Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

EROSION CONTROL SERVICES LLC

UEI: H1E7YPELNRQ5

EROSION CONTROL SERVICES LLC is a federal contractor, registered under UEI H1E7YPELNRQ5. It has been awarded $5,558,511 in federal contracts. Primary work spans Support Activities for Forestry, Hay Farming, and Soil Preparation, Planting, and Cultivating. Top awarding agencies include Department Of Agriculture and Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

H1E7YPELNRQ5

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

73

All time

Active

0

Currently performing

Completed

73

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with EROSION CONTROL SERVICES LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for EROSION CONTROL SERVICES LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in EROSION CONTROL SERVICES LLC's top NAICS codes and agencies

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 4 days
View Details
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forest Development, is soliciting bids for pre-commercial thinning services across two units in the McAllister Creek logging area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, specifically Unit 313-040 (10.33 acres) and Unit 313-035 (13.44 acres). The scope of work requires the contractor to identify and maintain desirable crop trees by removing competing trees and shrubs, including brush and hardwoods within a four-foot radius of leave trees. Performance standards include strict stump height limits of less than five inches, a maximum slash height of 24 inches, and specific bucking requirements for Ponderosa pine cut between January 1st and July 31st. Bids must be submitted in a sealed envelope labeled McAllister Creek PCT 2027 by 4:00pm on November 17, 2026. A complete bid package must include a bid sheet, bid evaluation form, contractor's work plan, TERO compliance and utilization form, and a certification regarding debarment, suspension, and responsibility. Payment is based on a bid price per acre for accepted acreage, with 20 percent of each payment held back until final acceptance. Contractors must provide proof of liability insurance and adhere to TERO Title X compliance and TOSHA safety regulations. The project is aligned with the FY2026 period from October 1, 2026, to September 30, 2027, and maintains an Indian preference policy for all products and supplies.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 19 days
View Details