Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

BIZSOLUTIONS 360 INC.

Subsidiary ofBIZSOLUTIONS 360, INC.UEI: QVU7WHV18CC3CAGE: 4YVQ8

BIZSOLUTIONS 360 INC. is a federal contractor, registered under UEI QVU7WHV18CC3 and CAGE code 4YVQ8. It has been awarded $41,529,388 in federal contracts. Primary work spans Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, and Architectural Services. Top awarding agencies include Department Of State, Agency For International Development, and Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

QVU7WHV18CC3

CAGE Code

4YVQ8

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S CorporationBlack American OwnedMinority-Owned BusinessSelf Certified Small Disadvantaged BusinessDOT Certified DBE

NAICS Codes

221114Solar Electric Power Generation
221310Water Supply and Irrigation Systems
236118Residential Remodelers
236220Commercial and Institutional Building Construction
237110Water and Sewer Line and Related Structures Construction
+51 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

BIZSOLUTIONS 360 INC. specializes in construction management and engineering services for federal infrastructure projects, with deep expertise in oversight, technical coordination, and project delivery for public works under the Department of the Interior and Department of Defense. The contractor pr...

BIZSOLUTIONS 360 INC. specializes in construction management and engineering services for federal infrastructure projects, with deep expertise in oversight, technical coordination, and project delivery for public works under the Department of the Interior and Department of Defense. The contractor provides construction management representative (CMR) services, including site supervision, contract administration, quality assurance, and compliance monitoring for rehabilitation, replacement, and maintenance of critical facilities such as wastewater systems, housing units, boardwalks, and trails in national parks and military installations. Their technical focus includes construction documentation review, change order management, safety protocol enforcement, and coordination with civil, structural, and environmental disciplines to ensure adherence to federal construction standards and sustainability requirements. The company maintains a strong, recurring relationship with the Department of the Interior, delivering construction management support for heritage preservation and natural resource infrastructure projects across national parks and protected areas. They also serve the Department of Defense with engineering and training services, including specialized professional development programs for military personnel. Additional engagements with the General Services Administration involve radon mitigation and facility modernization efforts, demonstrating adaptability across federal building lifecycle phases. Primarily operating under NAICS 541330 (Engineering Services), BIZSOLUTIONS 360 INC. positions itself as a niche provider of on-site construction oversight and technical advisory services rather than design or architectural work. Their market focus is on federal land management and defense infrastructure, where precision in regulatory compliance and field-level execution is paramount. The firm is based in Washington, DC, and operates as a small business under the 2L entity structure, with no federal certifications on record. Their geographic presence is centered on federal project sites nationwide, with operational agility driven by proximity to federal decision-makers in the capital region.

Key Performance Metrics

Awards Count

54

All time

Active

8

Currently performing

Completed

46

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by Agency Over Time
Awards by Place of Performance

Compete with BIZSOLUTIONS 360 INC.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for BIZSOLUTIONS 360 INC.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in BIZSOLUTIONS 360 INC.'s top NAICS codes and agencies

NAICS: 541330
New
SLED
QBS/PS/DOT/2610-1270098 PATH Lakewood
Solicitation # PE-66062-NONST-2027-000000503
The City of Atlanta, in partnership with the PATH Foundation, is soliciting a qualified consultant for the design of a paved shared use path connecting the Southside Beltline Trail to the Southtowne Trail at South Bend Park. The project is structured in two phases, with the current focus on Phase I, which extends from the Southside Trail to Pryor Road at Meldon Avenue. The selected consultant will be responsible for reviewing and validating the 2021 concept report, preparing preliminary and final design plans, and developing the necessary NEPA documentation. The scope also includes extensive stakeholder engagement, including a Public Information Open House and multiple stakeholder meetings, to ensure the design accounts for public feedback and the needs of users with disabilities. This is a master contract delivered via task orders with a base period of three years and a one-year renewal option. The project timeline begins with a Notice to Proceed in Q3 2026, with final construction plans expected to be ready for bidding by Q1 2030. All design work must comply with GDOT Engineering Design Guide and Project Planning Guide standards, as well as the GDOT Plan Development Process and FHWA Grant Agreements. Evaluation of consultants will be based on their experience designing off-system paved trails in Atlanta and Georgia, their ability to manage budgets, their collaboration with the PATH foundation, and their capacity to produce high-quality technical plans. Key personnel required for the project include a Project Manager and leads for Roadway Design, Environmental/NEPA, and Stakeholder Engagement.
City of Atlanta

POSTED

about 3 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project scope includes site preparation, stormwater mitigation via an infiltration pond, the purchase and erection of the steel building, installation of a concrete slab, underground utilities, a dry pipe fire suppression system, and the installation of desiccant dehumidifying equipment. Additionally, the facility must include a solar-ready roof zone and comply with UFC, NFPA, and IBC standards. The estimated project magnitude is between 1 million and 5 million dollars, with a statutory cost limit of 5 million dollars. This Firm Fixed Price task order will be awarded based on a balanced evaluation of technical capability and price. The successful contractor must commence work within 10 calendar days of the notice to proceed and achieve full completion within 365 calendar days. Key contractual requirements include the provision of performance and payment bonds for awards exceeding 150,000 dollars, adherence to Davis-Bacon prevailing wage rates for Pierce County, and compliance with the Buy American Act for fire alarm components. Liquidated damages are established at 576.63 dollars for the first day and 427.99 dollars per day thereafter. All invoicing must be processed through the Wide Area Workflow system.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details
NAICS: 541330
New
SLED
TxDOT Aviation Division- Notice to Consultants
Solicitation # RFQ26ALCMRCE00015
The Texas Department of Transportation Aviation Division is soliciting qualifications from professional firms to develop an Airport Layout Plan (ALP) with Narrative for the Commerce Municipal Airport. The scope of work is divided into three primary phases: a kick-off phase focused on strategic planning and public outreach, Phase I covering aviation demand forecasts and planning standards, Phase II addressing land use alternatives and facility requirements, and Phase III involving the final development plan, Capital Improvement Plan (CIP), and an 18B Obstruction Survey. All work must comply with the latest FAA Master Plan Advisory Circular and specific TxDOT Standard Operating Procedures. Interested firms must submit a Qualifications Statement of no more than nine pages via the TxDOT Aviation eGrants system by November 10, 2026, at 2:00 PM CST. Selection will be based on a 100-point scale evaluating capability and qualifications, recent experience with comparable airport plans, performance reliability, and the proposed technical approach and schedule. Mandatory submission requirements include a written certification regarding the National Defense Authorization Act and the Department of Commerce's foreign adversaries list. The selected firm will subsequently enter a fee proposal and negotiation phase to establish the final contract value.
Texas Department of Transportation

POSTED

about 3 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project focuses on construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional system. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete structures, concrete pipes, and welding. Additional requirements include traffic control, construction surveying, electrical work, and SWPPP implementation. Norstar Plumbing and Engineering, Inc. is managing the subcontractor solicitation for this project, specifically seeking certified DBE, MBE, SBE, and WBE subcontractors and suppliers. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this effort are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves comprehensive infrastructure work for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. Key station improvements consist of installing a new wet well, valve vault, and associated appurtenances, alongside the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and a complete operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The estimated project value is 16,690,000 dollars. This is a small business set-aside solicitation with bids due by November 10, 2026, though some documents indicate a deadline of November 12, 2026. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on price, financial ability, and qualifications. Bidders must provide a Good Faith Efforts Form and Table A regarding MWBE participation to be considered responsive. The agreement is a stipulated price contract governed by EJCDC standard conditions. Required deliverables include performance and payment bonds, proof of insurance with an A.M. Best rating of A-VII or better, and adherence to strict material packaging and quality standards, including AWS, NEMA, and SMACNA specifications. Payment is processed monthly via applications for payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies, along with the abandonment of existing water mains on Walnut Street, Ebony Lane, and 247th Place. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for these quotations is October 19, 2026, at 1:00 PM. Eligible subcontractors must possess a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. The solicitation specifically encourages participation from DBE, MBE, WBE, and SBE firms, offering flexibility in task breakdown and potential assistance in obtaining bonds, insurance, or equipment. Awarded subcontractors will be required to execute a standard subcontract agreement and meet general insurance requirements, with the prime contractor reserving the right to require payment and performance bonds totaling 100 percent of the subcontractor's bid, with premiums reimbursed up to 1.5 percent.
W.A. Rasic Construction Company

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details