Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

WHITEFISH ENERGY HOLDINGS, LLC

UEI: R6WPNUNWJS57

WHITEFISH ENERGY HOLDINGS, LLC is a federal contractor, registered under UEI R6WPNUNWJS57. It has been awarded $2,782,089 in federal contracts. Primary work spans Power and Communication Line and Related Structures Construction. Top awarding agencies include Department Of Energy and Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

R6WPNUNWJS57

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

4

All time

Active

0

Currently performing

Completed

4

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with WHITEFISH ENERGY HOLDINGS, LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for WHITEFISH ENERGY HOLDINGS, LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in WHITEFISH ENERGY HOLDINGS, LLC's top NAICS codes and agencies

NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The project scope includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through P18, the installation of all-dielectric self-supporting fiber optic cable along the entire length, and the delivery of a complete, operable substation. The contractor is responsible for providing ductile iron poles, fiberglass crossarms, and various transmission assemblies, while the owner will furnish specific self-supporting steel poles. The engineer's estimate for the project is $1,900,000. Bidders must adhere to strict compliance standards, including State of Ohio prevailing wage laws, the National Electric Safety Code, and ADA requirements. Submissions must include a bid bond of at least 10% of the total bid amount, and the successful awardee will be required to post a combined performance-payment bond for 100% of the contract value. Award decisions will be based on a comparison of the relative merits of each offering. Payment terms specify that applications for payment are submitted monthly, with 90% of equipment value payable upon delivery and the final 10% due upon satisfactory energization and acceptance of the system. Bids are due by October 19, 2026, and may be submitted via Bid Express, email, or hard copy.
City of Piqua

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237130
New
SLED
Transmission Line Installation - LETA
Solicitation # 3000026811
Solicitation 3000026811 is an Invitation to Bid issued by the State of Louisiana, Office of State Procurement, for the installation of transmission lines for the LA Educational TV Authority (LETA). The project is located at WLPB Channel 25 in Baton Rouge, Louisiana. The selected contractor must provide all necessary labor, materials, equipment, tools, and supervision to complete the installation, adhering to specific tower details and specifications that include addressing missing hangers and securing flex jumpers and Kellum grips for various line sizes. All provided products must be new, and specific handling and marking requirements are mandated for the ERI Inc. Trasar antenna to prevent damage during installation. Bids are due by November 5, 2026, and must be submitted via the LaGov vendor portal or in clearly marked physical packaging. To be considered, bidders must be registered in the LaGov system and provide proof of a mandatory jobsite visit via a verification form or agency letter. For bids exceeding 50,000 dollars, a bid security of 5 percent is required. The contract may be extended for two additional 12-month periods, not to exceed a total term of 36 months. Compliance with WCAG 2.1 Level AA accessibility standards, federal and state non-discrimination laws, and GSA suspension and debarment certifications for bids over 25,000 dollars is mandatory.
Procurement

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237130
New
SLED
Fiber to the Home Construction Project
Solicitation # RFP-2026-0001
The City of Sherwood, Oregon, is soliciting construction services for a fiber-to-the-home project under solicitation RFP-2026-0001. The project involves the underground installation of a 1 and 10 gigabit XGS-PON distribution network covering all premises within the city. The scope of work focuses exclusively on fiber construction components, including the installation of single-mode fiber-optic cables ranging from 24 to 864 strands, two-inch conduits, vaults, handholes, and fiber distribution cabinets. The contractor is responsible for all labor, directional boring, splicing, testing, and restoration, while active electronics are excluded from this bid. Materials are staged at 15527 SW Willamette Street, and the contractor must adhere to strict labeling requirements for splice cases and termination panels, as well as specific field marker installations. Proposals are due by November 20, 2026, and must not exceed 15 pages. Submissions must include a company background, project narrative, organizational chart, three references from the last five years, and a completed pricing form. To be considered responsive, bids must be accompanied by a 10 percent bid security and an approved First-Tier Subcontractor Disclosure Form. The contract requires strict compliance with Oregon Revised Statutes, including BOLI prevailing wage rates, non-discrimination certifications, and the Americans with Disabilities Act of 1990. Insurance requirements include a minimum of 2 million dollars for general liability and 1 million dollars for employer's liability. All work must meet City of Sherwood Construction Standards, OSHA safety regulations, and National Electrical and Fire Codes, with hardware from TL 9000 registered manufacturers.
City of Sherwood

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
2026 Wooden Street Light Pole Replacement
Solicitation # 2018-26
The City of Rohnert Park is soliciting bids for the 2026 Wooden Street Light Pole Replacement project, identified as solicitation number 2018-26. The project involves the replacement of 47 existing wooden street light poles within the F and H Neighborhood Sections of Rohnert Park, California. Specifically, the scope includes the removal and replacement of 22 poles with foundations and 25 poles with direct bury, utilizing galvanized steel poles and mast arms equipped with EOI Roadway Lighting LED Luminaires. The engineer's estimate for the project is 585,000 dollars. Eligible contractors must possess a valid California Class C-10 contractor's license. The selected contractor is required to begin work within 15 calendar days of the official notice to proceed and must complete all work within 240 calendar days. This is a unit price contract, and the award will be based on the base bid. Bidders must submit sealed proposals by November 5, 2026, including bid security and certifications regarding noncollusion, eligibility to contract under the California Labor Code, and compliance with California Air Resource Board requirements for off-road diesel-fueled fleets. Contractual requirements include the provision of performance bonds for bids exceeding 25,000 dollars and payment bonds per California Civil Code Section 9550. The project is subject to California prevailing wage laws and federal labor standards if federal funding is utilized. The contractor is responsible for implementing an independent quality control program and managing all public safety measures, including street closures and detours. Payments will be made monthly based on unit prices or lump-sum proposals, with the City allowing 100 percent pre-payment for delivered materials less a 5 percent retention.