EDPP Surge Tank Control Line Project Phase 2 Additional Work

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The EDPP Surge Tank Control Line Project Phase 2 Additional Work is a forecast project managed by the California Department of Water Resources, San Joaquin Field Division, located in Bakersfield, California. The scope of work involves critical infrastructure maintenance between the Edmonston Pumping Plant and the Edmonston surge tank to ensure continued water delivery to southern California. Key technical requirements include the removal of twenty power poles, the installation of eight new poles, the installation of 1.5 miles of fiber optic cable, and the replacement of 0.25 miles of damaged #4 conductor cable with #2 ACSR conductor. Additionally, three poles will be reframed to support new equipment. Operational logistics emphasize minimal ground disturbance, utilizing a combination of established roads, foot traffic, and helicopter transport for personnel and equipment in inaccessible areas. Specialized equipment for the project includes bucket trucks, digger derricks, air compressors, and a helicopter, with all staging restricted to paved or graveled areas. The project is classified as a ministerial maintenance activity and is exempt from certain environmental reviews under the California Public Resources Code. Elizabeth Maldonado, Senior Environmental Scientist, serves as the primary lead agency contact for the project.

General Info

Upgrade power and fiber infrastructure using helicopters and ground equipment, replace poles and cable, ensure reliable water delivery.

Agency

California Water Resources, Department of

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Bakersfield, CA

Set-Aside

NONE

Documents

(1)

NOE EDPP Surge Tank Control Line Project Phase 2 Additional Work

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Elizabeth MaldonadoSenior Environmental Scientist (Specialist)

Full Description

Show more
San Joaquin Field Division plans to remove twenty power poles, install eight power poles, install 1.5 miles of fiber, and replace .25 miles of conductor cable between the Edmonston Pumping Plant and Edmonston surge tank. Where accessible, a ¾-ton pickup truck, digger derrick, and portable air compressor will be used to excavate holes for new poles. In areas where no existing ground access is available, a helicopter will be used to transport personnel and equipment. New poles will be flown in by helicopter. Once the new poles are installed, workers will climb the poles and move the wires by hand from the old poles to the new poles. Power poles that are slated for removal will be cut below grade level and flown out by helicopter. Fiber installation will involve no ground disturbance. Crews will be flown to each pole to install mounting hardware and travelers. A rope rig will be placed at Pole VV. Fiber installation will start at Pole 001. Crews will pull rope and fiber by hand. SJFD staff will complete all required splices and final connections. Damaged #4 conductor cable from poles LL to VV will be replaced with #2 ACSR conductor. This work will also include the reframing of three poles. Conductor will be pulled directly, eliminating the need for rope. All vehicles and equipment will stay on established roads and within designated areas. All other work areas will be reached by foot or helicopter. The following equipment will be used to complete this work: two ¾-ton pickup trucks, two 55’ AWD bucket trucks, two 47’ AWD digger derricks, two air compressors, one rope rig, one helicopter, a water buffalo, a flatbed truck, and a telehandler or forklift. All equipment staging will occur within graveled or paved areas. This work is necessary to continue to deliver water to southern California.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 11 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237130
New
Federal
SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANA
Solicitation # W9128F26SM024
The U.S. Army Corps of Engineers Omaha District is conducting market research via Sources Sought Announcement W9128F26SM024 for the Sentinel Utility Corridor project at Malmstrom Air Force Base, Montana. This effort supports the Ground Based Strategic Deterrent program by replacing the existing Hardened Intersite Cable System with approximately 1,750 to 2,225 miles of new utility and communications infrastructure. The project scope includes the installation of microducts, manholes, and handholes at a minimum depth of 6 feet, as well as complex crossings of railways, rivers, and roadways. The estimated magnitude of the project is between $1.4 billion and $2.0 billion, with incremental funding expected from FY29 through FY33 and a projected completion around 2035. The government intends to utilize a Progressive Design-Build (PDB) approach under Other Transaction Authority (OTA) per 10 U.S.C. § 2808a, emphasizing commercial agility and shared risk. Selection will be based on a Qualifications Based Selection (QBS) process, focusing on team composition, past relevant experience, and innovative problem-solving abilities rather than price. Interested firms under NAICS 237130 are requested to submit an industry questionnaire and a capability statement of no more than 12 pages by September 24, 2026. Contractors must comply with Davis-Bacon labor laws, OSHA and EM 385-1-1 safety standards, and ensure the active Minuteman III ICBM system remains operational throughout the execution of the work.
W071 Endist Omaha

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 237130
New
SLED
Wood Pole Inspection, Joint Use Inventory & NJUNS Coordination Services
Solicitation # RFP26-27
The City of Winter Park Electric Utility is soliciting proposals for wood pole inspection, condition assessment, joint-use attachment inventory, and NJUNS coordination services for approximately 3,500 utility poles. The primary objective is to enhance system reliability and asset management through the use of non-destructive evaluation techniques, specifically ultrasonic or equivalent technologies, to identify internal decay and structural concerns. Beyond inspections, the selected contractor will be responsible for providing pole stabilization and bracing services, such as installing splints, truss systems, or stub poles, and managing the documentation of third-party attachments and pole retirement activities. The procurement process follows a two-phase evaluation: an initial scoring of proposals based on price, delivery approach, experience, personnel, and professional contacts, followed by oral presentations for shortlisted firms. Compliance requirements are extensive, including adherence to the Build America, Buy America Act, Davis-Bacon Act labor standards, ADA and WCAG 2.0 AA accessibility standards, and Florida's Public Records Law. Proposals must be submitted electronically by October 13, 2026, and must include a detailed work plan, sample reports, and a comprehensive pricing proposal covering per-pole inspection costs and per-ticket NJUNS management fees.
Electric Utility

POSTED

3 days ago

DEADLINE

in 29 days
View Details
NAICS: 237130
New
SLED
Sacramento Last Mile Project Package Three
Solicitation # A07001804
The Sacramento Last Mile Project Package 3, solicitation number A07001804, is a construction project for the City of Sacramento focused on installing a customer-owned outside plant communication system in the Phoenix Park neighborhood. The project aims to achieve 100 percent GPON coverage using a traditional fiber optic system. The scope of work includes the installation of duct banks, underground spaces such as maintenance holes and handholes, OS2 loose tube singlemode fiber optic cabling, splicing, terminations, and fiber distribution enclosures. Additionally, the contractor must install external conduit systems for multi-dwelling units. The project is estimated at 2,300,000 dollars with a construction duration of 80 working days. To be eligible, bidders must hold a current Class A General Engineering Contractor License, as well as either a Class C7 Telecommunications or C10 Electrical Contractor license for infrastructure work, with a Class C7 license specifically required for fiber optic installation and splicing. The contract requires strict adherence to ANSI/TIA and ISO/IEC standards, NFPA 70, and the California MUTCD for safety markings. Key administrative requirements include the submission of certified payroll via LCPtracker, compliance with California prevailing wage rates, and the provision of performance and payment bonds for 100 percent of the contract amount. Bids are due by September 23, 2026, and must include a comprehensive proposal package, including a minimum qualifications questionnaire and various certifications.
City of Sacramento

POSTED

3 days ago

DEADLINE

in 9 days
View Details
NAICS: 237130
New
SLED
Bakersfield College Infrastructure High Voltage Project
Solicitation # 20260910044
The Bakersfield College Infrastructure High Voltage project, issued by the Kern Community College District, involves an electrical service replacement at the Bakersfield College campus in Bakersfield, California. The scope of work includes connecting new primary switchgear provided by the college, establishing a new incoming electrical service from PG&E, and integrating the system into the existing campus electrical distribution. Technical requirements include underground conduit installation via horizontal drilling, the installation of a comprehensive grounding system, and the provision of necessary junction or pull boxes. The contractor must ensure all work conforms to applicable codes and provide a one-year guarantee on workmanship. The contract will be awarded to the lowest qualified responsible proposer. Eligible bidders must possess a C-10 contractor's license and be registered with the Department of Industrial Relations as public works contractors. This is a prevailing wage project requiring compliance with California Labor Code sections 1770-1780. Mandatory requirements for proposal submission include a site visit on September 16, 2026, and a submission deadline of September 28, 2026. Required documentation includes a Non-Collusion Affidavit, Prevailing Wage Compliance Certificate, and Certification of Workmen's Compensation. Financial and administrative terms specify a project value range between 0 and 220,000 dollars. A bid security of 10 percent is required for contracts 45,000 dollars or more, and payment and performance bonds of 100 percent are required for contracts 25,000 dollars or more. Monthly payments are set at 90 percent of the estimated value of work and materials, subject to certification by the Owner's representative. The contractor must commence work within five calendar days of the notice to proceed and complete all tasks within 16 calendar days. Final acceptance is contingent upon the District's approval and evidence that all labor and material claims have been paid.
Kern Community College District

POSTED

3 days ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS