Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

2025 California Building Standards Code and Local Amendments

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Laguna Woods, California, has adopted the 2025 Edition of the California Building Standards Code, effective January 1, 2026, through Ordinances 25-05, 25-06, and 25-07, which amend Title 10 of the Laguna Woods Municipal Code relating to Buildings and Construction. This adoption incorporates by reference all components of Title 24 of the California Code of Regulations, including the 2025 California Building Code, Residential Code, Electrical Code, Mechanical Code, Plumbing Code, Energy Code, Wildland-Urban Interface Code, Historical Building Code, Fire Code, Existing Building Code, Green Building Standards Code (CALGreen), and Referenced Standards Code. The ordinances also include specific local amendments to the Fire Code and Wildland-Urban Interface Code to better address regional hazards such as fire risk and seismic activity, ensuring that building practices are tailored to the city’s unique climatic, geological, and topographical conditions. These changes are intended to enhance public safety, reduce potential property damage and loss of life, and improve regulatory clarity for city staff and the public. The adoption process was completed on November 19, 2025, with the City Council approving the ordinances without further reading, and the city has formally determined that the action qualifies for exemption from the California Environmental Quality Act under sections 15060(c)(2), 15060(c)(3), and 15061(b)(3). No federal contract clauses, procurement terms, or financial details are involved, as this is a regulatory update rather than a competitive acquisition. The place of performance is citywide within Laguna Woods, California, with no specified contract value, payment process, or contractor identification, since no goods or services are being procured. Compliance with the updated codes becomes mandatory for all new construction, alterations, and repairs within the city limits as of January 1, 2026. The City of Laguna Woods, through its Senior Planner Justin Faylona, serves as the primary point of contact for inquiries, and no federal or state funding, accounting codes, or contracting officer representatives are identified, indicating that this action is purely an administrative and regulatory update to align municipal law with the latest state building standards.

General Info

Laguna Woods adopts 2025 California Building Codes effective January 1, 2026, with local fire and seismic amendments.

Agency

California → City of Laguna Woods

NAICS

541350 - Building Inspection ServicesView NAICS

Place of Performance

Laguna Woods, CA, 92637

Set-Aside

NONE

Documents

(1)

Notice of Exemption - 2025 California Building Standards Code and Local Amendments

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Laguna Woods
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Laguna Woods
Office AddressN/A
Contacts
Justin FaylonaSenior Planner

Full Description

Show more
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LAGUNA WOODS, CALIFORNIA, AMENDING TITLE 10 OF THE LAGUNA WOODS MUNICIPAL CODE (BUILDINGS AND CONSTRUCTION) AND ADOPTING BY REFERENCE THE 2025 EDITION OF THE CALIFORNIA BUILDING STANDARDS CODE (CALIFORNIA CODE OF REGULATIONS, TITLE 24), CONSISTING OF THE 2025 CALIFORNIA ADMINISTRATIVE CODE, 2025 CALIFORNIA BUILDING CODE, 2025 CALIFORNIA RESIDENTIAL CODE, 2025 CALIFORNIA ELECTRICAL CODE, 2025 CALIFORNIA MECHANICAL CODE, 2025 CALIFORNIA PLUMBING CODE, 2025 CALIFORNIA ENERGY CODE, 2025 WILDLAND-URBAN INTERFACE CODE, 2025 CALIFORNIA HISTORICAL BUILDING CODE, 2025 CALIFORNIA FIRE CODE, 2025 CALIFORNIA EXISTING BUILDING CODE, 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE, AND 2025 CALIFORNIA REFERENCED STANDARDS CODE; AND DETERMINING AND CERTIFYING THAT THE ORDINANCE IS EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT On November 19, 2025, the Laguna Woods City Council approved second reading and adopted Ordinance No. 25-06 – read by title with further reading waived – titled: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LAGUNA WOODS, CALIFORNIA, AMENDING TITLE 10 (BUILDINGS AND CONSTRUCTION) OF THE LAGUNA WOODS MUNICIPAL CODE TO ADOPT CERTAIN AMENDMENTS, ADDITIONS, AND DELETIONS TO THE 2025 CALIFORNIA FIRE CODE (CALIFORNIA CODE OF REGULATIONS, TITLE 24, PART 9); AND DETERMINING AND CERTIFYING THAT THE ORDINANCE IS EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT On November 19, 2025, the Laguna Woods City Council approved second reading and adopted Ordinance No. 25-07 – read by title with further reading waived – titled: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LAGUNA WOODS, CALIFORNIA, AMENDING TITLE 10 (BUILDINGS AND CONSTRUCTION) OF THE LAGUNA WOODS MUNICIPAL CODE TO ADOPT CERTAIN AMENDMENTS, ADDITIONS, AND DELETIONS TO THE 2025 CALIFORNIA WILDLAND-URBAN INTERFACE CODE (CALIFORNIA CODE OF REGULATIONS, TITLE 24, PART 7); AND DETERMINING AND CERTIFYING THAT THE ORDINANCE IS EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT The ordinances amend Laguna Woods Municipal Code, Title 10 (Buildings and Construction) and adopt by reference the 2025 Edition of the California Building Standards Code (California Code of Regulations, Title 24), consisting of the 2025 California Administrative Code, 2025 California Building Code, 2025 California Residential Code, 2025 California Electrical Code, 2025 California Mechanical Code, 2025 California Plumbing Code, 2025 California Energy Code, 2025 Wildland-Urban Interface Code, 2025 California Historical Building Code, 2025 California Fire Code, 2025 California Existing Building Code, 2025 California Green Building Standards Code (also referred to as CALGreen), and 2025 California Referenced Standards Code, together with certain amendments, additions, and deletions thereto. The ordinances confirm the City’s compliance with the provisions of California Code of Regulations, Title 24; clarify and enhance ease of use and application of Laguna Woods Municipal Code, Title 10, both for internal parties and the public; and, adopt local amendments to the 2025 California Fire Code and 2025 Wildland-Urban Interface Code to decrease the potential incidence of property damage, injury, and death due to fires and earthquakes, in a manner that is reasonable and necessary to mitigate local climatic, geological, or topographical conditions. The effective date of the ordinances is January 1, 2026.

Similar Contracts

Same NAICS industry code

NAICS: 541350
New
SLED
RFQ 26-019/KKJ Professional Construction Inspection and Materials Testing Services
Solicitation # RFQ 26-019/KKJ
Jefferson County Drainage District No. 6 is soliciting qualifications for Professional Construction Inspection and Materials Testing Services for the Corley Diversion Project, with submissions due by 2:00 PM Central Standard Time on August 27, 2026. The project is federally funded through the U.S. Department of Housing and Urban Development via the Texas General Land Office under contract #24-065-004-E161 and is subject to all regulations governing the CDBG Regional Mitigation Program, including compliance with the Davis-Bacon Act, Fair Labor Standards, Equal Employment Opportunity, Affirmative Action, and Section 3 of the HUD Act of 1968. Contractors must ensure non-discrimination based on race, color, religion, sex, sexual identity, gender identity, or national origin and are required to engage small, minority, and disadvantaged businesses. Interested firms must obtain the Request for Qualifications packet from the District’s website or by email and submit one original and three copies of their qualifications by the deadline; electronic submissions are not accepted. All responses must be delivered in a sealed envelope clearly labeled with the solicitation number RFQ26-019/KKJ to the District’s office in Beaumont, Texas, and will be publicly opened at the designated time and place. Only the names of firms submitting qualifications will be announced during the public opening. All contractors must maintain an active System for Award Management registration and must not be debarred or suspended from federal programs. Questions must be submitted in writing to the Chief Business Officer by August 21, 2026, at 1:00 PM CST, and the District reserves the right to accept or reject any submission and to waive minor irregularities in the interest of the public good.
JEFFERSON COUNTY DRAINAGE DISTRICT NO. 6

