Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

WALCO OF ROBBINSVILLE, NC

UEI: L13NHJTSBNH6

WALCO OF ROBBINSVILLE, NC is a federal contractor, registered under UEI L13NHJTSBNH6. It has been awarded $231,287 in federal contracts. Primary work spans Unknown NAICS, Land Subdivision, and Highway, Street, and Bridge Construction. Top awarding agencies include Department Of Agriculture.

Contact Information

Registration and classification details

Registration

UEI Code

L13NHJTSBNH6

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

4

All time

Active

0

Currently performing

Completed

4

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with WALCO OF ROBBINSVILLE, NC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for WALCO OF ROBBINSVILLE, NC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in WALCO OF ROBBINSVILLE, NC's top NAICS codes and agencies

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation, operating the Joliet Job Corps Center for the U.S. Department of Labor, is seeking bids for a fixed-price, single lump sum subcontract for road and parking lot repairs in Illinois. The project scope includes the full-depth removal and replacement of approximately 62,500 square feet of asphalt across five specific areas, including the Guard Shack, Dorm Parking Lot, West Side of Dorms, Kitchen/BCT, and Dumpster/Maintenance areas. Additionally, the contractor must repair five storm sewer drain structures and patch five potholes. The estimated contract value ranges from $100,000 to $250,000, with a required performance period of 90 consecutive business days following the written Notice to Proceed. Bids are due by October 21, 2026, and will be awarded based on overall best value. To be considered, bidders must conduct a physical site visit, submit a signed MTC Bid for Lump Sum Contract form, and provide a detailed cost breakout on company letterhead. Because the project exceeds $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone. Compliance requirements include adherence to Construction Wage Rate Requirements (CWRR) and the provided Wage Determination, as well as the submission of an SF 1413 form. Contractors must also provide a completed MTC Supplier Packet, including a W-9 and self-certification. Payment is based on intervals or percentage of completion using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance requires a written notification, a final inspection, and the submission of closeout documentation, including a Notice of Final Completion and a Certificate of Release of Liens.
Joliet Job Corps

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
SLED
2027024
Solicitation # 2027024
Solicitation RFP 2027024 is a unit price bid issued by the Spartanburg County Government for the Davis Road Culvert Replacement Project. The scope of work involves civil site improvements, including surface preparation, the application of tack, and the installation of hot mix asphalt paving. Key technical requirements include the execution of driveway tie-ins for smooth transitions, the maintenance of legible grade and centerline stakes, and adherence to a strict hierarchy of standards led by the project's special provisions, followed by Spartanburg County, SCDOT, MUTCD, and SCDHEC regulations. The contractor is required to submit weekly two-week look-ahead schedules and provide daily delivery tickets for all scaled materials. Administratively, the contract is governed by South Carolina state law and requires the contractor to maintain specific insurance coverages, including a minimum of 1 million dollars in general liability and statutory worker's compensation, with Spartanburg County named as an additional insured. Payment is based on unit bid prices submitted via monthly AIA pay applications, with undisputed amounts due upon receipt and considered past due after 30 days. The project requires a mandatory pre-construction conference and strict adherence to weather restrictions for paving. Final completion is achieved only after all pay items and punch list items are approved in writing by the County.
Spartanburg County Government

POSTED

about 15 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237310
New
SLED
Babcock Ranch Preserve Road Work - Agency Decision
Solicitation # FWC 26/27-30
The Florida Fish and Wildlife Conservation Commission awarded solicitation FWC 26/27-30 to Grippo Pavement Maintenance Inc. for road work at the Babcock Ranch Preserve. The contract involves the supply, delivery, spreading, and grading of 5,280 tons of DOT certified shell road base material, specifically Code B02 Bank Run Shell Base. The total awarded price is 112,358.40 dollars, which falls under the agency's estimated budget of 163,700.00 dollars. The project is governed by a one-year contract term with deliveries scheduled between 8:00 AM and 4:00 PM, Monday through Friday, excluding legal holidays and excessive rain events. The award was based on the lowest total price from a responsive and responsible bidder. Key requirements for the contractor include providing a performance bond, insurance documentation, and Florida Department of Transportation Material Certification. The contract incorporates various regulatory standards, including the Davis-Bacon Act, the Build America, Buy America provision of the Infrastructure Investment and Jobs Act of 2021, and the Americans with Disabilities Act. Final payment is contingent upon a final inspection by the Contract Manager and the submission of a notarized Certificate of Contract Completion. The agency decision was posted on October 15, 2026, with a 72-hour protest window ending on October 20, 2026.
Florida Fish and Wildlife Conservation Commission

POSTED

about 18 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237310
New
SLED
S&S Greenway Phase 3 Project (Federal Aid) & Josh Hagin Road Paving Project
Solicitation # FY27-ENGCP-002-1
The Bulloch County Board of Commissioners is soliciting sealed bids for solicitation FY27-ENGCP-002-1, which encompasses two primary infrastructure projects in Georgia: the S&S Greenway Phase 3 Project and the Josh Hagin Road Paving Project. The S&S Greenway project involves extending a shared use path by approximately 1.96 miles from the Five Points Roundabout to Grimshaw Road, while the Josh Hagin Road project involves base and paving for approximately 1.94 miles extending to the intersection at Grimshaw Road. The contract will be awarded to the lowest responsible and reliable bidder who is a GDOT Prequalified Contractor. Bids must be physically delivered by November 13, 2026, at 3:00 PM EST, and must include a bid bond for 5 percent of the total bid. The project is funded by federal assistance through the FHWA and administered by GDOT, requiring compliance with the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Buy America provisions. The successful contractor must perform at least 30 percent of the work with its own organization and designate a Worksite Utility Coordination Supervisor. Performance and payment bonds are required at 100 percent and 110 percent of the contract price, respectively. Substantial completion is required by December 31, 2027, with final acceptance and completion due by January 31, 2028. All materials must be sourced from the GDOT Qualified Products List and adhere to the 2021 GDOT Standard Specifications.
Bulloch County Board of Commissioners

POSTED

about 19 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
Federal
UT NP ARCH 100(2) Bridges on Delicate Arch Road
Solicitation # 6982AF27B000005
Project UT NP ARCH 100(2) involves the reconstruction and restoration of Delicate Arch Road within Arches National Park, Utah. The primary objective is to replace inadequate culverts at Salt Valley Wash, Salt Wash, and Winter Camp Wash with three 100-foot span concrete bridges to mitigate flooding, improve sediment transport, and enhance visitor safety. The scope of work includes raising the roadway profile to accommodate a 10-year design frequency, realigning the road at Salt Valley Wash, and performing full depth reclamation and pavement overlays on remaining road sections and parking areas. Key construction elements include the installation of drilled shafts, structural concrete, epoxy-coated reinforcing steel, and extensive asphalt concrete pavement. Administered by the Federal Highway Administration's Central Federal Lands Highway Division, this project is solicited as a full and open competition with a HUBZone price preference. The estimated cost ranges between $10 million and $20 million, with a performance period beginning in December 2026 and concluding in December 2028. Award will be granted to the lowest responsive and responsible bidder based on a tiered evaluation of Schedule A and Options X and Y. The contract is subject to the Davis-Bacon Act, the Buy American Act, and FP-14 standard specifications, with liquidated damages set at $8,700 per calendar day for delays.
6982AF Central Federal Lands Divisi

POSTED

about 21 hours ago

DEADLINE

in 25 days
View Details