Frontier Project 5288532

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Frontier Project 5288532 involves the installation of approximately 40,208 linear feet of underground fiber-optic broadband cable within existing county road rights-of-way in the Alturas area of Modoc County, California. The primary objective of the project is to upgrade the telecommunications network by replacing aging copper infrastructure with fiber-optic facilities to improve broadband and communication services. Construction will be executed across five non-contiguous segments located along County Road 260, County Road 54, County Road 76, Buck Lane, and Hat Mountain Road. The work will primarily utilize horizontal directional drilling and trenching, including the creation of bore pits and utility pole connections. The project is managed by the County of Modoc, with Sean Curtis serving as the lead agency contact. To ensure environmental compliance, the project is exempt from CEQA under Public Resources Code Section 21080.51, provided that all disturbed areas are restored to pre-project conditions and applicable avoidance and minimization measures are implemented. The specific installation lengths include 6,615 feet on County Road 260, 15,140 feet on County Road 54, 6,883 feet across County Road 54 and 76, 1,020 feet on Buck Lane, and 10,550 feet on Hat Mountain Road.

General Info

Frontier deploys 40k ft of fiber underground in Modoc County along five road segments using existing rights-of-way.

Agency

California → Modoc County

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Alturas, CA

Set-Aside

NONE

Documents

(1)

NOE EX26-10 Frontier Project Broadband Installation

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Modoc County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Modoc County
Office AddressN/A
Contacts
Sean CurtisInterim Planning Director
Frontier Communications c/o Greg BordelonMGR, Engineering

Full Description

Show more
See Attachment A – Project Description for a detailed description of the proposed project. Frontier proposes to install approximately 40,208 linear feet of underground fiber-optic broadband cable within existing County road rights-of-way in the Alturas area of Modoc County. The project consists of five non-contiguous segments located along Buck Lane, Hat Mountain Road, County Road 54, County Road 76, and County Road 260. Construction will primarily utilize horizontal direction drilling (HDD)and trenching, with associated bore pits and utility pole connections where necessary. The project will replace existing copper telecommunications infrastructure with fiber-optic facilities to improve broadband and communication services. The project includes the following work areas: Location 1: Approximately 6,615 linear feet along County Road 260, beginning approximatelyg0 feet north of the intersection of County Road 60 and County Road 260 at a proposed utility pole, extending south and then west along County Road 260, and terminating at an existing utility pole approximately 170 feet north of the intersection of County Road 250 and County Road 251. Location 2: Approximately \5,L4O linear feet along County Road 54, beginning approximately 330 feet west of the intersection of County Road 60 and County Road 54 and extending east to approximately 255 feet west of the intersection of County Road 76 and County Road 54. Location 3: Approximately 6,883 linear feet beginning approximately 200 feet west of the intersection of County Road 54 and County Road 76, extending west before turning north along County Road 76, and terminating approximately 1,310 feet east of the intersection of Pit River Road and County Road 76. Location 4: Approximately 1,020 linear feet beginning at the intersection of County Road 76 and Buck Lane, extending north along Buck Lane to its terminus. Location 5: Approximately 10,550 linear feet beginning at the intersection of County Road 75 and Hat Mountain Road, extending north along Hat Mountain Road, crossing to the opposite side of the roadway, and continuing north to the end of Hat Mountain Road. The project is designed to upgrade Frontier's existing telecommunications network by replacing aging copper facilities with fiber-optic infrastructure, providing improved broadband service while utilizing existing public road rights-of-way.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237130
New
Federal
SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANA
Solicitation # W9128F26SM024
The U.S. Army Corps of Engineers Omaha District is conducting market research via Sources Sought Announcement W9128F26SM024 for a potential Progressive Design-Build Other Transaction Agreement under 10 U.S.C. § 2808a. The project involves the construction of a new utility and communications corridor at Malmstrom Air Force Base, Montana, to support the Ground Based Strategic Deterrent Sentinel Program. This effort will replace the existing Hardened Intersite Cable System and includes the installation of approximately 1,750 to 2,225 miles of underground infrastructure, such as microducts, manholes, and handholes with a minimum bury depth of six feet. The scope also encompasses complex civil works for crossings of railways, rivers, and roadways, as well as environmental and cultural support, including Supplemental Environmental Impact Statements and coordination with Tribal Cultural Specialists. The estimated magnitude of the project is between $1.4 billion and $2.0 billion, with incremental funding expected to run from FY29 through approximately FY33, with a target completion around 2035. The government intends to use a Qualifications Based Selection process, focusing on team composition, past relevant experience, and innovative problem-solving rather than price. Interested firms under NAICS 237130 must provide an industry questionnaire and a capability statement not exceeding 12 pages by the response deadline of September 24, 2026. Key requirements include compliance with Davis-Bacon labor laws, OSHA and EM 385-1-1 safety standards, and the provision of payment and performance bonds, all while ensuring the active Minuteman III ICBM system remains operational.
W071 Endist Omaha

POSTED

about 20 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237130
New
SLED
Wood Pole Inspection, Joint Use Inventory & NJUNS Coordination Services
Solicitation # RFP26-27
The City of Winter Park Electric Utility is soliciting proposals for wood pole inspection, condition assessment, joint-use attachment inventory, and NJUNS coordination services for approximately 3,500 utility poles. The primary objective is to enhance system reliability and asset management through the use of non-destructive evaluation techniques, specifically ultrasonic or equivalent technologies, to identify internal decay and structural deterioration. Beyond inspections, the selected contractor will be responsible for providing physical stabilization and bracing for deficient poles, documenting third-party attachments, and managing NJUNS tickets for poles where electric facilities have been removed. The procurement process follows a two-phase evaluation: an initial scoring of proposals based on price, delivery approach, experience, personnel, and professional contacts, followed by oral presentations for shortlisted firms. Compliance requirements are extensive, including adherence to the Build America, Buy America Act, Davis-Bacon Act labor standards, ADA and WCAG 2.0 AA accessibility standards, and Florida's Public Records Law. Proposals must be submitted electronically via the City's procurement portal by October 13, 2026, at 10:00 am. Payment is governed by the Florida Local Government Prompt Payment Act with standard net 30 terms, and the City prefers payment via a VISA platform.
Electric Utility

POSTED

3 days ago

DEADLINE

in 29 days
View Details
NAICS: 237130
New
SLED
Sacramento Last Mile Project Package Three
Solicitation # A07001804
The Sacramento Last Mile Project Package 3, solicitation number A07001804, is a construction project for the City of Sacramento focused on installing a customer-owned outside plant communication system in the Phoenix Park neighborhood. The project aims to achieve 100 percent GPON coverage using a traditional fiber optic system. The scope of work includes the installation of duct banks, underground spaces such as maintenance holes and handholes, OS2 loose tube singlemode fiber optic cabling, splicing, terminations, and fiber distribution enclosures. Additionally, the contractor must install external conduit systems for multi-dwelling units. The project is estimated at 2,300,000 dollars with a construction duration of 80 working days. To be eligible, bidders must hold a current Class A General Engineering Contractor License, as well as either a Class C7 Telecommunications or C10 Electrical Contractor license for infrastructure work, with a Class C7 license specifically required for fiber optic installation and splicing. The contract requires strict adherence to ANSI/TIA and ISO/IEC standards, NFPA 70, and the California MUTCD for safety markings. Key administrative requirements include the submission of certified payroll via LCPtracker, compliance with California prevailing wage rates, and the provision of performance and payment bonds for 100 percent of the contract amount. Bids are due by September 23, 2026, and must include a comprehensive proposal package, including a minimum qualifications questionnaire and various certifications.
City of Sacramento

POSTED

3 days ago

DEADLINE

in 10 days
View Details
NAICS: 237130
New
SLED
Bakersfield College Infrastructure High Voltage Project
Solicitation # 20260910044
The Bakersfield College Infrastructure High Voltage project, issued by the Kern Community College District, involves an electrical service replacement at the Bakersfield College campus in Bakersfield, California. The scope of work includes connecting new primary switchgear provided by the college, establishing a new incoming electrical service from PG&E, and integrating the system into the existing campus electrical distribution. Technical requirements include underground conduit installation via horizontal drilling, the installation of a comprehensive grounding system, and the provision of necessary junction or pull boxes. The contractor must ensure all work conforms to applicable codes and provide a one-year guarantee on workmanship. The contract will be awarded to the lowest qualified responsible proposer. Eligible bidders must possess a C-10 contractor's license and be registered with the Department of Industrial Relations as public works contractors. This is a prevailing wage project requiring compliance with California Labor Code sections 1770-1780. Mandatory requirements for proposal submission include a site visit on September 16, 2026, and a submission deadline of September 28, 2026. Required documentation includes a Non-Collusion Affidavit, Prevailing Wage Compliance Certificate, and Certification of Workmen's Compensation. Financial and administrative terms specify a project value range between 0 and 220,000 dollars. A bid security of 10 percent is required for contracts 45,000 dollars or more, and payment and performance bonds of 100 percent are required for contracts 25,000 dollars or more. Monthly payments are set at 90 percent of the estimated value of work and materials, subject to certification by the Owner's representative. The contractor must commence work within five calendar days of the notice to proceed and complete all tasks within 16 calendar days. Final acceptance is contingent upon the District's approval and evidence that all labor and material claims have been paid.
Kern Community College District

POSTED

3 days ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS