, District 3 - Marysville/Sacramento

POSTED

1 day ago

DEADLINE

N/A
View Details