Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

13.8 kV Underground Cable Installation

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

City of Medicine HatView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

This scope was carved out of CMH26-103.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

MHS-11 Transmission and Distribution Line Construction Services

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCity of Medicine Hat
ContactsNo contacts available
OfficeN/A
Organization / Agency
City of Medicine Hat
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs, commissions, and tests underground power cables for prime contractors on City of Medicine Hat utility projects. Installs 13.8 kV cables within PVC conduit per Section 2.26 of the construction work package using cable testing and commissioning equipment. Delivers a commissioned and tested 13.8 kV underground cable system.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves the provision and installation of two new 40ft by 8ft steel FLEXTAINER conex offices for forensic personnel at the HSI Facility in St. Thomas, US Virgin Islands. The scope of work includes the construction of two 3k PSI reinforced concrete slabs with #4 rebar, installation of the units, and full integration of electrical systems via 2-inch PVC conduit. Each office will be equipped with a split-system A/C unit, R-11 insulation, vinyl flooring, four high-efficiency LED lamps, multiple 120V outlets, a steel door with a Cypher lock, four security windows, and a 5-pound ABC fire extinguisher. All materials must comply with the Buy American Act and meet IBC and NFPA 70 standards. The contract is a firm-fixed-price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, with an estimated magnitude between $250,000 and $300,000. The total period of performance is 364 calendar days from the Notice to Proceed, with a requirement to submit a project schedule within 15 days of that notice. Award will be based on the lowest total evaluated price, considering the technical approach, safety and quality control plans, and price. Contractors must adhere to US Virgin Islands prevailing wage determinations and ensure all personnel sign required DHS non-disclosure agreements and undergo security background checks. Payment requests are to be processed electronically via the Invoice Processing Platform accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238210
New
Los Angeles Job Corps Egress Lighting
Solicitation # Emergency Egress Lighting
Management & Training Corporation (MTC) is seeking a small business subcontractor under NAICS code 238210 to provide emergency egress lighting services for the Los Angeles Job Corps center. The project involves the furnishing and installation of four emergency egress lighting fixtures at a warehouse facility located at 424-426 Towne Avenue, Los Angeles, California. Specifically, the contractor must install two lights near the primary front exit doors, one on the storage area wall, and one on the mezzanine level. The scope of work includes testing battery backup systems and emergency illumination functions, ensuring compliance with all applicable life safety, fire, and electrical codes, and performing final site restoration. Bids must be submitted as a lump sum fee by September 25, 2026, and must include a bid sheet, supplier packet (W-9, self-certification, and acceptance of terms), proof of insurance, three references, and a completed FAR 52.204-10 First-Tier Subcontractor Information form. Award will be based on best value. The contractor must comply with Service Contract Labor Standards as per Wage Determination No. 2015-5613 Rev 31 and adhere to strict Department of Labor requirements regarding privacy breach notifications, mandatory training, and records management. Invoicing is to be submitted on a weekly or bi-weekly basis, and subcontractors with projects valued at $40,000 or more must possess a Unique Entity Identifier (UEI).
MTC Los Angeles Job Corps

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details

More opportunities from City of Medicine Hat

Same awarding agency

NAICS: 213112
International
Swabbing Services - Gas Production
Solicitation # CMH26-104
The City of Medicine Hat has issued Request for Proposals CMH26-104 for swabbing services for sweet shallow gas well optimization on an as-required basis. The scope of work involves performing swabbing operations on wells with depths between 300m and 600m, primarily located in the NW and NE Medicine Hat area. The successful contractor must be capable of swabbing 10 to 12 wells per day when in close proximity and provide detailed operational documentation. The contract is a unit price agreement with an initial one-year term and potential extensions for up to four additional years, totaling a maximum duration of five years. Proponents must meet mandatory requirements, including a compliant status with ComplyWorks linked to the City of Medicine Hat and adherence to technical specifications in Appendix D. Evaluation is based on a ranking system combining pricing, which accounts for 50 points, and the acceptance of the Articles of Agreement as is. The top-ranked proponent will enter direct negotiations to finalize the contract. Key operational requirements include using secondary containment dishes and tarps, adhering to Alberta Occupational Health and Safety and Worker's Compensation Acts, and maintaining a valid City of Medicine Hat business license. Payment terms are net 30 days from the receipt of an invoice.
Support Activities for Oil and Gas Operations

POSTED

15 days ago

DEADLINE

in 5 days
View Details
NAICS: 237990
International
Echo Dale Regional Park - Erosion Remediation & Boardwalk Replacement
Solicitation # CMH26-105
The City of Medicine Hat is soliciting proposals under RFP CMH26-105 for erosion remediation and boardwalk replacement at the Echo Dale Regional Park Boat Lake. The scope of work includes installing erosion control measures, such as riprap or matting, on the boat lake island and replacing the existing boardwalk at the boat launch dock using screw piles and decking. This is a unit price contract requiring a detailed project schedule developed via the Critical Path Method. Technical specifications include the use of UPVC pipes with specific embossed markings and adherence to the National Building Code for quality control. Proposals must be submitted electronically by September 22, 2026, and require a mandatory site visit, which occurred on September 10, 2026. Eligible bidders must maintain a compliant status with ComplyWorks and provide a Company Quality Control Management Plan. Financial requirements include a bid bond or letter of credit for 10 percent of the proposal price, with the successful contractor providing performance and payment bonds for 50 percent of the contract value. Insurance mandates include five million dollars in commercial general liability and all risks course of construction property insurance from Alberta licensed insurers. Payment is processed monthly via proper invoices, with the City retaining a 10 percent holdback on all payments.
Other Heavy and Civil Engineering Construction

POSTED

17 days ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS