Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on December 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26044 Train Station Basin BMP Improvements

Closed
26044-JSState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 13 days

General Info

Documents

1
PDF, High priority: read this first161 pages · ifb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 15 days
  • Lift Station No. 85 ReplacementOpen now, due in 26 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → City of Suffolk
ContactsNo contacts available
OfficeN/A
Organization / AgencyVirginia → City of Suffolk
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The City seeks to install 8 ft downstream hydrodynamic separator

More opportunities from Virginia → City of Suffolk

Same awarding agency

NAICS: 237310
SLED
Contractor Applied Pavement Markings
Solicitation # 27051-AG
The City of Suffolk is seeking to enter into an agreement with two vendors to provide all labor, equipment, and materials for the application of pavement markings and markers within the public right of way on an as-needed basis. The scope of work includes the application of Type B, Class 1, Alkyd permanent pavement line markings and non-preheated pre-formed thermoplastic materials, with a required thickness of 90 mils (+/- 5 mil). All materials and markers must conform to the latest VDOT Road and Bridge Specifications, and markings must align with the Manual of Uniform Traffic Control Devices. The contract begins January 1, 2027, and runs through December 31, 2027, with an option for four additional one-year renewals through December 31, 2031. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid amount. Qualified vendors must provide a painting crew including at least one VDOT certified pavement technician, and all flaggers must also be VDOT certified. Additionally, supervisors and crew leaders must complete intermediate-level Work Zone Traffic Control Training, while crew members must complete the basic level. Bidders are required to provide proof of comprehensive insurance, including general liability, automobile liability, and workers' compensation, and must maintain an A.M. Best rating of no less than A:VII. All work is subject to visual inspections and moisture testing, and the contractor must provide a 90-day warranty against defects in materials and workmanship.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 27 days
View Details
NAICS: 212321
SLED
IFB 27062-KR Washed Sand
Solicitation # 27062-KR
The City of Suffolk is seeking a contractor to furnish and deliver washed sand on an as-needed basis for the Department of Public Works Road Maintenance Division to support snow removal operations. The City anticipates a requirement of approximately 8,000 tons per year, though actual quantities will be determined by local weather conditions. The sand must be screened and washed to remove silt and clay and must conform to Virginia Department of Transportation specifications. Deliveries are required F.O.B. destination to four specific maintenance locations, with a mandatory 24-hour standard delivery response time and a requirement for the contractor to be available 24 hours a day, seven days a week. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid amount, with evaluations considering bidder capability, integrity, past performance, financial capacity, and technical compliance. Payment terms are Net 45 days, with options for payment via purchasing card or electronic transfer of funds. Contractors must maintain comprehensive insurance coverage, including general liability of $2,000,000 and umbrella liability of $2,000,000, and must provide proof of insurance 15 days before work begins. Bidders must submit their full bid package through EVA by December 2, 2026, including certifications for a drug-free workplace, non-discrimination, and authority to transact business in Virginia.
Construction Sand and Gravel Mining

POSTED

9 days ago

DEADLINE

in 14 days
View Details
NAICS: 541330
SLED
Engineering Services Bridge Inspections & Overweight Permits
Solicitation # 27040-AG
The City of Suffolk has issued solicitation RFP#27040-AG to secure a VDOT pre-qualified firm for an annual contract providing engineering services. The scope of work includes structural inspections of various bridges, traffic control device structures, and overhead signs, as well as the review of overweight vehicle permits. Bridge inspections must adhere to National Bridge Inspection Standards (NBIS) and VDOT requirements, including the use of non-destructive evaluation methods for fracture critical members and fatigue prone details. Additionally, the contractor may provide bridge repair design services, which are capped at 50,000 dollars per project. Proposals are evaluated based on four equally weighted criteria: the qualifications and experience of key personnel, the availability of support resources, the quality of prior work, and the proposed operational plan. The selection process involves a preliminary ranking to create a short-list, followed by interviews to determine the firm in the best interest of the City. Selected consultants must provide a Quality Assurance/Quality Control plan and certified inspectors familiar with FHWA and VDOT standards. Payment is issued within 45 days of service receipt or invoice rendering, with a maximum late payment interest rate of one percent per month. All proposals must be submitted electronically by December 2, 2026, and include certifications regarding minority business status, drug-free workplace compliance, and the absence of conflicts of interest.
Engineering Services

POSTED

13 days ago

DEADLINE

in 14 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS