Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

1030 Kaiser Road Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Napa is forecasting the construction of a multi-tenant light-industrial building at 1030 Kaiser Road in Napa, California. The facility will encompass 153,380 square feet, consisting of 130,373 square feet of warehouse space and 23,007 square feet of office space. Site access will be managed through one driveway on Kaiser Road and three driveways on Syar Way. The project includes extensive site improvements such as 242 parking spaces, exterior lighting, and landscaping along the building frontage. Additional infrastructure features a pedestrian path connecting the Kaiser Road sidewalk to internal walkways and four bioretention areas totaling approximately 20,969 square feet. Primary coordination for the project is handled by Associate Planner Angela Alvarez-Cendejas.

General Info

City of Napa constructing 153,380 square foot multi-tenant light-industrial building at 1030 Kaiser Road.

Agency

California → City of Napa

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Kaiser Road, Syar Way, Napa, CA, 94559

Set-Aside

NONE

Documents

(18)

Appendix F2 - Project Trip Generation

PDFspecifications

1030 Kaiser Rd Napa - Appendix F1 Noise Survey Sheets

PDFsow

Appendix F4 - HVAC Analysis

PDFspecifications

1030 Kaiser Road Project Draft IS/MND Notice of Availability

PDFspecial-notice

Appendix C Geotechnical Report – 1030 Kaiser Road Warehouse

PDFsow

1030 Kaiser Road Project Biological Resources Assessment

PDFsow

Appendix E2 Stormwater Drainage Analysis, 1030 Kaiser Road Project

PDFsow

1030 Kaiser Road Appendix A1 CalEEMod Output Sheets

PDFsow

1030 Kaiser Road Project - Initial Study/Mitigated Negative Declaration

PDFmnd

1030 Kaiser Road Project - Summary Form for Electronic Document Submittal

PDFother

1030 Kaiser Road Project Environmental Listing Notice

PDFspecial-notice

1030 Kaiser Road Project_Appendix A2 Health Risk Assessment (HRA)

PDF

Appendix G Vehicle Miles Traveled Memorandum

PDFsow

1030 Kaiser Road Appendix F5 Fire Pump Noise Data

PDFother

1030 Kaiser Road Project_Appendix D Phase I ESA

PDF

Appendix E1 Stormwater Control Plan – Napa Valley Vintners Park

PDFsow

Appendix F3 - Carrier 5 Ton Heat Pump Product Data

PDFspecifications

1030 Kaiser Road Project - Notice of Completion

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Napa
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Napa
Office AddressN/A
Contacts
Angela Alvarez-CendejasAssociate Planner

Interested Companies (1)

Show more
LSA Associates
Clovis, CA

Full Description

Show more
The Project would construct a 153,380-square-foot, multi-tenant light-industrial building at the Project Site. The building would include approximately 23,007 square feet of office space and 130,373 square feet of warehouse space. The Proposed Project would also provide site improvements, including a pedestrian path connecting the Kaiser Road sidewalk to internal pedestrian walkways, landscaping throughout the Site and along the building frontage, four (4) bioretention areas measuring approximately 20,969 square feet, exterior lighting in surface parking areas, and approximately 242 parking spaces for employees and visitors. The Project Site would be accessed by one (1) proposed driveway on Kaiser Road and three (3) proposed driveways on Syar Way.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
B145 DCMA Office Space Renovation
Solicitation # W50S8A26QA035
The U.S. Government is seeking a single firm fixed price contract for the renovation of office space in Building B145 at Pease Air National Guard Base in Newington, New Hampshire, under solicitation W50S8A-26-Q-A035. The work encompasses full reconstruction and reinstallation of building systems including electrical, HVAC, fire alarm, insulation, and utility infrastructure, with all required plant, labor, materials, tools, equipment, and supervision to be provided by the contractor. The anticipated performance period is 90 calendar days, beginning upon receipt of the Notice to Proceed, and the contract is set aside entirely for small businesses under NAICS code 236210 with a size standard of $45 million. The solicitation requires submission of a complete quote via email by 2:00 PM EST on August 21, 2026, and includes mandatory compliance with numerous FAR and DFARS clauses covering security, cybersecurity, subcontractor reporting, ethical conduct, labor standards, and environmental controls. Offerors must be registered in SAM.gov, provide their UEI and CAGE code, and complete all required representations regarding small business status, foreign ownership, and compliance with prohibitions on covered telecommunications and other restricted items. A site visit is scheduled for August 5, 2026, and access to the installation requires prior coordination and adherence to security protocols, including U.S. citizenship or legal residency, criminal history checks, HSPD-12/FIPS PUB 201 personal identity verification, and obtaining government-issued badges through DBIDS. All contractor personnel must complete AT Level 1 awareness training and clearly identify themselves as non-government personnel. The government will award the contract based on the most advantageous offer considering price, technical acceptability, and past performance, under a trade-off process rather than LPTA. Funds are not yet available, and payment will be made upon award using WAWF for electronic invoicing. Additional deliverables include a Quality Control Plan, Environmental Plan, Waste Management Plan, list of subcontractors, record drawings, and documentation of compliance with OSHA and asbestos regulations. All materials must be properly labeled, preserved, and supplied with a 5% overage as specified, and the contractor assumes full responsibility for security clearances, access, and compliance with inspection standards at the destination site.
W7NN Uspfo Activity Nhang 157

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 236210
New
SLED
1515 Walnut Grove Avenue ProjectThe 1515 Walnut Grove Avenue Project, located in Rosemead, California, involves the demolition of a 268,015 square foot office and central plant building to develop a residential planned development on a 9.28-acre site. The proposed project consists of 191 dwelling units across 27 buildings, featuring tandem and row townhomes with approximately 238,616 square feet of residential floor area. This development includes parking, open space, amenities, and landscaping. To facilitate this, the applicant, 1515 Walnut Grove, LP, is seeking a General Plan Amendment from Office/Light Industrial to High Density Residential, a Zone Change from Medium Commercial to Planned Development, and associated subdivision and development entitlements. Comprehensive environmental and technical evaluations have been conducted to support the project, including a Mitigated Negative Declaration under CEQA. Key assessments cover air quality, greenhouse gas emissions, noise and vibration, and traffic impacts, with a projected opening year of 2029. Technical reports have addressed sanitary sewer capacity, water availability from the San Gabriel Valley Water Company, and hydrology and hydraulics for stormwater management. Additionally, the project has undergone a Phase I and Phase II Environmental Site Assessment, a geotechnical investigation including a fault rupture hazard study, and assessments of archaeological and paleontological resources. The City of Rosemead is the lead agency overseeing the project, with Kimley-Horn providing project management and technical consultancy.
City of Rosemead

POSTED

3 days ago

DEADLINE

N/A
View Details
NAICS: 236210
New
SLED
Apple Valley 84 ProjectThe Apple Valley 84 Project is a large-scale industrial development in Apple Valley, California, encompassing the construction of a single building spanning approximately 1.38 million square feet, along with supporting infrastructure including 528 parking stalls, 898 trailer parking spaces, and 231 loading dock positions. The project includes significant roadway improvements along Stoddard Wells Road, Wrangler Road, and Johnson Road, with widening of the first two roads to their ultimate sections and the new construction of Johnson Road, as well as frontage landscaping and pedestrian enhancements. The project site is located within the Mojave Basin Area, specifically near the North Apple Valley Industrial Park, and construction activities are scheduled across multiple phases from late 2026 through late 2028, beginning with demolition and site preparation and culminating in paving and architectural coating work. Environmental compliance and regulatory oversight are critical components, with inspections governed by ASTM E1527-21 and E1527-13 for environmental site assessments, town-specific Technical Guidelines for Water Quality Management Programs, and adherence to California Ambient Air Quality Standards and Mojave Desert Air Quality Management District thresholds. The contractor is responsible for daily inspections and Best Management Practices maintenance, subject to oversight by the Lahontan Regional Water Quality Control Board and other state and local agencies. While the project includes numerous environmental, geotechnical, and stormwater management requirements, the available documentation does not contain standard federal acquisition elements such as contract clauses, evaluation factors, pricing details, contract type, payment instructions, or representations and certifications typically found in federal solicitations, indicating this is a municipal procurement conducted under state and local regulatory frameworks rather than federal acquisition rules. Contact for the project is managed through a team of consulting planners and principals from firms including InterWest Group, TB Planning, and Covington Group Inc., with no federal contracting officer or contracting administration data identified in the records.
Town of Apple Valley

POSTED

3 days ago

DEADLINE

N/A
View Details