Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on August 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

249E Road Surfacing & Stabilization - Apache-Sitgreaves NF, AZ

Closed
127EAX26Q0071Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 11 hours ago

DEADLINE

in about 17 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 11 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 12 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation 127EAX26Q0071 is a total small business set-aside for the Department of Agriculture, specifically the USDA Forest Service, to perform road surfacing and stabilization on NFSR 249E within the Apache-Sitgreaves National Forest in Arizona. The project involves reestablishing the road template and placing a 4-inch lift of aggregate base material totaling 12,617 tons, followed by stabilization using 68,276 gallons of a ligninsulphonate/magnesium chloride blend over approximately 5.29 miles. Work begins at the intersection of AZ-273 and NFSR 116 and includes turnouts and parking areas between South Cove and Railroad Cove. The contractor must adhere to FP-14 standard specifications, the Industrial Fire Plan, and prevailing wage rates as defined in Wage Determination AZ20260023 Mod 1. The contract is anticipated to be a firm-fixed-price award, with performance beginning within 10 calendar days of the notice to proceed and completion required within 90 calendar days. Award will be based on the highest technical rating, provided the price is fair and reasonable and past performance is acceptable or neutral. Evaluation factors include the contractor's tools, equipment, and business practices, their capability in roadway grading and shaping, and their expertise with lignin blend stabilization products. Performance and payment bonds are required. Proposals must be submitted via email to the contract specialist by September 3, 2026, at 1400 local time.

General Info

Small business contract to reconstruct 5.29 miles of road in Arizona, due September 3, 2026.

Contract Value

$925,443.67

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Springerville, AZ, 85938, USA

Set-Aside

SBA

Award Issued Date

Documents

12

127EAX26Q0071 RFI Log - 249E Road Surfacing and Stabilization

DOCX, High priority: read this first3 pages · q-and-a
High

12EAX26Q0071 Amendment 0001

PDF, High priority: read this first1 page · amendment
High

C04 Attachment 7 Fire Plan - Apache-Sitgreaves National Forests

PDF, High priority: read this first9 pages · sow
High

Forest Service Supplemental Specifications to FP-14

DOCX, High priority: read this first37 pages · specifications
High

IFB 127EAX26Q0071 Road Surfacing and Stabilization Apache-Sitgreaves NF

PDF, High priority: read this first21 pages · ifb
High

NFSR 116 Aggregate Specifications Exhibit 5

PDF, High priority: read this first1 page · specifications
High

NFSR 249E Road Reconditioning Statement of Work

DOCX, High priority: read this first3 pages · sow
High

Schedule of Items for NFSR 249E Road Surfacing and Stabilization

PDF, High priority: read this first1 page · schedule-of-items
High

Section 31 05 16 - Aggregates for Earthwork Specifications

PDF, High priority: read this first11 pages · specifications
High

Wage Determination AZ20260023 Mod 1 for Arizona Highway Construction

PDF, High priority: read this first4 pages · wage-determination
High

BioPreferred Exhibit 2 (October 2010) Construction/Maintenance & Repair

PDF, Low priorityspecial-notice
Low

C04 Attachment 3 MAP

PDF, Low priority3 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Southwest 7 Usda-Fs
Contacts1 person available
OfficeAlbuquerque, NM, 871023498, USA
Office AddressAlbuquerque, NM, 871023498, USA
Contacts
Richard Ortega

Full Description

Show more

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.


Solicitation number 127EAX26Q0071 is issued as a Request for Quotation (RFQ) for reestablishing the road template on NFSR 249E. Placement shall include the turnouts and parking area between South Cove (NFSR 249F) and Railroad Cove (NFSR 249G). Placement shall begin at the pavement at AZ-273 and continue west for approximately 5.29 miles to the intersection with NFSR 116.


This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 - Highway, Street, and Bridge Construction. The small business size standard is $45.0M. This acquisition is a Total Small
Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.


Amendment 0001 - RFI Log 001-020 with answers

More opportunities from Department Of Agriculture → Csa Southwest 7 Usda-Fs

Same awarding agency

NAICS: 237310
New
Federal
Jake Rocks Road Reconstruction
Solicitation # 127EAX27Q0003
Solicitation 127EAX27Q0003 is a Request for Quotation issued by the USDA Forest Service for the Jake Rocks Road Reconstruction project in the Bradford Ranger District of the Allegheny National Forest, located in Warren, Pennsylvania. This total small business set-aside under NAICS 237310 requires a contractor to provide all equipment, labor, and materials to rehabilitate approximately 2.97 miles of designated roads, specifically Forest Road 492 and 492A, as well as two recreational parking areas, two overlook parking areas, and two pull-off areas. The scope of work includes milling and overlaying asphalt, full depth replacement and spot repairs, culvert removal and installation, ditch work, guide rail replacement, the installation of erosion and sedimentation controls, and the construction of accessibility features. All work must adhere to FP-14 Standard Specifications, Forest Service Supplemental Specifications, and MUTCD standards for signage. The contract period of performance runs from November 2, 2026, to September 30, 2027, with a delivery requirement of 135 days after the notice to proceed. Award will be based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, performance schedule, and a record of three similar projects completed within the last three years. Proposals must be submitted as separate PDF files via email to the designated points of contact by October 26, 2026, at 1:00 PM Eastern Time. Required submission documents include a signed SF1442, a priced Schedule of Items, a technical proposal, and a bid guarantee. The project is subject to the Davis-Bacon Act and requires compliance with Buy American requirements and specific environmental protocols, including the cleaning of equipment to prevent the spread of invasive species on Forest Service lands.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 236220
Federal
Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NF
Solicitation # 127EAX26Q0069
Solicitation 127EAX26Q0069 is a total small business set-aside request for quotation issued by the USDA Forest Service for a turnkey restoration of lookout towers within the Pecos Las Vegas and Coyote Ranger Districts of the Santa Fe National Forest. The base bid requires the design, removal, and replacement of the Barillas Peak Lookout Tower cab, including the installation of a new comprehensive lightning protection system and an off-grid solar power system with a backup generator. An optional bid item is available for the installation of a similar lightning protection and solar power system at the Encino Vista Lookout Tower. The project involves a five-phase design process, structural upgrades, and site civil work, with a total period of performance of 548 days after the notice to proceed. The acquisition is governed by FAR Part 12 for commercial items and requires compliance with the Davis-Bacon Act, Buy American requirements, and NFPA 70 and 780 standards for electrical and lightning protection. Offerors must provide a 20 percent bid bond and demonstrate technical competence through NEC and state-approved commercial electric certifications. Award will be based on best value, specifically the highest technically rated offeror with a fair and reasonable price and acceptable past performance. Following amendment 00001, the request for information due date is October 19, 2026, and the final quote submission deadline is November 6, 2026, at 2:00 PM Pacific Time.
Commercial and Institutional Building Construction

POSTED

13 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS