Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

NXKEM PRODUCTS LLC

UEI: KLHMFQTCCK97

NXKEM PRODUCTS LLC is a federal contractor, registered under UEI KLHMFQTCCK97. It has been awarded $75,074 in federal contracts. Primary work spans Paint and Coating Manufacturing and Unknown NAICS. Top awarding agencies include Department Of Defense and Department Of Veterans Affairs.

Contact Information

Registration and classification details

Registration

UEI Code

KLHMFQTCCK97

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

29

All time

Active

0

Currently performing

Completed

29

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with NXKEM PRODUCTS LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for NXKEM PRODUCTS LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in NXKEM PRODUCTS LLC's top NAICS codes and agencies

NAICS: 236220
New
Federal
Market Intelligence Questionnaire JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility
Solicitation # W911KB29RWP01-A
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence for two military construction projects at JBER-Richardson, Alaska, with a combined estimated target budget of approximately 182.5 million dollars. The first project, the Pallet Processing Facility (JBR041), has a target budget of 79.5 million dollars to create a 52,000 square foot, all-weather, 24-hour facility that will serve as the sole hazardous cargo processing point and consolidated alert final preparation and holding area at JBER. The second project, the Rapid Deployment Facility (JBR044), has a target budget of 103 million dollars and consists of a complex to support pre-deployment and redeployment for a Brigade Combat Team (Airborne), featuring a Passenger Shed for personnel processing and a Joint Inspection Facility equipped with vehicle inspection lanes, an indoor wash rack, and a covered defuel point. Both facilities require specialized cold climate design for Climate Zone 7, cybersecurity for four platforms, sustainability measures, and comprehensive site improvements including utilities and storm drainage. The anticipated period of performance spans fiscal years 2029 through 2032, with design starting in the first quarter of FY29 and a 24-month construction period beginning in FY30. This current action is a sources-sought effort to gather industry feedback on the most effective project delivery methods, such as CM@Risk or Design-Build, and to evaluate industry capabilities regarding arctic adaptation and schedule risks.
Department Of Defense

POSTED

2 days ago

DEADLINE

in 6 days
View Details
NAICS: 325510
New
Federal
Aircraft Coatings and Sealants OO-ALC
Solicitation # FA822427R0002
The Ogden Air Logistics Complex at Hill Air Force Base, Utah, is soliciting proposals for a total small business set-aside contract to provide comprehensive management, supply, and technical support for aircraft coatings and sealants. This Firm Fixed Price Indefinite Delivery Indefinite Quantity contract is designed to ensure uninterrupted maintenance operations for C-130, F-16, and A-10 aircraft. The total anticipated period of performance is six years and two months, consisting of an eight-month ramp-up period, a five-year ordering period, and a six-month window for final deliveries. The government will utilize a Best Value Source Selection Tradeoff methodology, where the technical factor is significantly more important than price. The selected contractor will be responsible for sourcing, storing, and delivering materials, including specialized Premixed Frozen Materials requiring transit at -80F and ITAR-compliant storage for FMS-3600 coatings. Key performance requirements include a strict four-hour delivery timeline for urgent orders and ensuring all products maintain at least 85% of their shelf life upon delivery. Additionally, the contractor must provide a secure web-based ordering system, rapid technical assistance for material failures, and monthly on-site support. Compliance requirements include CMMC Level 2 self-certification, adherence to MIL-STD-129 marking standards, and the use of the Wide Area WorkFlow system for invoicing.
FA8224 Afsc Ol H Pzim

POSTED

2 days ago

DEADLINE

in 10 days
View Details