Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Industrial Valve Coating and Lining Specialist

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Industrial Valve Coating and Lining Specialist subcontract involves providing shop-applied protective coatings and linings for prime contractors on NAPF facility projects. The scope of work includes surface preparation according to NAPF 500-03-05, the application of coating systems as specified in Table 09905-B, and the use of HVDC holiday testing to identify pinholes. Additionally, the contractor is responsible for applying rust preventive slush oil to all threaded holes and machined surfaces. Under the direction of Infrastructure Engineering in Texas, the selected provider must deliver certified test reports for all coated surfaces and holiday testing results. This opportunity is categorized under NAICS code 238320, with a response deadline of September 22, 2026.

General Info

Subcontract for industrial valve coating and lining services for NAPF facility projects.

Agency

Texas → Infrastructure EngineeringView Agency

NAICS

238320 - Painting and Wall Covering ContractorsView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-151.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RC3H Discharge Valves

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Infrastructure Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Infrastructure Engineering
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs shop-applied protective coatings and linings for prime contractors on NAPF facility projects. Prepares surfaces per NAPF 500-03-05, applies coating systems per Table 09905-B, and performs HVDC holiday testing to detect pinholes. Applies rust preventive slush oil to machined surfaces and threaded holes. Delivers certified test reports for holiday testing and coated surfaces.

Similar Contracts

Same NAICS industry code

More opportunities from Texas → Infrastructure Engineering

Same awarding agency

NAICS: 237120
SLED
Cedar Creek Section 4 Pipeline Replacement and Cedar Creek Lake Pump Station Improvements
Solicitation # 26-088
The Cedar Creek Section 4 Pipeline Replacement and Cedar Creek Lake Pump Station Improvements project, solicitation number 26-088, involves extensive infrastructure upgrades managed by the Texas Infrastructure Engineering agency. The scope of work includes the demolition of 780 linear feet of existing PCCP header and yard piping and the installation of 885 linear feet of new header and yard piping to connect the pump station to a new 90 inch transmission main. Additionally, the project requires the installation of 42,298 linear feet of 90 inch welded steel pipe extending westward to a tie-in with the existing 72 inch main, the installation of two 72 inch venturi meters with vaults, and the plugging and grouting of 507 linear feet of existing PCCP. Further technical requirements include the demolition of electrical, safety, and instrumentation components in the former chemical feed rooms, the relocation of the caustic feed skid, and the integration of new low- and high-head caustic feed systems. The contract also specifies the installation of two monolithic isolation joints at the Ennis Booster Pump Station suction and discharge headers. Responses for this solicitation are due by September 21, 2026, with the primary point of contact being Damon Cunningham.
Oil and Gas Pipeline and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 15 days
View Details