35544380_CWSP – GIRVAN 11029012 PH1.4 Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Pacific Gas and Electric Company (PG&E) is implementing improvements within the Caltrans right of way along State Route 299 in Shasta County at post mile 20.326, near Shasta and Redding. As part of the Undergrounding and Wildfire System Hardening Program, the project involves removing poles and overhead conductors, boring and trenching both inside and outside the pavement, and installing new conductors. Additionally, vegetation management will be performed at two tree points and two brush removal points. To support construction, soil sampling will be conducted using a truck-mounted auger with a width of 2 to 4 inches and a maximum depth of 4 feet. All project activities are scheduled for Monday through Friday between 9:00 a.m. and 3:00 p.m. Traffic control will be managed using Caltrans pre-approved T-Sheets, such as T13, and rolling traffic breaks with CHP assistance will be utilized for overhead conductor work in compliance with the Lane Closure Chart. The project is categorized as exempt under California Environmental Quality Act Section 15304 for Minor Alterations to Land. Administrative oversight is provided by Caltrans District 2 in Redding, with David DeMar serving as the Branch Chief and Peg Bostley as the Principal Program Manager for PG&E.

General Info

PG&E to underground power lines and manage vegetation along State Route 299 with controlled traffic and soil sampling.

Agency

California → Caltrans, District 2 - Redding

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for PG&E SR 299 Wildfire System Hardening Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Peg BostleyPrincipal Program Manager

Full Description

Show more
Pacific Gas and Electric Company (PG&E) proposes various improvements within the California Department of Transportation’s (Caltrans) right of way along State Route 299 in Shasta County at post mile (PM) 20.326 near Shasta and Redding as part of their Undergrounding and Wildfire System Hardening Program. PG&E’s 10K mile wildfire system hardening and undergrounding proposes to enter state highway right of way to remove pole(s), remove overhead conductor, bore in the pavement, bore outside the pavement, install new conductor, trench outside the pavement, and conduct vegetation management work. Vegetation work will include: There are 2 tree points (2 total units) proposed for vegetation work. There are 2 brush removal points (2 units) located inside Caltrans right of way. In support of the construction work on this undergrounding project, soil sampling at multiple locations may occur within the State Right of way. The method for sampling will be a truck-mounted auger with a width of 2”-4” and a maximum depth of 4’. All work will be conducted Monday-Friday between the hours of 9:00 a.m. and 3:00 p.m. Work requiring traffic control will be performed using the Caltrans pre-approved T-Sheets for example T13 when applicable. For overhead conductor removal and installation over the state route, rolling traffic breaks will be utilized with CHP assistance, as approved by the permit inspector and in compliance with the Lane Closure Chart.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS