This Solicitation opportunity from Nebraska was posted on July 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transmission ROW Clearing

Closed
096-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing major equipment such as liquid-filled step-down transformers, circuit breakers, and switches, as well as the construction of 69kV incoming, switch, metering, and transformer structures. Additional requirements encompass the installation of grounding systems, above-ground conduits, and comprehensive site work including excavation, structural fill, grading, and site restoration. The project must adhere to strict technical standards, including NESC, NEC, IEEE, and ANSI, and requires compliance with Ohio State Prevailing Wage laws and the Americans with Disabilities Act. Bids are due by October 29, 2026, and must be submitted in duplicate. Award selection will be based on a comparison of relative merits and the lowest and best bid. Successful bidders must provide a bid bond of no less than 10%, as well as performance and payment bonds equal to the contract price. The contract also mandates a Drug Free Workplace Compliance Affidavit and requires contractors to assist the owner during the start-up and commissioning of all systems. Performance is subject to a penalty of $500 per calendar day for deliveries exceeding the designated completion date. All equipment must be delivered F.O.B. to the job site in undamaged condition with detailed packing lists.
City of Piqua

POSTED

about 9 hours ago

DEADLINE

in 1 day
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers Chicago District is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified contractors for the CSSC Utility Feed Transformer Replacement project. Located at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois, the project requires the turnkey removal and disposal of two existing utility feed transformers and the installation, testing, and commissioning of two new operational replacements. The new units must have a capacity of 4,000/5,000 kVA, a primary voltage of 13,200 volts, and a secondary voltage of 480Y/277 volts in a three-phase, 60 Hz, Delta-Wye configuration. The contractor will be responsible for all labor, materials, rigging, and supervision, while reusing existing concrete pads, cabling, and switchgear. The anticipated period of performance is 365 calendar days from the Notice to Proceed. This is not a formal request for proposals or quotes, but a capability assessment to determine the availability of small businesses under NAICS code 237130. Key requirements for interested firms include a proven track record with medium-voltage electrical systems, compliance with USACE EM 385-1-1 and NFPA 70E safety standards, and the ability to meet strict procurement lead times. Responses must be submitted by November 5, 2026, and include a technical capability statement, project examples, and documentation of bonding limits. Firms must also specify their ability to satisfy limitations on subcontracting per FAR 52.219-14.
W072 Endist Chicago

POSTED

about 16 hours ago

DEADLINE

in 9 days
NAICS: 237130
New
SLED
2026-28 Electric Infrastructure Reconducts
Solicitation # 2026-28
The City of Covington, Georgia, is soliciting proposals under RFP #2026-28 for the reconduct of three-phase overhead utility lines across three separate projects. The scope of work includes Project 1 at Cornish Creek Newtonsboro Road, Project 2 at Elm and Reynold Streets, and Project 3 involving Eagle and Goldar General locations. The selected contractor will provide all labor, equipment, and coordination for the installation of poles, crossarms, conductors, and hardware, while the City will supply all materials. All work must be completed by May 31, 2027, and must adhere to first-quality workmanship and standard utility practices. Proposals must be submitted in sealed envelopes, including one USB drive copy, to the Covington Utility Complex by 10:00am on November 24, 2026. A mandatory pre-proposal meeting is scheduled for November 9, 2026. Submission requirements include a 5% bid bond, a non-collusion affidavit, and verification of compliance with the Illegal Immigration Reform and Enforcement Act of 2011. The awarded contractor must provide payment and performance bonds for 100% of the contract amount within ten days of notification and maintain comprehensive general liability, automobile liability, and worker's compensation insurance with limits of at least $1,000,000. Evaluation will be based on experience, personnel certifications, project approach, cost reasonableness, safety records, and references.
City of Covington

POSTED

1 day ago

DEADLINE

in 27 days
NAICS: 237130
New
SLED
Solar Streetlight Project – Phase 3
Solicitation # 8385
The Solar Streetlight Project – Phase 3 (C.I.P. No. 8385) is a solicitation by the City of Vista, California, for the receiving, storing, transporting, and installation of 125 solar streetlights. The scope of work includes the installation of galvanized steel and concrete light poles, solar modules, power centers, batteries, and luminaires. Comprehensive tasks involve excavation, concrete placement, pole erection, and the repair of any work-related damage to sidewalks, curbs, and utilities. The contractor is responsible for all labor, materials, and equipment, including hoisting and rental gear, traffic and parking control, public notifications, and the implementation of erosion and stormwater protection measures. All work must adhere to ADA standards for curb ramps and sidewalks and be performed during specified working hours, with lane closures restricted to 8:30 AM to 3:30 PM, Monday through Friday. The contract will be awarded to the lowest responsible bidder based on the total amount of Base Bid Items. To be eligible, bidders must possess the required licensure, provide proof of DIR registration per Section 1725.5 of the California Labor Code, and submit bids electronically via the OpenGov Procurement portal by November 25, 2026. Local business entities, as well as certified veteran-owned or disabled veteran business enterprises, may be eligible for specific preferences. Awarded contractors must provide performance and payment bonds, as well as workers' compensation insurance, within ten working days of the Notice of Intent to Award. Payment is processed via progress payments within 30 calendar days of receipt of a valid invoice, contingent upon the submission of certified payroll records and lien releases. Construction must commence within ten working days of the Notice to Proceed, with punchlist items to be completed within twenty working days of issuance.
City of Vista

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
ON-CALL FIBER OPTIC INSTALLATION, FUSION SPLICING, TERMINATION, TESTING AND RELATED SERVICES
Solicitation # 26-032
The City of Carson is soliciting proposals under RFP #26-032 for qualified telecommunications firms to provide on-call fiber optic installation, fusion splicing, termination, testing, and related services for its municipal fiber optic network. The scope includes working on both new and existing infrastructure, with specific requirements for pulling cable and performing industry-standard testing, including power meter and bi-directional OTDR (1310/1550 nm). The City may award a single or multiple contracts with an anticipated term of five years. Performance standards are strict, requiring emergency onsite arrival within two hours and the start of splice work within four hours, while all test results and documentation must be submitted within two business days of assignment completion. Proposals must be submitted electronically via PlanetBids by November 12, 2026, at 2:00 PM PT. The evaluation process consists of a mandatory written proposal review, followed by optional interviews for high-ranking firms, with the award based on the best overall value in accordance with Carson Municipal Code. Selected contractors must adhere to a minimum local hiring requirement of 30 percent for employees and subcontractors. Financial security requirements include performance and payment bonds totaling 100 percent of the total compensation. Additionally, contractors must provide a detailed safety plan for any trench excavations five feet or deeper on projects exceeding 25,000 dollars and comply with all prevailing wage and insurance requirements.
City of Carson

POSTED

2 days ago

DEADLINE

in 16 days

AI Contract Overview

Show more

Lincoln Electric System is soliciting bids under solicitation number 096-26 for Transmission ROW Clearing in Nebraska. This open bidding process utilizes a two-step unsealing method, with a response deadline of August 18, 2026. The primary scope of work involves vegetation management and right-of-way clearing for transmission, distribution, and generation facilities, categorized under NAICS code 237130. A critical component of this contract is strict adherence to the Avian Protection Plan to ensure compliance with the Migratory Bird Treaty Act, the Bald and Golden Eagle Protection Act, and the Endangered Species Act. Performance is subject to seasonal nesting restrictions, specifically prohibiting tree and shrub clearing from April 1 to August 15 and ground nesting activities from April 1 to July 15. Contractors are required to implement risk assessments, maintain grass heights between 3 and 8 inches to deter nesting, and use flushing bars on equipment. Immediate reporting of any incidental take or the discovery of raptor nests within one mile of a worksite to the LES Environmental Department is mandatory. All field inspections and performance occur at the project sites within Nebraska, with final acceptance tied to regulatory compliance and reporting to the U.S. Fish and Wildlife Service and the Nebraska Game and Parks Commission.

General Info

Lincoln Electric System seeks bids for Nebraska Transmission ROW Clearing, deadline August 18, 2026, via portal only.

Documents

19

096-26 Bid Specifications 115 KV Transmission Line Clearing

DOCX, High priority: read this firstspecifications
High

096-26 Performance Bond Form

PDF, High priority: read this firstperformance-bond
High

096-26 Proposed Construction Schedule

DOCX, High priority: read this firstconstruction-schedule
High

096-26 Standard Services Contract 2025

DOCX, High priority: read this firstcontract-document
High

2022 ENV Guidelines Best Management Practices Manual Vegetation Maintenance

PDF, High priority: read this firstbest-management-practices-manual
High

Bid 096-26 Instructions to Bidders - Transmission Row Clearing

DOCX, High priority: read this firstinstructions-to-bidders
High

Bid 096-26 Schedule of Prices for Transmission Right-of-Way Clearing

XLSX, High priority: read this firstschedule-of-prices
High

Lincoln Electric System Construction Bid Signature Page

DOCX, High priority: read this firstbid-reply-signature-page
High

2022 Avian Protection Plan - Lincoln Electric System

PDF, Low priorityavian-protection-plan
Low

ANSI Z133-2017 Safety Requirements for Arboricultural Operations

PDF, Low prioritystandard
Low

Daily Chemical Report Form 929

PDF, Low priorityreport
Low

L1189D Contract Document

PDF, Low priorityother
Low

L-118A Transmission Tree Planning Circuit Map - St. James Park Construction Project

PDF, Low priorityother
Low

L3858 Street System Map

PDF, Low priorityother
Low

L3870.pdf

PDF, Low priorityother
Low

L6770A.pdf

PDF, Low priorityother
Low

Lincoln Electric System EEO Compliance Form April 2025

PDF, Low priorityeeo-form
Low

L1189C.pdf

PDF

L1569B.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska → Lincoln Electric System
Contacts1 person available
OfficeNE, USA
Office AddressNE, USA
Contacts
All questions must be submitted through this bid portal under the "Clarifications" tabLES Procurement Department

Full Description

Show more
Return to Bid List Bid NUMBER 096-26 TITLE Transmission ROW Clearing PROCESS Two Step Unsealing BASE CURRENCY USD STATUS Open for Bidding CLOSES IN 19 days: 2 hours: 52 minutes: 47 seconds DESCRIPTION BID DOCUMENTS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER 096-26 TITLE Transmission ROW Clearing AVAILABLE DATE 7/30/2026 10:15 AM CLARIFICATION DEADLINE 8/11/2026 4:00 PM DUE DATE 8/18/2026 2:00 PM CONTACT INFORMATION LES Procurement Department; contact@example.gov; All questions must be submitted through this bid portal under the "Clarifications" tab. BID TYPE Formal SHIP TO JOB SITE, Lincoln, Nebraska NE 68521 US DESCRIPTION
Lincoln Electric System is requesting bids to furnish all labor, supervision, equipment, and material to provide clearance of transmission lines per LES Specifications included in this bid solicitation.
Successful bidder will be required to complete (1) the LES Standard Services Contract; 2) furnish proof of insurance with coverage specified in the Contract by an insurance company licensed to do business in Nebraska and rated at least B+ in A.M. Bests Rating. Certificate must show LES listed as additional insured for general liability and include waiver of subrogation; 3) furnish a performance and labor and material payment bond from a surety licensed to do business in Nebraska and also rated at least B+ in A.M. Bests Rating, 4) Return a completed copy of the Equal Employment Opportunity Compliance Request Form.
BID EVENT INFORMATION EVENT TITLE MANDATORY No EVENT DATE/TIME (CST) LOCATION DESCRIPTION

More opportunities from Nebraska → Lincoln Electric System

Same awarding agency

NAICS: 332312
New
SLED
Purchase Tubular Structures
Solicitation # 148-26
Lincoln Electric System is soliciting formal bids for the design, detailing, manufacturing, and delivery of S-26-22 tubular steel pole structures and associated hardware for the 70th and Bluff and 128th and Adams substations. The scope includes one A-Frame deadend structure, two H-Frame deadend structures, and two static wire support structures (42ft and 52ft), along with their respective anchor bolt assemblies. All manufacturers must be AISC certified and provide evidence of certification, basic preliminary drawings, PLS-Pole files, and design calculations at the time of bidding. Technical standards require adherence to ASCE 48 for structural design, AWS D1.1 for welding, and various ASTM standards for materials and galvanizing. The contract will be awarded based on the lowest total bid price, delivery date, and any noted exceptions. Key delivery milestones include anchor bolt assemblies for H-Frames by October 1, 2027, and all other structures and bolts by September 1, 2028. Deliveries are FOB Lincoln, Nebraska, with transportation charges paid by the vendor. Payment terms are Net30, following successful testing by LES. Bidders must submit their proposals through the LES Procurement Portal by November 10, 2026, at 2:00 PM CT, and are required to complete an Equal Employment Opportunity Compliance Request Form upon winning the bid.
Fabricated Structural Metal Manufacturing

POSTED

5 days ago

DEADLINE

in 14 days
View Details
NAICS: 423430
New
SLED
CISCO ACI Software Support Renewal
Solicitation # 147-26
Solicitation 147-26 is a two-step unsealing procurement process issued by the Lincoln Electric System (LES) in Nebraska for the renewal of Cisco ACI software and hardware support services. The primary scope involves providing 12-month support terms from November 12, 2026, to November 11, 2027, with some specific items having a shorter 8-month term ending July 31, 2027. Deliverables include SMARTnet Solution Support 8x5xNBD for various N9K and APIC hardware, software application solution support with upgrades for ACI-AD products, and SmartNet support for C9500 devices. To maintain warranty terms, only authorized new Cisco products from authorized partners or distributors are acceptable. Bids must be submitted electronically via the LES Online Procurement System by November 10, 2026, at 2:00 PM CT, as paper copies will not be accepted. Awardees must comply with the laws of the United States and the State of Nebraska, including fair employment practices and the Foreign Adversary Contracting Prohibition Act (LB 1300), which requires certification that the bidder is not a scrutinized company. Payment will be made in full within thirty days following successful testing and acceptance by LES. All transportation charges are to be paid by the vendor, and the delivery date specified in the bid is considered an essential element of the contract.
Computer and Computer Peripheral Equipment and Software Merchant Wholesalers

POSTED

5 days ago

DEADLINE

in 14 days
View Details
NAICS: 541512
SLED
RFP - IT Asset Discovery & Dependency Mapping Solution
Solicitation # 146-26
Lincoln Electric System (LES) is soliciting proposals for an enterprise IT Asset Discovery and Dependency Mapping Solution to improve the visibility, accuracy, and governance of technology assets across its on-premises, cloud, hybrid, endpoint, network, virtual, and remote environments. The selected vendor will provide subscription-based licensing and implementation services, including software, training, documentation, and technical support. A critical technical requirement is the solution's ability to support automated asset discovery and integrate with the Freshservice Asset Module, which serves as the authoritative system of record. Additionally, the solution must support standards-based Single Sign-On with Microsoft Entra ID. The contract is intended for an initial three-year term with two optional one-year extensions. Proposals are due by November 3, 2026, at 2:00 PM Central Time via the LES Procurement Portal. Evaluation will be based on a scoring process considering mandatory requirements, functional capabilities, staff qualifications, the proposed project plan, and the total cost of ownership. Successful bidders must adhere to strict compliance mandates, including the Foreign Adversary Contracting Prohibition Act (LB 1300) certification, Equal Employment Opportunity compliance, and the execution of a Confidentiality and Security Agreement. Payment for approved itemized invoices will be made within 30 days of receipt.
Computer Systems Design Services

POSTED

13 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS