Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on July 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MIL DEPT - Bradford Armory Fossil Fuel Replacement

Closed
74004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

2 days ago

DEADLINE

in 14 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

2 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

Solicitation 74004, titled MIL DEPT - Bradford Armory Fossil Fuel Replacement, is a construction project issued by the State of Vermont Military Department and the Department of Economic Development. The project is located at the Bradford Armory at 93 Fairground Rd, Bradford, VT, and involves the installation of ground-mounted solar panels, an exterior manufactured battery electric supply system, and the necessary site electrical wiring and switchgear to provide power to the building. Bids are due by September 3, 2026, and must be submitted electronically as a single PDF attachment. A mandatory pre-bid meeting is scheduled for August 11, 2026, with a deadline for questions on August 27, 2026. The contract requires full bonding and Builder's Risk Insurance, and all employees must be paid according to Vermont Prevailing Wage and Fringe Benefit Rate requirements. Award decisions will be based on the best interest of the State, and the evaluation process may include minimum qualification gates, contractor performance evaluations for projects over 100,000 dollars, and potential requests for Best and Final Offers or presentations. Required submission documents include a bid proposal, bidder qualification documents, a signed certificate of compliance, and debarment and non-collusion certifications. Additionally, contractors must disclose any organizational or personal conflicts of interest and comply with Executive Order 02-22 regarding the prohibition of Russian-sourced goods.

General Info

Bid for solar and battery system at Bradford Armory to achieve off-grid power, due September 3, 2026.

Documents

1

Invitation to Bid - Bradford Armory Fossil Fuel Replacement

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA

Full Description

Show more
Contractors are invited to bid on the Bradford Armory Fossil Fuel Replacement project at the Bradford Armory, 93 Fairground Rd. Bradford VT. This project consists of but is not limited to installation of ground-mounted solar panels, an associated exterior manufactured battery electric supply system, and associated site electrical wiring and switchgear required to provide electrical power to the building.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 237110
New
SLED
Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation
Solicitation # 1697-001
The Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation project is a general construction contract issued by the Department of Economic Development for the State of Vermont. The scope of work involves comprehensive improvements to the water system at 339 Carter Street in Barnet, Vermont, including modifications to the water treatment building, component upgrades, SCADA integration, relocation of existing components, underground piping, and associated site work. The project is funded in part through the Vermont Drinking Water State Revolving Fund and is managed by MSK Engineers. Bids must be submitted by December 3, 2026, at 2:00pm local time to the Barnet Town Hall or via the specified mailing address. Awardees are required to provide bid security and both performance and payment bonds totaling 100 percent of the contract price. The contract is subject to several federal mandates, including the Davis-Bacon Act for wage rates, Disadvantaged Business Enterprise requirements, and the Build America, Buy America Act and American Iron and Steel provisions, which mandate that iron, steel, and construction materials be produced in the United States. Additionally, the project adheres to prohibitions on certain telecommunications and video surveillance services or equipment.
Water and Sewer Line and Related Structures Construction

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS