AUTHORIZE THE USE OF CITY FORCES FOR FY2027 TRANSPORTATION MILL & PAVE CIP PROJECT (B27010)

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The proposed action involves City of San Diego City Council (City Council) approval of the use of City Forces to complete the FY2027 Transportation Mill & Pave Project and the expenditure of funds not to exceed $12,000,000.00 from CIP AID00005, Street Resurfacing and Reconstruction (B27010), FY2027 Transportation Mill & Pave) for City Forces work-related expenses. The planned street segments are outlined in Attachment A. Mill and pave treatments provide rehabilitation of the structural integrity of the existing street after damage has occurred, typically because of trench cuts for water, sewer, stormwater, and dry utility work impacting the street surface, or simply deterioration of the street over time. The milling and paving process involves the use of heavy machinery (i.e. cold planner) to grind and remove the top approximately 1.5 to 2 inches of existing asphalt, or deeper if needed. The milled surface is then swept and vacuumed to remove dust and debris. Once a clean surface has been established, an adhesive binder (i.e. tack coat) is applied. Finally, a fresh layer of hot-mix asphalt is laid down with a paving machine and compacted smoothly with heavy steamrollers to restore the original elevation and grade. All work would occur within the public right-of-way (paved streets) or previously disturbed nonsensitive areas only. Stormwater Best Management Practices (BMPs) to prevent non-stormwater discharges from entering the City's stormwater conveyance system, as well as Traffic Control Plans (TCPs), will be implemented throughout construction.

More opportunities from California → City of San Diego

Same awarding agency

NAICS: 611110
SLED
Avion Property
Solicitation # 1109086
The City of San Diego has issued a Conditional Use Permit for the construction of The Cambridge School, a private Pre-K through 12th grade campus located on a 6.52-acre site at the southwest corner of Camino Del Sur and Coyote Bush Drive. The development features a 182,868 square-foot three-story classroom building, a 10,904 square-foot one-story multipurpose building, and a track and sports field. Parking is provided via a semi-subterranean two-level structure containing 345 spaces and 41 surface spaces, totaling 386 parking spots. The project is situated within the Black Mountain Ranch Community Plan Area, specifically in the CC-4-5 base zone and the Urban Village Overlay Zone. Comprehensive environmental and technical evaluations have been conducted to ensure compliance with CEQA and local standards. Key assessments include a geotechnical investigation for site preparation, a Phase I Environmental Site Assessment identifying potential agricultural pesticide residues, and a hydrology report confirming that post-development runoff will not exceed pre-development rates. The project has undergone air quality, noise, and waste management analyses, as well as a local mobility and Vehicle Miles Traveled assessment. While the VMT assessment identified significant impacts, mitigation is planned through the City of San Diego Complete Communities: Mobility Choices Program. Additionally, the project includes paleontological monitoring to mitigate impacts on high-sensitivity resources.
Elementary and Secondary Schools

POSTED

14 days ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS