3635 7th Avenue Storm Drain Emergency (Construction Change Order No. 2)

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
City Council approval to authorize Change Order No. 2 to Contract No. K-25-2351 -EMR-3 between the City of San Diego and Cass Arrieta to furnish additional labor, materials, and equipment necessary for the installation of temporary shoring to construct a reinforced concrete pipe storm drain. Failure to complete the repairs further increases the likelihood of injury and impacts on surrounding properties. The proposed work is the minimum necessary to ensure adequate operational capacity for public health and safety. All areas impacted by the emergency will be restored to their pre-impact condition to the extent feasible upon completion of work.

More opportunities from California → City of San Diego

Same awarding agency

NAICS: 611110
SLED
Avion Property
Solicitation # 1109086
The City of San Diego has issued a Conditional Use Permit for the construction of The Cambridge School, a private Pre-K through 12th grade campus located on a 6.52-acre site at the southwest corner of Camino Del Sur and Coyote Bush Drive. The development features a 182,868 square-foot three-story classroom building, a 10,904 square-foot one-story multipurpose building, and a track and sports field. Parking is provided via a semi-subterranean two-level structure containing 345 spaces and 41 surface spaces, totaling 386 parking spots. The project is situated within the Black Mountain Ranch Community Plan Area, specifically in the CC-4-5 base zone and the Urban Village Overlay Zone. Comprehensive environmental and technical evaluations have been conducted to ensure compliance with CEQA and local standards. Key assessments include a geotechnical investigation for site preparation, a Phase I Environmental Site Assessment identifying potential agricultural pesticide residues, and a hydrology report confirming that post-development runoff will not exceed pre-development rates. The project has undergone air quality, noise, and waste management analyses, as well as a local mobility and Vehicle Miles Traveled assessment. While the VMT assessment identified significant impacts, mitigation is planned through the City of San Diego Complete Communities: Mobility Choices Program. Additionally, the project includes paleontological monitoring to mitigate impacts on high-sensitivity resources.
Elementary and Secondary Schools

POSTED

14 days ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS