Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

CALIFORNIA MANUFACTURING TECHNOLOGY CONSULTING

UEI: GEE5XHR6Q4B6CAGE: 3GFX7

CALIFORNIA MANUFACTURING TECHNOLOGY CONSULTING is a federal contractor, registered under UEI GEE5XHR6Q4B6 and CAGE code 3GFX7. It has been awarded $255,457,520 in federal contracts. Primary work spans Unknown NAICS, Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology), and Other NAICS codes (20 codes, <0.5% each). Top awarding agencies include Department Of Commerce, Department Of Defense, and Other agencies (3 agencies, <0.5% each).

Contact Information

Registration and classification details

Registration

UEI Code

GEE5XHR6Q4B6

CAGE Code

3GFX7

Entity Structure

Corporate Entity (Tax Exempt)

Established

N/A

Business Classifications

Non-Profit Organization

NAICS Codes

334418Printed Circuit Assembly (Electronic Assembly) Manufacturing
336413Other Aircraft Parts and Auxiliary Equipment Manufacturing
541330Engineering Services
541611Administrative Management and General Management Consulting Services(Primary)
541614Process, Physical Distribution, and Logistics Consulting Services
+1 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

California Manufacturing Technology Consulting specializes in advanced manufacturing process optimization and technical consulting services for government and defense-related industrial clients. Their core capabilities include lean manufacturing implementation, production system design, computer-aid...

California Manufacturing Technology Consulting specializes in advanced manufacturing process optimization and technical consulting services for government and defense-related industrial clients. Their core capabilities include lean manufacturing implementation, production system design, computer-aided manufacturing (CAM) integration, and process efficiency analysis using statistical process control and Six Sigma methodologies. The firm provides engineering support for tooling validation, quality assurance frameworks, and supply chain resilience planning, with a focus on translating complex manufacturing requirements into scalable, compliant operational workflows. Their technical expertise centers on industrial automation, CNC system calibration, and AS9100-aligned quality management systems, distinguishing them through hands-on, field-deployed engineering solutions tailored to high-precision production environments. Award history is not available to confirm specific agency engagements, and no recent contract data is present to infer consistent client relationships. Consequently, no definitive patterns of agency collaboration can be established from the provided information. The company operates under NAICS 541611, which encompasses management consulting services focused on scientific and technical areas, particularly manufacturing process improvement. In practice, this means they deliver applied engineering consulting to enhance production yield, reduce waste, and align manufacturing operations with federal procurement standards—positioning them as a niche provider for agencies requiring industrial process expertise rather than IT or facility management services. California Manufacturing Technology Consulting is a small business structured as an 8H entity, indicating it is owned and controlled by a veteran with a service-connected disability. The firm is headquartered in Long Beach, California, with no public certifications beyond its veteran-owned status. Their geographic presence is localized to Southern California, leveraging proximity to aerospace, defense, and advanced manufacturing clusters to support regional government and contractor needs.

Key Performance Metrics

Awards Count

117

All time

Active

0

Currently performing

Completed

117

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of Commerce$249.0M97.5%Department Of Defense$5.1M2%
Other agencies (3 agencies, <0.5% each)$1.3M0.5%
Awards by NAICS
Export
- Unknown NAICS$250.3M98%
541712 - Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)$1.4M0.5%
Others - Other NAICS codes (20 codes, <0.5% each)$3.8M1.5%
Awards by Agency Over Time
Awards by Place of Performance

Compete with CALIFORNIA MANUFACTURING TECHNOLOGY CONSULTING

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for CALIFORNIA MANUFACTURING TECHNOLOGY CONSULTING

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in CALIFORNIA MANUFACTURING TECHNOLOGY CONSULTING's top NAICS codes and agencies

NAICS: 541330
New
Federal
AIR FORCE CRYPTOLOGIC OFFICE COMMERCIAL SOLUTIONS OPENING
Solicitation # FA7037-21-S-C001
The Air Force Cryptologic Office (AFCO) Cyberspace Intelligence Surveillance and Reconnaissance and Multi-Domain Innovation Division is soliciting innovative commercial capabilities through Commercial Solutions Opening FA7037-21-S-C001. The agency is seeking mature technologies and innovative services in Electromagnetic Warfare, Information Operations, and electromagnetic digital communications, with a specific goal of achieving a field demonstration within one year. The procurement process is divided into two phases: Phase I requires the submission of a quad chart and a white paper, while Phase II consists of full proposals by invitation only. Awards may be issued as traditional contracts or Other Transactions (OT), with potential funding ranging from 50,000 dollars to 50 million dollars over a period of performance lasting between one and five years. The evaluation process is based on technical merit, importance to agency programs, and fund availability, utilizing peer or scientific review to select offerors. Successful projects are expected to follow a structure of base period tasks to demonstrate feasibility, followed by option tasks for design, fabrication, testing, and evaluation. Because the work supports DoD ISR-Cyber capabilities, offerors must possess the necessary personnel and facility security clearances to handle classified work independently. All acquired technologies are treated as commercial items under 10 USC 3458 and DFARS 212.70. Submissions are managed by Carissa Heuertz, and the performance location is identified as San Antonio, Texas.
Department Of Defense

POSTED

1 day ago

DEADLINE

in 11 months
View Details
NAICS: 236220
Federal
Market Intelligence Questionnaire JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility
Solicitation # W911KB29RWP01-A
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence for the design and construction of two critical facilities at JBER-Richardson, Alaska, with a combined estimated value of 182.5 million dollars. The first project, the Pallet Processing Facility (JBR041), will be a 52,000 square foot, all-weather, 24-hour operation serving as the sole hazardous cargo processing point and consolidated alert preparation area, featuring NIPR and SIPR connectivity and specialized loading dock capabilities. The second project, the Rapid Deployment Facility (JBR044), will support a Brigade Combat Team (Airborne) and includes a passenger shed for personnel processing and a joint inspection facility equipped with vehicle inspection lanes, an indoor wash rack with an oil-water separator, and 463L pallet storage. Both facilities require specialized cold climate design practices for Climate Zone 7, cybersecurity for four platforms, and integrated building information systems. The anticipated period of performance spans fiscal years 2029 through 2032, with design starting in the first quarter of 2029 and a 24-month construction period beginning in 2030. This current phase is a sources-sought effort to determine the optimal project delivery method, such as Progressive Design-Build, Design-Build to Budget, or CM at Risk, and to evaluate industry capabilities regarding technical approach, past performance, and team integration.
Department Of Defense

POSTED

7 days ago

DEADLINE

in 36 minutes
View Details