Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Cedar Creek Section 4 Pipeline Replacement and Cedar Creek Lake Pump Station Improvements

Active
26-088State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cedar Creek Section 4 Pipeline Replacement and Cedar Creek Lake Pump Station Improvements project, solicitation number 26-088, involves extensive infrastructure upgrades managed by the Texas Infrastructure Engineering agency. The scope of work includes the demolition of 780 linear feet of existing PCCP header and yard piping and the installation of 885 linear feet of new header and yard piping to connect the pump station to a new 90 inch transmission main. Additionally, the project requires the installation of 42,298 linear feet of 90 inch welded steel pipe extending westward to a tie-in with the existing 72 inch main, the installation of two 72 inch venturi meters with vaults, and the plugging and grouting of 507 linear feet of existing PCCP. Further technical requirements include the demolition of electrical, safety, and instrumentation components in the former chemical feed rooms, the relocation of the caustic feed skid, and the integration of new low- and high-head caustic feed systems. The contract also specifies the installation of two monolithic isolation joints at the Ennis Booster Pump Station suction and discharge headers. Responses for this solicitation are due by September 21, 2026, with the primary point of contact being Damon Cunningham.

General Info

Texas Infrastructure Engineering pipeline replacement and pump station upgrades due September 21, 2026.

Agency

Texas → Infrastructure EngineeringView Agency

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Infrastructure Engineering
Contacts2 people available
OfficeFort Worth, TX, 76102, USA
Organization / Agency
Texas → Infrastructure Engineering
View Agency Profile
Office AddressFort Worth, TX, 76102, USA
Contacts
Damon CunninghamInfrastructure Integrity Project Coordinator

Interested Companies (35)

Show more
LP Sundance Construction
Thalle Construction
Hillsborough, NC
Reycon Partners
Fort lupton, CO

See All 35 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
PROJECT DESCRIPTION The work includes demolishing approximately 780 linear feet of existing PCCP header and yard piping connecting the pump station to the current 72 inch transmission main; installing about 885 linear feet of new header and yard piping with all associated structural, mechanical, and electrical components to connect the pump station to a proposed 90 inch transmission main; installing 42,298 linear feet of 90 inch welded steel pipe from the Cedar Creek Pump Station westward to a tie-in with the existing 72 inch main approximately 2,600 feet east of the Trinity River; installing two 72 inch venturi meters with vaults and appurtenances; plugging and grouting about 507 linear feet of existing 72 inch PCCP; demolishing all electrical, safety, and instrumentation components in the former chlorine, ammonia, and caustic feed rooms; relocating the caustic feed skid to a new caustic feed room; and installing and integrating new low- and high-head caustic feed systems with the existing infrastructure. The work also includes the installation of two (2) monolithic isolation joints and all incidental work at the Ennis Booster Pump Station suction and discharge headers.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
Alturas Wastewater Treatment Plant Improvement Project
Solicitation # EPIMS-MOD-63461-R1
The City of Alturas is undertaking infrastructure improvements to enhance its wastewater management system by installing a new pipeline that will transport raw wastewater to offsite treatment ponds and land application areas. To minimize environmental disruption, the project employs horizontal directional drilling beneath three water bodies—the North Fork Pit River, South Fork Pit River, and an unnamed ephemeral tributary—each requiring a bore approximately 3,000 feet in length at depths between 60 and 80 feet. This approach avoids direct excavation within streambeds and reduces impacts on aquatic habitats. The project has been authorized under a Lake and Streambed Alteration Agreement issued by the California Department of Fish and Wildlife, in compliance with Fish and Game Code section 1602, ensuring regulatory oversight and environmental safeguards are met during construction. The initiative is part of broader efforts to modernize Alturas’s wastewater infrastructure, promoting public health and environmental stewardship by diverting untreated effluent from local waterways. The City of Alturas serves as the project applicant and primary point of contact, with Warren Farnam listed as the primary planner and Dyana Judnick of the California Department of Fish and Wildlife serving as the environmental scientist overseeing regulatory compliance. The project was forecasted for future consideration on June 10, 2026, and all activities are confined to the city’s jurisdiction in Modoc County, California, with no federal funding or set-aside provisions identified. The alignment and drilling methodology reflect a commitment to minimizing surface disturbance while achieving functional wastewater conveyance goals.
City of Alturas

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
The U.S. Army Corps of Engineers, Japan District is preparing to solicit bids for the construction of a new 100,000-barrel cut-and-cover JP-8 bulk fuel storage tank at Yokota Air Base, Japan, under project title DESC2103C Phase II. The project includes the installation of a reinforced concrete pump house on top of the tank housing four 600-gpm issue pumps and one 50-gpm water draw-off pump, along with a high-level valve, independent level alarms, and a fully integrated automatic tank gauging system connected to the existing filter separator building’s control infrastructure. Additional components include piping, valves, vaults, a product saver tank, and a steel tank with a concrete outer wall and rolling cover for equipment access, all topped with a low-slope concrete roof featuring built-up roofing and overhangs. The total project value is estimated between ¥2.5 billion and ¥10 billion Japanese yen, classified under NAICS code 237120 for oil and gas pipeline and related structures construction. The contract will be awarded as a firm-fixed-price construction agreement using the Lowest Price Technically Acceptable source selection method. Only local sources physically located and licensed to perform construction in Japan are eligible to bid; U.S.-based contractors without local presence will not be considered. Offerors must hold a valid Japanese civil or architectural construction license, verifiable through the Ministry of Land, Infrastructure, Transport and Tourism’s website, and must be registered in both the System for Award Management (SAM) and as a Joint Venture entity if applicable. Solicitation is anticipated in August 2026 with proposals due by August 31, 2026, and all submissions must be made electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. All amendments and updates will be posted to SAM.gov and PIEE, and it is the offeror’s responsibility to monitor for changes. No United States Official Contractor status under the U.S.-Japan Status of Forces Agreement will be extended to contractors normally resident in the United States. Contract performance is required entirely within Japan, and compliance with all Japanese laws, labor standards, and regulations is mandatory.
W2SN Endist Japan

POSTED

2 days ago

DEADLINE

in 5 months
View Details