Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

42" Double Offset Butterfly Valve Manufacturer

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the manufacture and supply of five 42-inch, 250 psi, flange class F double offset butterfly valves for prime contractors working on NAPF facility projects. The manufacturer must fabricate the valves according to AWWA standards and ensure full mechanical compatibility with AUMA Actuator Model SA 14.2-FA 14. The scope of work includes comprehensive performance and leak testing, as well as the provision of a Certificate of Adequacy of Design and a Certificate of Local Field Service. Managed by Infrastructure Engineering in Texas, the contract requires the delivery of five fully assembled and tested valves. The solicitation was posted on September 1, 2026, with a response deadline of September 22, 2026. The project falls under NAICS code 332911.

General Info

Supply five 42-inch butterfly valves for NAPF projects per AWWA and AUMA standards.

Agency

Texas → Infrastructure EngineeringView Agency

NAICS

332911 - Industrial Valve ManufacturingView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-151.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RC3H Discharge Valves

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Infrastructure Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Infrastructure Engineering
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies five 42-inch, 250 psi, flange class F double offset butterfly valves for prime contractors on NAPF facility projects. Fabricates valves to AWWA standards, ensures mechanical compatibility with AUMA Actuator Model #SA 14.2-FA 14, and performs performance and leak testing. Provides Certificate of Adequacy of Design and Certificate of Local Field Service. Delivers five fully assembled and tested valves.

Similar Contracts

Same NAICS industry code

More opportunities from Texas → Infrastructure Engineering

Same awarding agency

NAICS: 237120
SLED
Cedar Creek Section 4 Pipeline Replacement and Cedar Creek Lake Pump Station Improvements
Solicitation # 26-088
The Cedar Creek Section 4 Pipeline Replacement and Cedar Creek Lake Pump Station Improvements project, solicitation number 26-088, involves extensive infrastructure upgrades managed by the Texas Infrastructure Engineering agency. The scope of work includes the demolition of 780 linear feet of existing PCCP header and yard piping and the installation of 885 linear feet of new header and yard piping to connect the pump station to a new 90 inch transmission main. Additionally, the project requires the installation of 42,298 linear feet of 90 inch welded steel pipe extending westward to a tie-in with the existing 72 inch main, the installation of two 72 inch venturi meters with vaults, and the plugging and grouting of 507 linear feet of existing PCCP. Further technical requirements include the demolition of electrical, safety, and instrumentation components in the former chemical feed rooms, the relocation of the caustic feed skid, and the integration of new low- and high-head caustic feed systems. The contract also specifies the installation of two monolithic isolation joints at the Ennis Booster Pump Station suction and discharge headers. Responses for this solicitation are due by September 21, 2026, with the primary point of contact being Damon Cunningham.
Oil and Gas Pipeline and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 15 days
View Details