Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

WESTERN OILFIELDS SUPPLY COMPANY

Parent36 subsidiariesUEI: YNUKZ8AAY727CAGE: 0HRE2

WESTERN OILFIELDS SUPPLY COMPANY is a federal contractor, registered under UEI YNUKZ8AAY727 and CAGE code 0HRE2. It has been awarded $6,962,383 in federal contracts. Primary work spans Iron and Steel Mills, Unknown NAICS, and Commercial and Institutional Building Construction. Top awarding agencies include Department Of The Interior, Department Of Defense (dod), and Export-Import Bank Of The United States.

Contact Information

Registration and classification details

Registration

UEI Code

YNUKZ8AAY727

CAGE Code

0HRE2

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S Corporation

NAICS Codes

221310Water Supply and Irrigation Systems
237110Water and Sewer Line and Related Structures Construction
238990All Other Specialty Trade Contractors
326122Plastics Pipe and Pipe Fitting Manufacturing
331210Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
+5 more

Subsidiaries

36 companies roll up into WESTERN OILFIELDS SUPPLY COMPANY, sized by each one's own awards

See all
Show 28 more

Compete with WESTERN OILFIELDS SUPPLY COMPANY

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for WESTERN OILFIELDS SUPPLY COMPANY

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in WESTERN OILFIELDS SUPPLY COMPANY's top NAICS codes and agencies

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis-McChord, Washington. The project, estimated between $1 million and $5 million, involves site preparation, the erection of the steel building, installation of a concrete slab, and the implementation of underground utilities and stormwater mitigation via an infiltration pond. Specialized requirements include the purchase and testing of dehumidifying equipment, a dry pipe fire suppression system compliant with NFPA 13 and UFC 3-600-01, and the installation of conduit to support a future photovoltaic solar system. The government will award a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented project schedule with a total completion date not exceeding 360 days from the Notice to Proceed, as well as qualifications for key personnel. The project is subject to Davis-Bacon prevailing wage rates for Pierce County and requires both performance and payment bonds for awards exceeding $150,000. All construction must adhere to JBLM Department of Public Works engineering requirements, with specific quality standards including ISO 9001 and NETA ATS. Offers are due by October 18, 2026.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 15, 2026, with a response deadline of November 4, 2026. To ensure project financing and avoid being deemed non-responsive, bidders must strictly adhere to six Good Faith Effort (GFE) requirements. Mandatory documentation that must be submitted with the bid package includes proof of public notification, specifically online postings for 30 consecutive calendar days and a print newspaper posting for at least one day, as well as evidence of utilizing the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Documentation regarding outreach efforts, such as call logs and emails, may be submitted up to three business days after the bid closing date. Prime contractors are further required to flow these GFE requirements down to any subcontractors they may award.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 19 days
View Details
NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was prompted by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. Key technical requirements include the provision of a Certified Industrial Hygienist for daily site visits, the implementation of a detailed remediation plan featuring HEPA filtration and negative air pressure, and a final clearance walkthrough. The contract is a single lump sum award based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must be small businesses or certified socioeconomic categories and must hold a valid Indiana Contractor's License. Proposals are due by November 9, 2026, and must include a detailed cost breakdown, a timeline for substantial completion, and certification of compliance with Davis Bacon Act wage rates. The selected contractor must start work within 14 days of the Notice to Proceed. Payment terms are Net 30, and the Atterbury Job Corps Center is tax-exempt. Final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens from all subcontractors.
Atterbury Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 24 days
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. Managed by C. Overaa & Co., the project has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor (MBR) system, headworks, UV disinfection, and SCADA; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining existing wastewater treatment services and compliance with General Order/NOA requirements throughout the first two phases of construction. This solicitation is open to various small and disadvantaged business enterprises, including DBE, DVBE, SDVOSB, SBE, MBE, VOSB, and WBE. A significant local hiring goal is in place, requiring that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must agree to the Overaa standard agreement without modification and comply with specific insurance requirements, including a waiver of subrogation for workers compensation. Administrative details include the use of the Textura electronic invoicing system, with subcontractors responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation, operating the Joliet Job Corps Center for the U.S. Department of Labor, is seeking bids for a fixed-price, single lump sum subcontract for road and parking lot repairs in Illinois. The project scope includes the full-depth removal and replacement of approximately 62,500 square feet of asphalt across five specific areas, including the Guard Shack, Dorm Parking Lot, West Side of Dorms, Kitchen/BCT, and Dumpster/Maintenance areas. Additionally, the contractor must repair five storm sewer drain structures and patch five potholes. The estimated contract value ranges from $100,000 to $250,000, with a required performance period of 90 consecutive business days following the written Notice to Proceed. Bids are due by October 21, 2026, and will be awarded based on overall best value. To be considered, bidders must conduct a physical site visit, submit a signed MTC Bid for Lump Sum Contract form, and provide a detailed cost breakout on company letterhead. Because the project exceeds $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone. Compliance requirements include adherence to Construction Wage Rate Requirements (CWRR) and the provided Wage Determination, as well as the submission of an SF 1413 form. Contractors must also provide a completed MTC Supplier Packet, including a W-9 and self-certification. Payment is based on intervals or percentage of completion using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance requires a written notification, a final inspection, and the submission of closeout documentation, including a Notice of Final Completion and a Certificate of Release of Liens.
Joliet Job Corps

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details