Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

TIC EXPRESS

UEI: LDD4WN744LR3

TIC EXPRESS is a federal contractor, registered under UEI LDD4WN744LR3. It has been awarded $26,225 in federal contracts. Primary work spans Photographic Film, Paper, Plate, Chemical, and Copy Toner Manufacturing. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

LDD4WN744LR3

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

1

All time

Active

0

Currently performing

Completed

1

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with TIC EXPRESS

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for TIC EXPRESS

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in TIC EXPRESS's top NAICS codes and agencies

NAICS: 541330
New
Federal
AIR FORCE CRYPTOLOGIC OFFICE COMMERCIAL SOLUTIONS OPENING
Solicitation # FA7037-21-S-C001
The Air Force Cryptologic Office (AFCO) Cyberspace Intelligence Surveillance and Reconnaissance and Multi-Domain Innovation Division is soliciting innovative commercial capabilities through Commercial Solutions Opening FA7037-21-S-C001. The agency is seeking mature technologies and innovative services in Electromagnetic Warfare, Information Operations, and electromagnetic digital communications, with a specific goal of achieving a field demonstration within one year. The procurement process is divided into two phases: Phase I requires the submission of a quad chart and a white paper, while Phase II consists of full proposals by invitation only. Awards may be issued as traditional contracts or Other Transactions (OT), with potential funding ranging from 50,000 dollars to 50 million dollars over a period of performance lasting between one and five years. The evaluation process is based on technical merit, importance to agency programs, and fund availability, utilizing peer or scientific review to select offerors. Successful projects are expected to follow a structure of base period tasks to demonstrate feasibility, followed by option tasks for design, fabrication, testing, and evaluation. Because the work supports DoD ISR-Cyber capabilities, offerors must possess the necessary personnel and facility security clearances to handle classified work independently. All acquired technologies are treated as commercial items under 10 USC 3458 and DFARS 212.70. Submissions are managed by Carissa Heuertz, and the performance location is identified as San Antonio, Texas.
Department Of Defense

POSTED

1 day ago

DEADLINE

in 11 months
View Details
NAICS: 325992
New
DIBBS
FILTER ELEMENT, FLUID
Solicitation # SPE7M5-27-T-1340
Solicitation SPE7M5-27-T-1340 is a fixed-price request for the procurement of 118 fluid filter elements, identified by NSN 5999-01-248-3179 and part number WC-00419F-161B from Pall Aeropower Corporation. This is a total small business set-aside under NAICS code 325992, managed by the DLA Weapons Support Active Devices Division. The item is designated as a critical application and restricted source item, meaning it requires engineering source approval by the Government design control activity. Delivery is required within 128 days, with a need ship date of March 11, 2027, and a final required delivery date of May 16, 2027, to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073-1E, MIL-STD-129 for marking, and ASTM-D-3951-95. It incorporates specific DLA technical requirements RA001, RP001, and RC001, and requires the removal of government identification from non-accepted supplies per RQ011. Compliance with the Buy American and Balance of Payments Program is required for quotes above the micro-purchase threshold. Additionally, the contractor must meet cybersecurity standards, including CMMC Level 2 self-assessment and safeguarding of covered defense information. Inspection and acceptance will occur at the destination, and all invoicing must be processed electronically through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT ACTIVE DEVICES DIVISION

POSTED

7 days ago

DEADLINE

in 4 days
View Details
NAICS: 236220
Federal
Market Intelligence Questionnaire JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility
Solicitation # W911KB29RWP01-A
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence for the design and construction of two critical facilities at JBER-Richardson, Alaska, with a combined estimated value of 182.5 million dollars. The first project, the Pallet Processing Facility (JBR041), will be a 52,000 square foot, all-weather, 24-hour operation serving as the sole hazardous cargo processing point and consolidated alert preparation area, featuring NIPR and SIPR connectivity and specialized loading dock capabilities. The second project, the Rapid Deployment Facility (JBR044), will support a Brigade Combat Team (Airborne) and includes a passenger shed for personnel processing and a joint inspection facility equipped with vehicle inspection lanes, an indoor wash rack with an oil-water separator, and 463L pallet storage. Both facilities require specialized cold climate design practices for Climate Zone 7, cybersecurity for four platforms, and integrated building information systems. The anticipated period of performance spans fiscal years 2029 through 2032, with design starting in the first quarter of 2029 and a 24-month construction period beginning in 2030. This current phase is a sources-sought effort to determine the optimal project delivery method, such as Progressive Design-Build, Design-Build to Budget, or CM at Risk, and to evaluate industry capabilities regarding technical approach, past performance, and team integration.
Department Of Defense

POSTED

7 days ago

DEADLINE

in about 8 hours
View Details