Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Facility Condition Assessment and Asset Management Solution

Active
2026-RFP-00266State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of San Mateo, through its Department of Public Works, is soliciting a turnkey solution for a Facility Condition Assessment (FCA) and Asset Management project under solicitation 2026-RFP-00266. The project involves performing baseline FCAs for approximately 100 facilities covering 4.5 million gross square feet across 75 sites, divided into three operational zones including general government facilities and high-compliance healthcare environments. The selected contractor will be responsible for conducting physical walk-throughs per ASTM E2018-24 standards, performing nameplate inventories, and installing durable 2D barcode tags on approximately 12,000 assets. Key deliverables include the creation of a unified Master Equipment Register (MER), the deployment of a cloud-based Facility Condition Information System (FCIS) with US-based data residency, and the implementation of bi-directional integration with the County's IBM Maximo Application Suite SaaS. The contract is scheduled for award on February 23, 2027, with a project kick-off on March 8, 2027. Proposers must demonstrate at least five years of experience in FCAs and capital planning software within the last eight years and must be registered with the System for Award Management (SAM). Evaluation is based on overall best value, with preferential scoring available for local, small, and micro businesses or non-profits. Compliance requirements include adherence to San Mateo County regional prevailing wage rates, ADA and Title 24 accessibility standards, and HIPAA regulations for the protection of electronic protected health information. The scope specifically requires physical inspections of critical infrastructure such as mechanical rooms, electrical substations, and rooftops using high-durability anodized aluminum or metal-photopolymer tags.

General Info

San Mateo County seeks a turnkey facility condition assessment and asset management solution.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

10
PDF, High priority: read this first25 pages · rfp
High
XLS, High priority: read this firstspecifications
High
XLS, High priority: read this firstspecifications
High
XLSX, High priority: read this firstspecifications
High
XLSX, High priority: read this firstspecifications
High
XLSX, High priority: read this firstspecifications
High
XLSX, High priority: read this firstspecifications
High
XLSX, High priority: read this firstspecifications
High
DOCX, High priority: read this first20 pages · contract-document
High
DOCX, High priority: read this first20 pages · contract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works - Capital Projects
Contacts2 people available
OfficeRedwood City, CA, 94063, USA
Office AddressRedwood City, CA, 94063, USA
Contacts
Mario NastariCapital Programs Manager
Roxanne MaquinanaProgram Services Manager

Interested Companies (2)

BidamericaSheridan, WY
Arsenio Ortega, PEFremont, CA

Full Description

Show more
The County of San Mateo (the "County" or "SMC") covers approximately 744 square miles on the San Francisco Peninsula, serving nearly 800,000 residents across 20 incorporated cities and extensive unincorporated areas. The County delivers regional services including healthcare, public safety, justice administration, social services, and environmental protection. The Department of Public Works plans, designs, constructs, operates, and maintains County-owned facilities and critical infrastructure. The Department operates with an annual budget of approximately $200 million and over 300 employees across five operational divisions: Administrative Services, Airports (San Carlos and Half Moon Bay), Engineering and Resource Protection, Facilities and Capital Projects, and Road Services. The County's Facilities Services portfolio is operationally divided into three distinct zones: Zone 1 - Facilities, Maintenance & Operations (FM&O): Central County administration complexes, justice facilities, courthouses, homeless shelters and hotels, parking structure and lots, and operational yards. Zone 2 - Health & Hospital System (H&H): San Mateo Medical Center, acute-care hospitals, behavioral health facilities, and outpatient medical clinics subject to stringent OSHPD/HCAI, CDPH, and Joint Commission compliance. Zone 3 (FM&O): North, South, and Coastside regional clinics, libraries, correctional facilities, community centers, homeless shelters and hotels, parking structure and lots, and operational depots.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
TxDOT Aviation Division- Notice to Consultants
Solicitation # RFQ26ALPAMPA00021
The Texas Department of Transportation Aviation Division has issued solicitation RFQ26ALPAMPA00021 for professional services to support Perry Lefors Field in Gray County. The project scope involves updating the Airport Layout Plan (ALP) with a narrative and conducting an 18B Obstruction Survey. The work is structured into four phases: a kick-off phase for goal setting and strategic planning, Phase I for aviation demand forecasts and design standards, Phase II for facility and land use alternatives including RSA evaluations, and Phase III for the development of a Capital Improvement Plan and the final ALP update. All deliverables must comply with the latest Federal Aviation Administration Master Plan Advisory Circular, specifically Standard Operating Procedures 2.0, 3.0, and 8.0. Interested firms must submit a Qualifications Statement of no more than nine pages via the TxDOT Aviation eGrants system by December 2, 2026, at 2:00 PM CST. Selection is based on a scoring system weighted equally across four categories: capability and personnel, recent experience within the last ten years, performance and reliability, and the proposed technical approach and schedule. Respondents must provide a project schedule measured in weeks and include mandatory certifications regarding the 2019 and 2021 National Defense Authorization Acts and the U.S. Department of Commerce's foreign adversaries list. The top-rated firm will be selected by a committee of local government representatives and will subsequently enter fee negotiations to establish a professional services agreement.
Texas Department of Transportation

POSTED

about 3 hours ago

DEADLINE

in 29 days
View Details
NAICS: 541330
New
SLED
Cooper City Stormwater Master Plan (H1470 | 4673-305-P14)
Solicitation # RFQ2026-2
The City of Cooper City is soliciting proposals under RFQ2026-2 for the development of a comprehensive Stormwater Master Plan (SWMP) covering approximately 8.5 square miles. Funded by the FEMA Hazard Mitigation Grant Program (HMGP), the project aims to identify flood-risk areas, assess water-quality practices, and improve the community's National Flood Insurance Program Community Rating System score to increase overall flood resiliency. The scope of work is divided into two primary tasks: the creation of a preliminary SWMP based on initial flood modeling and the finalization of a completed SWMP for adoption into the Local Mitigation Strategy. The total estimated contract value is 281,000 dollars, with a period of performance extending from the date of execution through May 31, 2028. Proposals must be submitted electronically via the OpenGov portal by November 30, 2026, and must include a completed Standard Form 330 and various federal affidavits. Evaluation is conducted through a two-tier points-based system focusing on past experience, project approach, and technical capabilities. The selected consultant must adhere to strict regulatory standards, including the Davis-Bacon Act for prevailing wages, ADA compliance, and Florida Statutes regarding scrutinized companies. Contract administration includes progress billings with a 45-day payment term, and the final agreement will include clauses for termination for convenience and specific insurance requirements.
Utilities

POSTED

about 5 hours ago

DEADLINE

in 27 days
View Details
NAICS: 541330
New
SLED
2027-2030 On-Call Engineering and Professional Services
Solicitation # 49733
The City of San Rafael is soliciting Statements of Qualifications from consultants and contractors to provide on-call engineering and professional services across a wide array of disciplines, including civil, structural, electrical, environmental, architectural, and transportation services. The city intends to establish a shortlist of up to five firms per discipline to be eligible for work assignments. The resulting contracts will be structured as Service Level Agreements with an effective date of July 1, 2027, and a primary term of three years ending June 30, 2030, with an option for a one-year extension. Work will be assigned and managed through individual Task Orders, which will define the specific scope, schedules, and compensation based on either fixed fees or hourly rates. Eligible firms must maintain a principal office in the San Francisco Bay Area and adhere to strict compliance requirements, including obtaining a San Rafael business license and complying with California Labor Code and Government Code sections regarding workers' compensation and conflicts of interest. Selected contractors must provide comprehensive insurance coverage, including employer's liability of at least one million dollars and specific endorsements naming the city as an additional insured. Submittals are due by November 19, 2026, via Bid Express and must include a cover letter accepting the Service Level Agreement as-is, professional resumes, and a history of contract terminations or litigation from the past five years. Evaluation is based on a 100-point ranking system.
City of San Rafael

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Public Works - Capital Projects

Same awarding agency

NAICS: 236220
New
SLED
County Office Building 1 Renovation and Modernization Work Package 2 (WP2) Project (Project No. P33Z1)
Solicitation # 2027-RFP-00118
The County of San Mateo Public Works Department is soliciting proposals for the County Office Building 1 Renovation and Modernization Work Package 2 (Project No. P33Z1) located at 455 County Center in Redwood City, California. This project involves the interior remodel of all of Level 2 and a portion of Level 1, encompassing the construction of non-load bearing partitions, suspended acoustic ceilings, lighting, finishes, and remodeled restrooms. The scope also includes comprehensive upgrades to mechanical, electrical, and plumbing systems, the installation of fire suppression and fire alarm systems, and the modernization of the existing Siemens fire alarm system. The engineer's estimate for the project is between 13 million and 15 million dollars, with the contract intended to be awarded to the lowest responsive and responsible bidder. The project is subject to a strict timeline with an anticipated notice to proceed on December 8, 2026, and an overall completion period of 204 calendar days. A critical milestone requires all work on or impacting Level 1 to be finished by May 9, 2027. Contractors must be Class B General Contractors, registered with the Department of Industrial Relations, and maintain a staffed office within San Mateo County or within 55 miles of the project site. Due to the presence of asbestos, lead-based paint, and PCBs identified in hazardous materials surveys, all abatement must be performed by licensed professionals in compliance with Cal/OSHA and BAAQMD standards. Contractual requirements include adherence to a Project Labor Agreement, payment of California prevailing wages, and the mandatory use of Procore for project management. Bidders must provide a bid bond of at least 10 percent of the base bid, and the successful awardee will be required to provide 100 percent payment and performance bonds. Proposals must be submitted electronically via the eProcurement portal by November 18, 2026.
Commercial and Institutional Building Construction

POSTED

about 5 hours ago

DEADLINE

in 15 days
View Details
New
SLED
Mechanical Work/HVAC Job Order Contracts (JOC 2707-2709) - Class C20 License
Solicitation # 2027-RFP-00199
The County of San Mateo, through its Public Works Capital Projects department, is soliciting proposals under RFP 2027-RFP-00199 for Mechanical Work and HVAC Job Order Contracts (JOC 2707-2709). This solicitation seeks up to three qualified contractors holding a Class C20 License to provide all necessary labor, materials, tools, and equipment for various construction tasks across different County facilities. Each agreement carries a maximum individual term of one year with an aggregate fiscal obligation not to exceed 5,000,000 dollars per contract. Work is assigned via separate Job Order Notices to Proceed, all of which must be issued within one calendar year of the contract commencement date, though the contracts remain active until the specific work under those orders is completed. Award of the contract is based on the lowest bidder, determined by an Evaluation Criteria Figure calculated to four decimal places using weighted adjustment factors. Selected contractors must provide performance and payment bonds with an initial amount of 1,000,000 dollars, ensuring that the sum of outstanding Job Orders never exceeds the bond limit. The contract is subject to California Department of Industrial Relations prevailing wage laws and requires strict adherence to Equal Employment Opportunity and non-discrimination certifications. Proposals must be submitted electronically via the OpenGov procurement portal by 2:00 pm on December 10, 2026, following specific formatting guidelines including 12-point Times New Roman font and one-inch margins. Final acceptance of work is determined by the County upon verification that all tasks, warranties, and training requirements have been fully met.

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 238320
New
SLED
Painting Job Order Contracts (JOC 2718 and 2719) - Class C33 License
Solicitation # 2027-RFP-00203
The County of San Mateo Public Works Capital Projects division is soliciting proposals for Painting Job Order Contracts (JOC 2718 and 2719) under solicitation 2027-RFP-00203. This one-year agreement is open to contractors holding an active C33 license. The contract utilizes a Job Order format where specific construction tasks are defined through joint scope meetings and priced using the Gordian Construction Task Catalog with fixed unit prices. Award selection is based on the lowest responsive and responsible bidder, determined by an Evaluation Criteria Figure (ECF) that weights various facility types, including general, detention, and HCAI facilities, as well as PLA compliance. Performance involves executing a variety of projects across different locations in California, adhering to OSHA safety standards and prevailing wage rates. Contractors must provide performance and payment bonds based on an initial contract amount of 1 million dollars. Technical requirements include strict adherence to Gordian Technical Specifications and CSI Divisions 01-09, with specific mandates for the packaging, labeling, and storage of materials, particularly hazardous or asbestos-containing waste. Payment is structured as a single payment for job orders under 25,000 dollars or 45 days in duration, while larger projects may receive partial monthly progress payments. Proposals must be submitted electronically via the OpenGov portal by December 10, 2026.
Painting and Wall Covering Contractors

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS