Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

35519784_CWSP – WILDWOOD 110198896 PH 1.1 Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Caltrans, District 2 - Redding

NAICS

N/A

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

sr36-pg-and-e-110198896-ph1

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Peg BostleyPrincipal Program Manager

Full Description

Show more
Pacific Gas and Electric Company (PG&E) proposes various improvements within the California Department of Transportation’s (Caltrans) right of way along State Route 36 in Shasta County from post mile (PM) 4.9 to 6.75 near Platina as part of their Undergrounding and Wildfire System Hardening Program. These improvements would include the following: Civil scope is comprised of HDD (7,523 LF). Open Trench (4,664 LF). There are approximately 13 subsurface vaults to be installed. One above ground facility identified on the drawings (SCADA Antenna Loc 43). Location 13: Install #5 Pull Box 8' from ETW at Postmile 4.995. Lat/Long: 40.363117, - 122.951143. Location 14: Bore and Trench to install 632' of Conduit and pull approx. 672' of 3-1/OA EPR-CONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. Location 15: Install #5 Pull Box 13' from ETW at Postmile 5.111. Lat/Long: 40.363616, -122.948976. Location 16: Bore to install 704' of Conduit and pull approx. 744' of 3-1/OA EPR-CONCENCAP,25kV (12 (kV) in 1-4" Duct. Location 17: Install #5 Pull Box 10' from ETW at Postmile 5.248. Lat/Long: 40.364421, -122.946671. Location 18: Bore & trench to install 632' of Conduit and pull approx. 672' of 3-1/OA EPRCONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. Location 19: Install #5 Pull Box 9.5' from ETW at Postmile 5.370. Lat/Long: 40.365135, -122.944601. Location 20: Bore & trench to install 746' of Conduit and pull approx. 786' of 3-1/OA EPRCONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. Location 21: Install #5 Pull Box 10.5' from ETW at Postmile 5.512. Lat/Long: 40.365097, -122.941942. Location 22: Bore & trench to install 415' of Conduit and pull approx. 455' of 3-1/OA EPRCONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. Location 23: Install #7 Pull Box 14' from ETW at Postmile 5.591. Lat/Long: 40.365366, -122.940596. Location 26: Bore & trench to install 632' of Conduit and pull approx. 672' of 3-1/OA EPRCONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. Location 27: Install #5 Pull Box 7' from ETW at Postmile 5.696. Lat/Long: 40.365927, - 122.938450. Location 28: Bore & trench to install 772' of Conduit and pull approx. 812' of 3-1/OA EPRCONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. Location 29: Install #5 Pull Box 12.5' from ETW at Postmile 5.845. Lat/Long: 40.366720, -122.936012. Location 30: Bore & trench to install 700' of Conduit and pull approx. 740' of 3-1/OA EPRCONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. Location 31: Install #5 Pull Box 7' from ETW at Postmile 5.971. Lat/Long: 40.367080, - 122.933600. Location 32: Bore & trench to install 545' of Conduit and pull approx. 585' of 3-1/OA EPRCONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. Location 33: Install #5 Pull Box 7' from ETW at Postmile 6.075. Lat/Long: 40.367407, - 122.931844. Location 34: Bore & trench to install 715' of Conduit and pull approx. 755' of 3-1/OA EPRCONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. Location 35: Install #5 Pull Box 66' from ETW at Postmile 6.225. Lat/Long: 40.367448, -122.929377 Location 39: Install #5 Pull Box 75' from ETW at Postmile 6.453. Lat/Long: 40.367415, -122.925114. Location 40: Bore & trench to install 750' of Conduit and pull approx. 790' of 3-1/OA EPRCONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. Location 41: Install #5 Pull Box 5.5' from ETW at Postmile 6.588. Lat/Long: 40.367402, -122.922500. Location 42: Bore & trench to install 560' of Conduit and pull approx. 600' of 3-1/OA EPRCONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. Location 43: Install #5 Pull Box 40' from ETW at Postmile 6.690. Lat/Long: 40.36716, - 122.92044. Install underground service & Scada Pedestal 54' from ETW at postmile 6.699. Install underground service & 32'6" Galvanized Steel Streetlight pole for Scada Antenna 56.5' from ETW at postmile 6.7. Location 44: Bore & trench to install 330' of Conduit and pull approx. 370' of 3-1/OA EPRCONC-ENCAP, 25kV (12 (kV) in 1-4" Duct. There are 57 vegetation points (57 total units) proposed for vegetation work within Caltrans right of way. This includes 36 brush removal points (36 units), 4 tree trim points (4 units), 4 wood removal points (4 units), and 13 tree removal points (13 units) located inside Caltrans right of way. Additionally, outside the right of way, there are 2 points (2 units). These points are located off Caltrans right of way but may need to be accessed from Caltrans right of way to be worked. Total points within and outside Caltrans right of way in the application: 59 points (59 units). Traffic control will be provided while performing the work. The shoulder and/or lane closure will be taken in accordance with Caltrans standard traffic control plan T-13. Subject to change per site condition and pre-construction meetings.