Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

AA METRO PLUMBERS CC

UEI: N92AX91BZ4D9CAGE: SJRC5

AA METRO PLUMBERS CC is a federal contractor, registered under UEI N92AX91BZ4D9 and CAGE code SJRC5. It has been awarded $23,479 in federal contracts. Primary work spans Solar Electric Power Generation. Top awarding agencies include Department Of State.

Contact Information

Registration and classification details

Registration

UEI Code

N92AX91BZ4D9

CAGE Code

SJRC5

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit Organization

NAICS Codes

238220Plumbing, Heating, and Air-Conditioning Contractors(Primary)

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

AA METRO PLUMBERS CC specializes in residential solar water heating system maintenance and service, with demonstrated expertise in the installation, inspection, and repair of solar geysers under federal facility operations. Their core capabilities center on thermal energy system optimization, plumbi...

AA METRO PLUMBERS CC specializes in residential solar water heating system maintenance and service, with demonstrated expertise in the installation, inspection, and repair of solar geysers under federal facility operations. Their core capabilities center on thermal energy system optimization, plumbing integration with photovoltaic-assisted water heating, and compliance with residential energy efficiency standards for government-owned housing. The contractor delivers preventive maintenance, leak detection, thermostat calibration, and collector panel servicing tailored to off-grid and hybrid solar thermal environments, ensuring uninterrupted hot water supply in mission-critical residential installations. Technical proficiency includes working with evacuated tube collectors, antifreeze loop systems, and temperature-pressure relief valves in climate-sensitive installations, with a focus on durability and low-maintenance design in remote or high-usage settings. The contractor has delivered services to the U.S. Department of State, specifically supporting residential energy infrastructure at overseas diplomatic compounds. Their work aligns with diplomatic security and sustainability mandates, emphasizing reliability in austere environments and adherence to international building codes for solar thermal systems. Their primary industry focus is solar electric power generation under NAICS 221114, though their actual work is rooted in solar thermal water heating rather than photovoltaic electricity production. This positions them as a niche provider of integrated solar thermal maintenance services within federal residential facilities, distinguishing them from general plumbing or PV installers. AA METRO PLUMBERS CC operates as a small, locally based entity in Pretoria with no federal certifications on record. Their market presence is narrowly defined by direct service delivery to U.S. government residential assets, with no indication of broader geographic expansion or institutional subcontracting relationships. Their positioning is that of a specialized trades contractor focused on thermal system lifecycle support in federal overseas housing programs.

Key performance metrics

Award counts and award dollars by type, as prime and as subcontractor.

Awards Count

1

All time

Active

0

Currently performing

Completed

1

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award analytics

Awards by agency, industry, year, award type, size, and place of performance.

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with AA METRO PLUMBERS CC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for AA METRO PLUMBERS CC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in AA METRO PLUMBERS CC's top NAICS codes and agencies

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

3 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

8 days ago

DEADLINE

in 2 months
View Details
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean energy systems, including solar, wind, battery storage, and microgrids, on state-owned buildings and real property. This initiative utilizes a third-party financing model where selected vendors finance, own, and maintain the systems with no upfront capital required from state agencies. Projects will be implemented through long-term Site Lease Agreements and Power Purchase Agreements with terms ranging from 20 to 25 years, during which the state will purchase electrical output at a fixed price per kilowatt hour. To qualify for the pool, respondents must submit a Statement of Qualifications by December 23, 2026, and will be evaluated on a pass/fail basis. Requirements include providing a California Secretary of State Certificate of Status, a Veracity Statement, and Darfur Contracting Act Certification. Vendors must demonstrate financial creditworthiness through ratings from agencies such as Standard and Poor's or Moody's and provide evidence of ability to meet commercial general liability and workers compensation insurance requirements. While this RFQ establishes the prequalified pool, specific project awards will be determined through subsequent Requests for Proposals, which will require appropriate California contracting licenses, such as C-10 Electrical or C-46 Solar licenses.
California Department of General Services

POSTED

about 1 month ago

DEADLINE

in about 2 months
View Details
NAICS: 221114
SLED
Operations Yard and Employee Parking Lot PV Solar and Battery Project (JN 225005)
Solicitation # JN 225005
The Operations Yard and Employee Parking Lot PV Solar and Battery Project, identified by JN 225005, is an initiative by the Padre Dam Municipal Water District located in Santee, California. The project involves the design and installation of a photovoltaic solar panel array, a battery storage system, and Level 2 EV charging stations. Solar panels will be mounted on existing canopy roofs or on newly constructed carport structures within the existing employee parking lot. The scope of work also includes minor alterations to existing structures and mechanical equipment, as well as necessary ADA upgrades. All construction and operational activities will take place within existing District property at active operations facilities and previously developed or disturbed areas. The primary objectives of this project are to improve energy efficiency, stabilize long-term energy costs, and reduce the environmental impacts associated with the District's energy consumption. All work must comply with all applicable codes, regulations, and standards. Regarding environmental regulatory compliance, the project has been granted a Notice of Exemption under CEQA Guidelines Sections 15301, 15303, and 15311, as the work constitutes minor alterations and the construction of new small structures without an expansion of use. The project is managed by the Director of Engineering and Planning, Lewis Clapp, and is situated at 9120 Carlton Oaks Drive in San Diego County.
Padre Dam Municipal Water District

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Conditional Use Permit No. PA-2500420
Solicitation # PA-2500420
Conditional Use Permit No. PA-2500420, managed by the San Joaquin County Community Development Department, authorizes the establishment of the North Locust Tree Road Solar Project in Lodi, California. Proposed by RPCA Solar 25, LLC, this utility-scale solar energy system will occupy approximately 18.5 acres of a 20-acre parcel classified as Prime Farmland. The project is designed to generate up to 4 megawatts of alternating current energy, which will be sold to Pacific Gas and Electric Company via an interconnection to their existing electrical distribution system located along the northwest boundary of the site. Construction is expected to take place over a three-year period. To mitigate the impact on agricultural land, the project utilizes driven steel piers for equipment mounting instead of traditional slab foundations, a method intended to prevent soil compaction and allow for the full restoration of agricultural use once the project's operational life concludes. Environmental management strategies include the use of drought-tolerant, pollinator-friendly seed mixes under and between solar rows to maintain soil health, promote stability, and reduce erosion. The project has undergone environmental assessments, including a Mitigated Negative Declaration and an Initial Study, to address impacts on biological resources, air quality, water quality, aesthetics, and greenhouse gas emissions, while ensuring coordination with the San Joaquin Council of Governments regarding habitat conservation and open space plans.
San Joaquin County

POSTED

about 1 month ago

DEADLINE

N/A
View Details