Civic Center Parkade Emergency
Forecast
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Documents
0No documents available
Documents will appear here when they are available.
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Get what you need to respond
No documents were posted with this contract.
- Buyer contactEmail and phone
- Original solicitationLink to the source posting
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
PhaseForecast
Posted
forecast
Organization & Contact Information
Show more
AgencyCalifornia → City of San Diego
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → City of San Diego
Office AddressN/A
Contacts
Jerry JakubauskasSenior Planner
Carrie PurcellDeputy Director
Full Description
Show more
A visual inspection of the of Evan V. Jones Parkade structure within the San Diego Civic Center revealed evidence of spalling concrete from the parking structure walls and drive aisles. It was determined that the spalling concrete resulted from water intrusion into the masonry that caused rebar to deteriorate and expand which resulted in cracks and eventual failure of the concrete. In addition, a recent vehicular accident cause damage to a segment of guardrail at the terrace level of the structure. The Parkade is currently in operation; however, the potential for addition spalling of concrete and absence of a guardrail segment poses an immediate threat to health and safety to vehicular traffic and pedestrians.
The project will repair or replace spalling concrete in areas impacted by water intrusion and the damaged guard rail. The project will also include an evaluation of the structure to identify additional failures and assess the remaining life of the structure. The structure is eligible for historical designation and all work has been
determined to be consistent with the U.S. Secretary of interior's Standards and Guidelines. The proposed work is the minimum necessary to ensure adequate operational capacity of the parking structure and ensure health and safety.
More opportunities from California → City of San Diego
Same awarding agency
Research this forecast and prepare for the solicitation
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