POSTED

about 16 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541350
New
Federal
Fire Protection (Maintenance)
Solicitation # FY26R3281011
The U.S. Section, International Boundary and Water Commission is seeking a small business to perform annual inspection and maintenance services for 38 fire extinguishers at the Nogales Field Office in Rio Rico, Arizona. The contract is a Firm-Fixed-Price award structured as a 100% Small Business Set-Aside, with only eligible small businesses allowed to submit offers. Work must ensure all extinguishers are fully charged, accessible, compliant with safety standards, and operational to protect personnel and property. Offerors must submit detailed work plans and pricing for both the base year and all option years via email to adrian.knights@ibwc.gov before the September 3, 2026 deadline. Site visits are not mandatory but strongly recommended and must be scheduled through the POC. All proposals must include a valid Unique Entity Identifier and comply with applicable FAR clauses related to commercial services, payment processing, identity verification, environmental restrictions, and telecommunications prohibitions. Payment will be processed electronically through the Invoice Processing Platform, a secure system provided by the U.S. Department of the Treasury, and contractors must adhere to electronic invoicing requirements. Evaluation will prioritize technical acceptability, the quality of the proposed approach, and past performance, with awards made based on the most advantageous offer considering price and non-price factors. The Government retains the right to cancel the solicitation at any time without obligation to reimburse offerors for incurred costs. The contracting office is located in El Paso, Texas, but performance is exclusively at the Rio Rico, Arizona site. Offerors must confirm compliance with all representations and certifications outlined in the FAR, including those related to System for Award Management, accelerated payments for small businesses, and protection of government assets. Questions must be submitted via email before August 31, 2026, and only those received through this method will be addressed.
Internat Boundary And Water Commission

POSTED

1 day ago

DEADLINE

in 26 days
View Details
NAICS: 541350
New
SLED
1st Reading of an Ordinance to amend portions of chapter 30 (places of historical and architectural significance) of the santa ana municipal code relating toThe City of Santa Ana is proposing amendments to Chapter 30 of its Municipal Code to strengthen oversight and procedures regarding historic properties, focusing on modifications, demolition by neglect, and transfer disclosures. The changes aim to enhance the protection of historically and architecturally significant structures by clarifying requirements for property owners seeking to alter or dismantle such buildings, ensuring that neglect leading to deterioration is addressed proactively, and mandating transparent disclosure of a property’s historic status during sales or transfers. These updates are designed to align local practices with broader preservation goals and to provide clearer guidelines for both property owners and city staff. The ordinance, labeled OA No. 2026-01, will also include administrative adjustments to improve efficiency in permitting, review processes, and enforcement related to historic resources. It is currently in the first reading phase with the City Council, and the proposed changes are expected to bolster regulatory consistency and public accountability. The primary point of contact for inquiries is Pedro Gomez, Principal Planner, with additional support available through the City’s Planning Department. The initiative reflects a broader commitment to preserving Santa Ana’s cultural heritage while adapting regulatory frameworks to contemporary needs.
City of Santa Ana

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 541350
New
SLED
GEOTECHNICAL, GEOLOGICAL AND CONSTRUCTION QA/QC SERVICES
Solicitation # WMARC-492
The County of Riverside, through its Department of Waste Resources, is soliciting proposals for geological, geotechnical, and construction quality assurance and quality control services for the Phase 2, Stage 2 Liner Expansion Project at the Badlands Sanitary Landfill. This project aims to expand the landfill’s disposal area by approximately 23 acres in compliance with Title 27 of the California Code of Regulations and Subtitle D of the Code of Federal Regulations. In addition to the new liner construction, two earthen stockpiles are planned, including the Cycle Park Stockpile near the unstable Reduced Cycle Park Stockpile 1, which experienced a slope failure after construction was halted in December 2023. The scope of work includes detailed analysis of the slope failure and recommendations for stabilization due to the proximity of the failing stockpile to a public road and the adjacent Cycle Park Stockpile. The County’s engineering staff will oversee design and contract documentation, while the selected consultant must ensure full compliance with California Labor Code prevailing wage requirements for public works projects, as outlined in specific sections of the Labor Code and referenced in Attachment A of the RFP. Proposals must be submitted electronically via PublicPurchase.com by September 3, 2026, at 1:30 p.m. Pacific Time, following a mandatory pre-bid meeting on August 20, 2026, at the landfill site in Moreno Valley. Bidders are required to submit questions by August 24, 2026, and must structure their proposals so that Services A through C and Service D can be evaluated independently, as the County reserves the right to award these as separate contracts or as a single contract to one firm. The tentative award date is between 60 and 120 days after the evaluation concludes, with the goal of having agreements finalized by October 31, 2026, although contract negotiations may extend beyond this timeline. All information regarding the award process will be posted exclusively on the County’s Purchasing website, and bidders are responsible for monitoring these sites for updates. Compliance with all applicable state labor and public works regulations is mandatory throughout the contract term.
County of Riverside

POSTED

2 days ago

DEADLINE

in 26 days
View Details