726-6US-1338-Utility Pole Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans has approved an encroachment permit for Southern California Edison to replace an existing 50-foot Class 4 wood distribution pole at postmile 14.997 on the northbound direction of SR-23 in Moorpark, Ventura County, with a new 50-foot Class 1 composite distribution pole in the same location but positioned outside the shoulder. The project includes temporary traffic control measures to ensure safety during construction and will involve excavation with a maximum depth of 72 inches, an average width of 24 inches, and a maximum length of 2 feet. No relocation of public utilities or acquisition of new right-of-way is required for this work. The project is formally registered under the title 726-6US-1338-Utility Pole Replacement Project and is forecasted for posting on July 30, 2026, with Mojgan Abbassi, Senior Environmental Scientist Specialist at Caltrans District 7, listed as the primary point of contact for inquiries.

General Info

Southern California Edison to replace wood pole with composite pole outside SR-23 shoulder in Moorpark, 2026.

Agency

California → Caltrans, District 7 - Los Angeles

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Moorpark, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Mojgan AbbassiSenior Environmental Scientist Specialist

Full Description

Show more
Caltrans approves the encroachment permit for Southern California Edison (SCE) to replace the existing 50-foot Class 4 wood distribution pole (1344568E) in its existing location with a new 50-foot Class 1 composite distribution pole outside the shoulder as well as perform temporary traffic control activities along SR-23 in the northbound (NB) direction at postmile (PM) 14.997, in the City of Moorpark, County of Ventura. Excavation will have a maximum depth of 72 inches, an average width of 24 inches, and a maximum length of 2 feet. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
Central Utility Plant Expansion Bid Package 03a – Site Electrical Infrastructure Extension (Design Build)
Solicitation # 20260729028
This design-build contract addresses the site electrical infrastructure extension for the Central Utility Plant expansion at UC Davis Health in Sacramento, specifically focusing on Bid Package 03a. The project involves extending electrical service from SMUD to support a new 40,000 square foot CUP Annex and 9,000 square feet of renovations to the existing CUP, while establishing a redundant normal power feed via a new SMUD East City feed to ensure system reliability. The electrical infrastructure upgrade is critical to powering the California Tower replacement hospital and other campus-wide utility improvements, requiring seamless coordination with SMUD, the CUPx team, and multiple university stakeholders. The scope includes both HCAI-regulated and non-HCAI components, demanding adherence to diverse regulatory standards and collaboration with multiple Authorities Having Jurisdiction. Multiple design phases and permits are necessary to accommodate the complexity of interfacing with municipal, state, and institutional requirements. The solicitation, numbered 20260729028 and classified under NAICS code 237130, is managed by the University of California Davis Health and is set to close on August 14, 2026. The work is located at 4800 2nd Avenue, Sacramento, with Pierce Salamack identified as the primary point of contact. The project leverages a design-build delivery method to streamline integration between design and construction, enabling efficient execution of the electrical system expansion. No set-aside type is specified, and the state agency is operating under California’s SLED classification. All deliverables must align with the project’s urgency to support broader healthcare infrastructure goals, with design and construction activities tightly synchronized to meet the operational deadlines of the California Tower and related campus expansions.
University of California Davis Health

POSTED

about 15 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237130
New
Federal
Z2DA--519-20-200 VABS Replace Boiler Plant Solicitation 36C25726B0006
Solicitation # 36C25726B0006
The solicitation for the Z2DA--519-20-200 VABS Replace Boiler Plant, identified by number 36C25726B0006, was posted on April 21, 2026, with six amendments issued through July 30, 2026, and a response deadline of August 17, 2026. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under FAR 19.14, with NAICS code 237130, managed by the Department of Veterans Affairs’ Network Contracting Office 17 in San Antonio, Texas, and performance required at Big Spring, Texas. Offerors are solely responsible for monitoring SAM.gov for all amendments, clarifications, and updates; failure to do so will render a proposal non-responsive without recourse. The solicitation operates under a Lowest Price Technically Acceptable (LPTA) evaluation model, with award based strictly on conformance, responsiveness, and lowest price, with no considerations for technical approach, past performance, or management plan. The scope of work involves the installation, commissioning, and testing of boiler plant systems, including steam generation, controls, instrumentation, and safety interlocks, with deliverables requiring manufacturer literature, operating manuals, as-built drawings, test reports, and compliance documentation per ASME, ANSI, NFPA, IPC, and VA-specific standards. Inspection and acceptance occur at the job site, governed by FAR 52.246-12 and other standards including NEC and NFPA 99, with testing requirements such as insulation-resistance checks, thermographic surveys, and functional performance validation. Invoicing must be submitted electronically via VA’s EIPP system through the Tungsten Network; no WAWF or other alternatives are permitted. Contract administration is overseen by COR Horacio Fernandez. Special requirements under the VA Veterans First Contracting Program mandate that no more than 85% of non-material payments be made to non-SDVOSB subcontractors in general construction and 75% in special trade construction, with all SDVOSB subcontractors required to be SBA-certified and a certificate of compliance submitted. Joint ventures are permitted but must comply with 13 CFR §128.402, and VAAR 819.70 supersedes any conflicting SBA rules. Proposals must
257-NETWORK Contract Office 17 (36C257)

POSTED

about 19 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237130
New
SLED
EDPP Surge Tank Control Line Project Phase 2 Additional WorkThe San Joaquin Field Division will execute critical infrastructure upgrades between the Edmonston Pumping Plant and Edmonston surge tank, involving the removal of twenty aging power poles and installation of eight new ones, along with 1.5 miles of fiber optic cable and replacement of 0.25 miles of damaged conductor cable. Access challenges in remote or inaccessible terrain will be addressed using helicopters to transport personnel, equipment, and new poles, while ground-based machinery like pickup trucks, digger derricks, and air compressors will support work in accessible zones. Old poles will be cut below grade and airlifted out, and crews will manually transfer existing wires from old to new poles after climbing them. Fiber installation will proceed without ground disturbance, with rope rigs installed at Pole VV and fiber pulled by hand from Pole 001, with all splices and connections completed on site by SJFD staff. Damaged #4 conductor between poles LL and VV will be replaced with #2 ACSR conductor, accompanied by reframing of three poles, with conductor pulled directly without ropes. All equipment will remain on designated roads and paved or graveled staging areas, with foot and helicopter access used exclusively elsewhere. The operation will utilize two ¾-ton pickup trucks, two 55-foot AWD bucket trucks, two 47-foot AWD digger derricks, two air compressors, one rope rig, a helicopter, a water buffalo, a flatbed truck, and a telehandler or forklift. This work is essential to maintain reliable water delivery infrastructure to southern California.
California Water Resources, Department of

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237130
New
SLED
Arcadian Interstate 5 & 80 & State Route 51 Middle-Mile Broadband Network Project (Encroachment Permit 03-26-6-BB-0818)The California Department of Transportation, District 3, is planning to install middle-mile broadband infrastructure along key highways in Sacramento County, including I-5, I-80, and SR 51, with work spanning multiple specific路段 intervals on each route. The project involves placing conduit and fiber optic cable along these transportation corridors to support expanded broadband connectivity, and it is linked to the previously approved Encroachment Permit 03-25-6-BB-0298. The effort is part of a broader initiative to enhance regional digital infrastructure by leveraging existing state right-of-way to minimize environmental and logistical disruption while expanding high-speed network access. The project is classified as a forecast and is administered under Encroachment Permit 03-26-6-BB-0818, with primary oversight from Dotrik Wilson, Branch Chief at Caltrans, and Tiffanny Hale, Project Manager at Arcadian Infrastructure. Work activities are confined to designated segments within Sacramento County, and all construction will comply with state transportation and utility installation standards. The project timeline is set for 2026, with the official posting date recorded as July 30, 2026, and the point of contact for inquiries is available through the provided agency email and phone details.
Caltrans, District 3 - Marysville/Sacramento

POSTED

1 day ago

DEADLINE

N/A
View Details