Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

16--SERVOCYLINDER ASSEM, IN REPAIR/MODIFICATION OF

Awarded
N0038325RB047Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
Overhaul Of Two (2) Boiler Feedwater Pumps, Motors & Valves
Solicitation # 5740
The City of Redding is soliciting proposals for the off-site shop inspection and overhaul of two Sulzer boiler feedwater pumps, two WEG motors, and two Fisher recirculation valves and their actuators. The scope of work includes the disassemble, clean, inspect, and overhaul (DCI) process, with the contractor managing all shipping, packaging, and handling of equipment to and from their facility. On-site services are limited to technical advisory supervision provided by Technical Field Advisors. A critical requirement is that the overhauled equipment must be returned to the power generation facility in Redding, California, within approximately 21 days of its initial removal and shipping. Award will be based on the best overall value, evaluated through a weighted system that prioritizes total project costs (30 points), contractor qualifications and experience (20 points), project approach and schedule conformance (20 points), understanding of project requirements (15 points), and proposal quality (5 points). The City is not required to award to the lowest cost proposer. Bidders must provide a bid security of 10%, along with payment and performance bonds of 100% and a maintenance bond of 50%. Proposals must be submitted by 3:00 p.m. PT on December 4, 2026, and must include a separate sealed envelope for the project costs and fee schedule. Because the services are off-site and professional in nature, prevailing wages under the California Labor Code are not required.
City of Redding

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This request for proposal from Navsup Weapon Systems Support is for the repair, overhaul, and testing of Servocylinder Assemblies, specifically part number 1650-01-455-2590. The contractor is required to restore these units to a Ready For Issue condition using approved technical publications and procedures. The scope includes providing all necessary labor, facilities, materials, and tooling, as the government will not provide manufacturing aids. All work must be performed at the identified facility in Santa Clarita, California, and must adhere to ISO 9001 or SAE AS9100 quality standards. Key contractual provisions include a 365-day warranty starting from the last delivery and strict guidelines regarding Beyond Economical Repair and Missing on Induction determinations, both of which require written concurrence from DCMA. The government requests quotes as either a firm-fixed price or test and evaluation pricing. Any deviations from approved repair procedures or changes to the manufacturing source require prior approval from the Procuring Contracting Officer. Additionally, part cannibalization is strictly prohibited unless specifically authorized by Navsup WSS and the Basic Design Engineer.

General Info

Contract Value

$2,482,000

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

1

N0038325RB047.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA
Contacts

Full Description

Show more
CONTACT INFORMATION|4|N00383|F-18|+1 (555) 000-0000|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|invoice and receiving report combo|Source|TBD|N00383|TBD|TBD|See Schedule|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 days|45 days of the last delivery under this contract||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9|||||||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL PRODUCTS AND COMMERCIALSERVICES (MAY 2024))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|12|336413|1,250||||||||||| TYPE OF CONTRACT (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||A7| EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)|4||||| This RFP is for repair. NAVSUP WSS requests that contractors submit a quote that includes either a firm-fixed price or TT&E pricing as well as estimate costs to repair this item. The Small Business Administration representative at NAVSUP WSS has reviewed this requirement and determined that a set-aside recommendation was not applicablefor this procurement. Quotes may be emailed to the below email address and must be received on or before on the closing date listed on page 1 of the solicitation. contact@example.gov. This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this contract/delivery order/purchase order/modification. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: SERVOCYLINDER ASSEM ;1650-01-455-2590; NSN , ;41010230-103; Part Number, Shall be performed IAW: SERVOCYLINDER ASSEM ;A1-H12EF-140-030; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: SERVOCYLINDER ASSEM ;41010230-103; P/N, ;1650-01-455-2590; NSN, ;A1-H12EF-140-030; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. SERVOCYLINDER ASSEM ;WOODWARD HRT, INC.; Company Name , ;25200 W RYE CANYON RD, SANTA CLARITA CA 91355; Address , ;(81873); Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA77
Solicitation NO0383-26-Q-AA77, issued by NAVSUP Weapon Systems Support, seeks a contractor to provide repair, overhaul, and modification services for electrical control panels (NSN 6110-01-433-5020). The contractor is responsible for providing all necessary facilities, labor, materials, and tooling to return units to a Ready For Issue condition. Key technical requirements include adherence to MIL-STD-130 for markings, the prohibited use of MIL-W-81381 wire in favor of SAE-AS22759, and compliance with ISO 9001/SAE AS9100 quality standards. The scope includes strict protocols for handling items determined to be Beyond Economical Repair, Missing on Induction, or requiring Over and Above Repair, all of which require written concurrence from DCMA and the Procuring Contracting Officer. The government intends to make a single award based on a trade-off between price and past performance, with past performance weighted as the more important factor. Deliveries are expected within 90 days, with Repair Turnaround Time measured from asset return to acceptance at the origin. Packaging must comply with MIL-STD-2073-1 and MIL-STD-129, with specific requirements for electrostatic protection and Depot Level Repairable labeling. Invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow system. The resulting contract will be a DO rated order certified for national defense.
Motor and Generator Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336413
New
Federal
CABLE ASSEMBLY,ROTA
Solicitation # N0038327QAA18
This fixed-price solicitation, issued by Navsup Weapon Systems Support Philadelphia, is for the overhaul, upgrade, repair, testing, and inspection of the Cable Assembly, ROTA (NSN 1680-01-661-7957, Part Number 5217008-110). The primary objective is to return these assets to a Ready For Issue (RFI) condition, ensuring they perform reliably in their intended operational environment. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, with a specific prohibition against using MIL-W-81381 wire, requiring SAE-AS22759 series wire instead. The contract includes a one-year induction period from the date of award, after which any assets received require bilateral agreement for repair. Performance is governed by strict quality and timing requirements, including a defined Repair Turnaround Time (RTAT) and throughput constraints. The contractor must maintain a quality system conforming to ISO 9001 or SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. Key administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and the adherence to MIL-STD-130 for markings and MIL-STD-2073 for packaging. Award evaluation will prioritize past performance as the primary factor, followed by price as the secondary factor, with the government utilizing the DoD Supplier Performance Risk System (SPRS) to assess item, price, and supplier risk.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336412
New
Federal
GUARD,GASOLINE ENGI
Solicitation # N0038327QTA11
Solicitation N0038327QTA11, issued on October 8, 2026, by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the procurement of a Gasoline Engine Guard, identified by NSN 2810-01-737-5535. The government intends to make a single award to a responsible offeror based on a best-value determination where past performance is considered more important than price. Evaluation of past performance may include the use of the DoD Supplier Performance Risk System to assign color ratings, while price serves as a secondary factor. Quotations are due by November 9, 2026, and the required delivery period is 90 days FOB Destination to the DLA Distribution New Cumberland facility in Pennsylvania. The contract mandates strict adherence to military standards for packaging and marking, specifically MIL-STD-2073-1 and MIL-STD-129, with specific requirements for domestic and overseas shipments. Contractors must comply with cybersecurity standards outlined in NIST SP 800-171 and DFARS 252.204-7012. Quality management compliance with ISO 9001 or SAE AS9100 is required, and inspection and acceptance will occur at the origin. Administrative requirements include the use of the Wide Area Workflow system for invoicing and payment, and compliance with the Buy American and Balance of Payments Program. Offerors must also provide hazardous material certifications and safety data sheets if applicable.
Aircraft Engine and Engine Parts Manufacturing

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details
NAICS: 334511
New
Federal
66--INDICATOR,ATTITUDE, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QBB18
This solicitation, issued by NAVSUP Weapon Systems Support Philadelphia, is a Request for Quotations for the repair, overhaul, upgrade, and inspection of 33 Attitude Indicators (NSN 6610-01-101-1927 LC, P/N 622-3374-002). The objective is to return these units to a Ready For Issue condition, ensuring they perform reliably in operational environments. The contract includes an initial induction period of 365 calendar days, which the government may extend by an additional year. Offerors must provide option pricing for a maximum of 135 units over the total contract period. Award will be granted to the offeror with the lowest price technically acceptable quote, with past performance evaluated via the DoD Supplier Performance Risk System. The contractor is responsible for providing all labor, facilities, materials, and tooling, as government-furnished manufacturing aids are not provided. Key technical requirements include compliance with ISO 9001 or SAE AS9100 quality systems and calibration standards such as ANSI/NCSL Z540.3 or ISO-10012-1. Specific prohibitions are in place regarding the use of MIL-W-81381 wire, requiring the use of SAE-AS22759 series wire instead. The contract establishes strict protocols for Beyond Economical Repair and Missing on Induction determinations, both of which require written concurrence from DCMA. Deliveries are FOB Destination with a 90-day delivery window, and all packaging must adhere to MIL-STD-2073 and MIL-STD-129 standards. Invoicing and receiving reports must be processed electronically through the Wide Area Workflow system.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

about 4 hours ago

DEADLINE

in 14 days
View Details
NAICS: 336320
New
Federal
CONTROL,ELECTRIC LI
Solicitation # N0038326QAA79
Solicitation N0038326QAA79, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside request for quotations for the teardown, evaluation, repair, and modification of the Control, Electric L1 (NSN 7RH 6220-01-435-0198KB, P/N 712860-1). The objective is to return these units to a Ready For Issue condition, ensuring they perform reliably in their intended operational environment. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids such as fixtures or special test equipment. All work must be performed in accordance with the most recent technical publications and approved repair manuals, with specific prohibitions against the use of MIL-W-81381 wire, requiring SAE-AS22759 series wire instead. The contractor must maintain a rigorous quality management system compliant with ISO 9001 or SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. Key requirements include the maintenance of detailed historical record files for each serial number and the submission of all failure analysis and corrective action reports to the government. While the contractor is granted Internal Review Board authority for minor non-conformances, formal Material Review Board authority for as-is dispositions remains with the government. Award will be made to a single offeror based on the most advantageous combination of price and past performance, with past performance weighted as more important. Deliveries are FOB Destination, and all items must be preserved and packaged according to MIL-STD-2073-1.
Motor Vehicle Electrical and Electronic Equipment Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334511
New
Federal
66--PROCESSOR,FLIGHT IN, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QBB19
Solicitation N0038326QBB19, issued by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the teardown, evaluation, repair, and modification of Flight Processors (NSN 6610-01-622-1414). The contract covers a maximum of 30 units over a potential two-year period, with a delivery requirement of 90 days and FOB Destination terms. Award will be based on Lowest Price Technically Acceptable criteria, though past performance is noted as more important than price. Because the item is flight critical, government source approval is mandatory prior to award. The contractor is responsible for providing all labor, materials, and tooling necessary to return units to Ready For Issue condition, as the government will not provide manufacturing aids. Strict quality standards are mandated, including compliance with ISO 9001 or SAE AS9100 and calibration standards such as ANSI/NCSL Z540.3. Key technical requirements include the prohibition of MIL-W-81381 wire in favor of SAE-AS22759 and adherence to MIL-STD-130 for markings and MIL-STD-2073 for packaging. The contractor must maintain comprehensive quality control documentation and historical record files for each serial number, with formal Material Review Board authority for as-is dispositions retained by the government.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details
NAICS: 336413
New
Federal
IGITAL RECEIVER MO
Solicitation # N0038327RAA16
This solicitation, issued by NAVSUP Weapon Systems Support, is for the teardown, evaluation, repair, and modification of the Digital Receiver MO (NSN 1680-01-599-1106, Part Number 5204400-105) to return the assets to a Ready For Issue condition. The contractor is responsible for providing all necessary labor, facilities, materials, and tooling, with repairs performed according to Raytheon Company drawing 4U884 and applicable technical publications. The contract includes a one-year induction period from the date of award, with delivery measured by a specific Repair Turnaround Time from the date of physical receipt to final acceptance. The contractor must maintain a quality management system compliant with ISO 9001 or SAE AS9100 and adhere to strict documentation requirements, including historical record files for each unit by serial number. The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price. Evaluation will utilize the DoD Supplier Performance Risk System to assess supplier risk, item risk, and price risk. Key administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment, and adherence to MIL-STD-129 for marking and MIL-STD-2073 for packaging. The contract also incorporates various FAR and DFARS clauses, including the Buy American Act, priority ratings for national defense, and specific protocols for handling Beyond Economical Repair and Missing on Induction assets. Final inspection and acceptance will be conducted by the Contract Administration Office at the contractor's facility.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA84
Solicitation N0038326QAA84, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside request for quotations for the repair, overhaul, and upgrade of electrical control panels (NSN 6110-01-472-3531). The contractor is responsible for providing all necessary facilities, labor, materials, and tooling to return assets to a Ready For Issue condition, as the government will not provide manufacturing aids or special test equipment. Key technical requirements include adherence to MIL-STD-130 for markings, MIL-STD-2073 for packaging, and a strict prohibition on the use of MIL-W-81381 wire, which must be replaced by SAE-AS22759 series wire. The required repair turnaround time is 100 days after receipt of the asset. The government will make a single award based on the most advantageous offer, prioritizing past performance over price. Evaluation will utilize the Supplier Performance Risk System to assess item, price, and supplier risk. Contractors must maintain a quality management system compliant with ISO 9001 or SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. The contract includes specific protocols for Beyond Economical Repair and Missing on Induction determinations, both requiring written concurrence from DCMA. Invoicing and receiving reports must be processed through Wide Area Workflow, with final inspection and acceptance occurring at the contractor's location.
Motor and Generator Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336413
New
Federal
CONTROL AND STATUS
Solicitation # N0038327RAA14
This solicitation, number N00383-27-R-AA14, is issued by NAVSUP Weapon Systems Support for the repair, teardown, evaluation, and modification of the Control and Status item, identified by NSN 1680-01-582-7988 and Part Number 5204500-100-105. The primary objective is to restore these assets to a Ready For Issue condition in accordance with Northrop Grumman Systems Corp drawings and applicable technical publications. The contractor is responsible for providing all necessary labor, materials, and tooling, while maintaining a quality management system compliant with ISO 9001 or SAE AS9100. Key performance metrics include the Repair Turnaround Time, measured from the physical receipt of the asset to the date of government acceptance, with reporting managed through the Commercial Asset Visibility portal. The government intends to make a single award based on a best-value determination, where past performance is weighted as more important than price. Evaluation will utilize the Supplier Performance Risk System to assess item, price, and supplier risks. The contract includes strict requirements for packaging and marking per MIL-STD-2073 and MIL-STD-129, and mandates the use of the Wide Area WorkFlow system for all invoicing and receiving reports. Special provisions are included for Beyond Economical Repair and Over and Above Repair determinations, both of which require written concurrence from the Defense Contract Management Agency. Proposals must be submitted by November 30, 2026, to the NAVSUP facility in Philadelphia, Pennsylvania.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA83
Solicitation NO0383-26-Q-AA83, issued by NAVSUP Weapon Systems Support, is a request for quotations for the teardown, evaluation, repair, and modification of Electrical Control Panels (NSN 6110-01-472-3513). The objective is to return these units to a Ready For Issue condition through a process of inspection, component replacement, and testing. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids. Key technical constraints include a strict prohibition on MIL-W-81381 wire, requiring the use of SAE-AS22759 series wire instead, and adherence to MIL-STD-130 for markings and MIL-STD-2073 for packaging. The contract establishes a Repair Turnaround Time of 80 days after receipt of assets, with an induction expiration date set for 365 days after award. Performance is governed by high quality standards, requiring a quality management system compliant with ISO 9001/SAE AS9100 and calibration systems meeting ANSI/NCSL Z540.3 or ISO-10012-1. The government utilizes a specific process for Beyond Economical Repair and Missing on Induction determinations, requiring written concurrence from DCMA. Award will be made to a single, technically acceptable offeror based on the most advantageous combination of price and past performance, with past performance weighted as the more important factor.
Motor and Generator Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336413
New
Federal
16--NVG,HUD CONVERTER,A, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QQB47
Solicitation NO0383-26-Q-B47, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside request for quotations for the teardown, evaluation, repair, and modification of the NVG HUD Converter A (NSN 7RH 1680 014956018 V2). The contractor is responsible for providing all labor, facilities, materials, and tooling necessary to return these units to a Ready for Issue condition. Key technical requirements include strict adherence to MIL-STD-130 for markings, the mandatory use of SAE-AS22759 series wire in place of prohibited MIL-W-81381 wire, and compliance with ISO 9001/SAE AS9100 quality standards. All work must be performed at the identified contractor facility, and any changes to repair manuals or sources require approval from the Procuring Contracting Officer. The contract establishes specific protocols for Beyond Economical Repair and Missing on Induction determinations, both of which require written concurrence from DCMA. Deliveries are expected within 90 days, with inspection and acceptance occurring at the origin. Packaging must conform to MIL-STD-2073-1 and ANSI/ESD S20.20-2021 for electronic protection. Award will be made to a single, technically acceptable offeror based on an evaluation of technical capability and past performance risk via the Supplier Performance Risk System. Invoicing and receiving reports must be processed electronically through the Wide Area Workflow system.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 4 hours ago

DEADLINE

in 29 days
View Details
NAICS: 336413
New
Federal
16--PREAMP,MAS, IN REPAIR/MODIFICATION OF
Solicitation # N0038326RBA54
This solicitation, issued by Navsup Weapon Systems Support in Philadelphia, seeks a contractor to perform the overhaul, upgrade, repair, testing, and inspection of eight PREAMP,MAS units (P/N 5798-8000-001) to return them to a Ready for Issue condition. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids or test equipment. Work must be performed in accordance with Undersea Sensor Systems drawing 5798-8000-001 and ISO 9001 quality standards. The contract specifies a Repair Turnaround Time of 150 days after receipt of the asset, with an induction expiration date set at 365 days after the award date. The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price. Key administrative requirements include the use of the Wide Area WorkFlow system for invoicing and the adherence to MIL-STD-2073-1 for packaging and MIL-STD-129 for marking. The contract incorporates several critical FAR and DFARS clauses, including the Buy American and Balance of Payments Program and specific requirements for safeguarding sensitive conventional arms and explosives. Special provisions are included for handling items that are Beyond Economical Repair or Missing on Induction, requiring written concurrence from DCMA and the Procuring Contracting Officer.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 4 hours ago

DEADLINE

in 26 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS