Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

ADVANCE RRP LLC

UEI: JLMCGHHMK5D4CAGE: 6URS8

ADVANCE RRP LLC is a federal contractor, registered under UEI JLMCGHHMK5D4 and CAGE code 6URS8. It has been awarded $4,935,994 across 25 federal contracts. Primary work spans Finish Carpentry Contractors, All Other Specialty Trade Contractors, and Masonry Contractors. Top awarding agencies include Department Of The Interior, Department Of Defense, and Department Of Transportation.

Contact Information

Registration and classification details

Registration

UEI Code

JLMCGHHMK5D4

CAGE Code

6URS8

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

23272XA3A5LJPIQF

NAICS Codes

221310Water Supply and Irrigation Systems
221320Sewage Treatment Facilities
221330Steam and Air-Conditioning Supply
236115New Single-Family Housing Construction (except For-Sale Builders)
236116New Multifamily Housing Construction (except For-Sale Builders)
+37 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

ADVANCE RRP LLC specializes in high-precision specialty trade contracting for federal historic, institutional, and infrastructure assets, with deep expertise in HVAC installation, roofing membrane replacement, masonry repair, historic hardware restoration, and corrosion treatment of critical infrast...

ADVANCE RRP LLC specializes in high-precision specialty trade contracting for federal historic, institutional, and infrastructure assets, with deep expertise in HVAC installation, roofing membrane replacement, masonry repair, historic hardware restoration, and corrosion treatment of critical infrastructure. The contractor delivers full-service construction and rehabilitation solutions, supplying labor, materials, tools, and supervision for complex, mission-critical projects requiring adherence to preservation standards and environmental resilience protocols. Their technical proficiency spans HVAC system diagnostics and upgrades, storm window fabrication and installation, and corrosion mitigation on steel structures—demonstrated through successful execution on National Park Service and IRS facilities. A key differentiator is their ability to integrate historically sensitive materials and methods with modern performance requirements, particularly in preserving architectural integrity while ensuring functional reliability. The company maintains a strong, recurring relationship with the Department of the Interior, delivering specialized work across National Historic Sites and National Recreation Areas—including restoration of historic door hardware, roofing membrane replacement, and trail and parking lot rehabilitation. They also serve the General Services Administration with facility upgrades for federal offices, such as air conditioning installations and system evaluation studies, indicating a trusted role in maintaining federal building performance and compliance. Their industry focus centers on NAICS 238990 (specialty trade contracting), 236220 (commercial and institutional construction), and 238160 (roofing), with additional experience in wood window manufacturing and chemical corrosion treatments. This positions them as a niche provider for federal agencies managing aging infrastructure, historic preservation, and climate-resilient facility upgrades. As a Service-Disabled Veteran-Owned Business headquartered in Pleasantville, New Jersey, ADVANCE RRP LLC operates with a lean, responsive structure optimized for federal contract execution. Their geographic proximity to key East Coast federal assets enhances rapid mobilization and on-site coordination, reinforcing their reputation as a reliable, certified partner for mission-critical government construction and repair work.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of The Interior$4.4M89.7%
Department Of Defense$288.9K5.9%
Department Of Transportation$126.7K2.6%
Small Business Administration$78.8K1.6%
Other agencies (1 agencies, <0.5% each)$13.9K0.3%
Awards by NAICS
238350 - Finish Carpentry Contractors$1.6M32.9%
238990 - All Other Specialty Trade Contractors$693.8K14.1%
238140 - Masonry Contractors$501.3K10.2%
238220 - Plumbing, Heating, and Air-Conditioning Contractors$456.4K9.3%
238210 - Electrical Contractors and Other Wiring Installation Contractors$432.3K8.8%
238160 - Roofing Contractors$420.1K8.5%
236118 - Residential Remodelers$418.0K8.5%
238320 - Painting and Wall Covering Contractors$127.9K2.6%
325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing$126.7K2.6%
- Unknown NAICS$78.8K1.6%
321911 - Wood Window and Door Manufacturing$45.4K0.9%
Others - Other NAICS codes (1 codes, <0.5% each)$10.9K0.2%
Awards by Agency Over Time
Awards by Place of Performance

Compete with ADVANCE RRP LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for ADVANCE RRP LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS

Open opportunities in ADVANCE RRP LLC's top NAICS codes and agencies

NAICS: 238320
New
SLED
Paint All Exterior and Common Area Doors, Buildings 4166, 4167, 4168 & 3673
Solicitation # N400857606105
This solicitation, numbered N400857606105, seeks a contractor to provide all labor, materials, equipment, and supervision for a painting and refinishing project at MCAS Cherry Point, North Carolina. The scope of work involves cleaning, preparing, treating corrosion, priming, and painting approximately 800 exterior and common-area doors, frames, vents, louvers, and grilles across Buildings 4166, 4167, 4168, 4169, and 3673. Additionally, the project includes refinishing approximately 2,350 linear feet of four-tube handrails at Building 3673. All work must result in a durable, professional, and corrosion-resistant coating system. The performance period is 180 calendar days following the award. The contract will be awarded to the lowest-priced offeror, and the government intends to issue a task order under an existing MACC contract without further discussions. Proposals must be submitted via email by 1200 local time on 18 September 2026. Pre-proposal inquiries must be submitted using the provided Master PPI Form by 14 September 2026. Bonding requirements are tiered based on the proposal value: no bonds are required for projects under $35,000, a payment bond is required for amounts between $35,000 and $150,000, and both bid, payment, and performance bonds are required for proposals exceeding $150,000. The project is subject to the Davis-Bacon Act, Buy American provisions, and specific security and wage regulations.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
This solicitation, number 70CMSW25R00000011, is for a firm-fixed-price task order under a MACC multiple-award IDIQ contract to provide design-build services for life, safety, and operational improvements at the Office of Firearms and Tactical Programs (OFTP) at Fort Benning, Georgia. The project has an estimated magnitude between 4.0 million and 4.5 million dollars with a period of performance not to exceed 365 days from the date of award. The scope of work includes multiple facility improvements such as the installation of aluminum awnings, turf replacement at Fiske Range, demolition and site restoration of Building 2294, gutter and drainage improvements at Building 234, commercial HVAC unit replacements at Buildings 2949 and 1836, and general interior refreshes and structural modifications at Building 301. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a technical understanding of the requirements, a sound methodology, and sufficient design resources. Proposals must be submitted in two volumes: a technical and safety volume and a pricing volume using the provided CSI division template. The contract is subject to the Davis-Bacon Act, requiring prevailing wage rates per determination GA20260320, and requires performance and payment bonds. Administrative oversight is managed by Contracting Officer's Representative Joseph Addison, and all payment requests must be processed electronically through the Invoice Processing Platform with accompanying certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
The US Immigration and Customs Enforcement (ICE) is soliciting proposals for a Firm-Fixed-Price task order under an 8(a) MACC IDIQ to replace two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The project involves the removal of old units and the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures for protection against salt air and moisture. The scope includes integrating the generators with the existing fuel and electrical systems, installing two new NEMA 3R automatic transfer switches with rust-resistant enclosures, and securing the units to the existing concrete slab using Grade 5 or higher galvanized anchor bolts. A generator load bank test is required for both new units. The estimated project magnitude is between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The award will be based solely on the lowest total evaluated price. Offerors must submit proposals by September 29, 2026, using a detailed pricing template broken down by CSI division. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and the provision of performance and payment bonds. Personnel must undergo security background checks, sign non-disclosure agreements, and obtain PIV cards for system access. The contractor is responsible for providing a project schedule within 15 days of the Notice to Proceed and must perform work during regular business hours, Monday through Friday, 7:30 am to 4:00 pm. Final acceptance is contingent upon preliminary and final inspections coordinated with the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
This project involves a firm-fixed-price task order under a MACC multiple-award IDIQ contract to upgrade the LED lighting and occupancy sensors at the Buffalo Federal Detention Facility in Batavia, New York. The scope of work includes providing all engineering, labor, supervision, equipment, and materials to replace existing fluorescent fixtures, lamps, and ballasts with energy-efficient LED lighting and occupancy sensors. The contractor is responsible for the removal and proper disposal or recycling of all replaced materials. The estimated magnitude of the project is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. The award will be based solely on the lowest total evaluated price. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. Technical requirements include a minimum two-hour training session for facility maintenance personnel and a commissioning report verifying 100 percent fixture and control operation. The project must comply with the Davis-Bacon Act for prevailing wages and adhere to standards from OSHA, ADA, NFPA, the International Building Code, and the American Correctional Association. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This firm-fixed-price task order, issued under an 8(a) MACC IDIQ, involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms and a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The HVAC objective is to install high-quality, durable, and coastal weather-resistant systems that exceed commercial and industrial standards. The SCADA portion of the project requires replacing current software, installing two chemical feed pumps, and ensuring the system complies with Texas Commission of Environmental Quality (TCEQ) standards. The estimated contract magnitude is between 1.2 million and 1.5 million dollars, with a period of performance of 365 days from the date of award. Award will be based solely on the lowest total evaluated price. Requirements include a one-year contractor warranty for installation and craftsmanship, and both the prime contractor and subcontractors must be manufacturer-certified for all proposed materials. Key personnel requirements specify a Project Manager with at least five years of recent federal contracting experience in building systems repair. The contractor must provide a detailed project schedule following the Notice to Proceed and submit a comprehensive Quality Control Plan. Invoicing is to be processed electronically via the Invoice Processing Platform (IPP) and must be accompanied by certified payroll in accordance with Davis-Bacon wage determinations for Cameron County, Texas.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 15 days
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves the provision and installation of two 40ft steel FLEXTAINER conex offices at the St. Thomas HSI Facility in the US Virgin Islands to provide high-security, environmentally controlled space for forensic science technicians. The scope of work includes the installation of two 42ft by 10ft reinforced concrete slabs, connection to the nearest electrical circuit via PVC conduit, and the equipping of each unit with split-system A/C, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each office must also include four security windows and a 5-pound ABC fire extinguisher. The project is governed by NFPA 70 and International Building Code standards, with a requirement that all materials comply with the Buy America Act. The contract is a Firm-Fixed-Price task order issued under a MACC multiple-award IDIQ, with an estimated magnitude between $250,000 and $300,000. The period of performance is 364 calendar days from the Notice to Proceed, with work conducted during standard business hours from Monday to Friday. Award will be based on the lowest total evaluated price, considering the technical approach, safety and quality control plans, and price. Contractors must adhere to Davis-Bacon prevailing wage rates and meet strict security requirements, including the signing of DHS Non-Disclosure Agreements and the acquisition of ICE-provisioned PIV cards for personnel. Payment requests are to be submitted electronically via the Invoice Processing Platform accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238220
New
SLED
HVAC & Fire Protection System, Pumpwell 4, 704, PSNS
Solicitation # N4425526RB067
This project involves the design and installation of HVAC and fire protection systems for Pumpwell 4 (Building 704), a below-ground facility at the Puget Sound Naval Shipyard in Bremerton, Washington. The scope includes the demolition of the existing HVAC system and the installation of a new system designed to maintain a maximum 55-degree dewpoint and provide critical cooling for electrical equipment and pump motors during drydock dewatering operations. Key performance requirements include a minimum of 12 circulating fans providing 50,000 cfm of airflow, 30,000 cfm of outdoor air, and specific forced airflow for pump motors and electrical equipment to handle ambient temperatures up to 104 degrees. Additionally, the contractor must install a comprehensive fire safety system comprising a fire alarm, sprinkler system, and smoke exhaust, adhering to UFC 3-600-01 and NFPA standards. The contract is a firm-fixed-price task order issued under the NAVFAC Northwest 8(a) MACC, with a 100% set-aside for 8(a) businesses in SBA Region X. The estimated magnitude of construction is between $1 million and $5 million, with a period of performance of 480 days from the date of award. Evaluation is based on price and MACC past performance. Awardees must provide performance and payment bonds within 10 days of award and maintain CMMC Level 1 certification. The project requires strict adherence to hazardous material reports, DOT shipping regulations for waste disposal, and specific labeling standards for piping and electrical conductors.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in about 18 hours
View Details
NAICS: 238210
New
SLED
Replace Switchgears at FRCE, Phase 1
Solicitation # N400857545551
Solicitation N400857545551, titled Replace Switchgears at FRCE, Phase 1, is a request for proposals for electrical infrastructure upgrades at Marine Corps Air Station Cherry Point, North Carolina. The project involves the demolition and disposal of seven existing electrical switchgear stations in Buildings 137 and 138 and the installation of new switchgear. This scope includes reworking existing conduits and conductors, reconnecting six stations to existing unit substation style transformers, and installing one new 480V dry type transformer to replace an existing 15kV switch and transformer. Additionally, a 5-way 15kV SF6 switch in Building 138 Vault 1 will be replaced with a new 6-way SF6 switch. The estimated cost for this work ranges from 1,000,000 to 5,000,000 dollars, with a completion timeline of 720 calendar days after award. The contract is awarded based on the lowest price, with proposals due by 13:00 local time on September 10, 2026. Due to the critical nature of the electrical systems, power outages must be limited to 72 hours and scheduled over three-day holiday weekends. Technical requirements specify the use of factory-engineered switchboards with specific voltage ratings and a short-circuit current rating of 65,000 rms symmetrical amperes, adhering to NEMA PB 2 and UL 891 standards. Safety compliance is mandatory under EM 385-1-1 (2024), and specific restrictions apply to hazardous areas in Building 137. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds. Final acceptance is contingent upon a series of punch-out and pre-final inspections, with the contractor providing a certified QC Manager to oversee the project.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in about 14 hours
View Details
NAICS: 238220
New
CBP5933 Bldg. 225 HVAC Replacement
Solicitation # CBP5933
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to replace six split-system heat pump HVAC systems at the San Diego Job Corps Center in Imperial Beach, California. The project requires the installation of three 2-ton and three 1.5-ton Payne heat pump systems, including matching indoor air handlers, and the disposal of old equipment. The awarded contractor must complete the work within 30 consecutive business days following a written Notice to Proceed. Bids are due by September 11, 2026, and will be evaluated based on the overall best value, considering price, quality, and delivery schedule. The estimated contract value ranges from $25,000 to $100,000. Compliance requirements are stringent, including adherence to the Davis-Bacon Act for prevailing wages, the California Mechanical and Electrical Codes, and U.S. Department of Energy efficiency standards. For bids equal to or greater than $25,000, a bid bond of 20% is required, along with performance and payment bonds from an A-rated surety. Bidders must provide a detailed cost breakout on company letterhead and submit a supplier self-certification packet including an IRS W-9 and business category representation under FAR 52.219-8. Required documentation for final acceptance includes a Notice of Final Completion, certified payroll reports, and two sets of operation and maintenance manuals. Payment is processed via pay applications using AIA G702 and G703 forms, subject to a retainage analysis by the onsite Paying Manager.
San Diego Job Corps Center

POSTED

about 11 hours ago

DEADLINE

in 2 days
View Details
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to provide fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work involves the replacement and installation of 43 smoke detectors across several dormitory rooms, specifically 12 detectors in rooms 11, 15, and 18; 12 detectors in room 19; and 19 detectors in rooms 20 and 21. The contractor is responsible for providing all labor, transportation, and supervision, and must ensure all installed detectors communicate with the fire panel. All work must adhere to applicable NFPA standards and requirements set by the local Authority Having Jurisdiction. This is a fee-for-service contract awarded on a lump sum basis, with MTC serving as the sole judge of the best value bid. Eligible bidders include various small business categories, such as SDB, WOSB, HUBZone, VOSB, and SDVOSB, under NAICS code 238220. Mandatory submission requirements include a bid sheet, proof of insurance, a W-9, and a supplier self-certification form, with a deadline of September 18, 2026, at 3:00 PM PST. The contract requires compliance with Service Contract Labor Standards under Wage Determination 2015-5595 (Revision 28) and adherence to federal regulations regarding information security, the Buy American Act, and the disclosure of debarment status for subcontracts exceeding 30,000 dollars.
Sierra Nevada Job Corps Center

POSTED

about 11 hours ago

DEADLINE

in 9 days
View Details