This Combined Synopsis/Solicitation opportunity from Department Of Veterans Affairs was posted on February 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

4310--Mechanical Equipment Replacement PARTS FOR CRAC 1,2,3 (VA-24-00032372)

Awarded
36C24124Q0249Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation (MTC) is soliciting bids for the installation of commercial-grade panic hardware on electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The scope of work includes conducting site surveys to verify door dimensions and fire ratings, procuring Grade I heavy-duty panic bars, exterior trim, rim cylinders, strikes, and door closers, and performing installation and testing. All work must adhere to NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and ADA standards. To ensure fail-safe operation, contractors must perform at least 10 consecutive cycle tests on all installed hardware. This is a fee-for-service subcontracting opportunity open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities under NAICS code 238290. Bidders must be licensed in the State of Idaho and provide three references for similar projects. Required submission documents include a completed bid sheet with lump sum and individual deficiency pricing, a W-9, a self-certification form, and acceptance of terms and conditions. All bids must be submitted via email to Sandra Clore by December 1, 2026, at 3:00pm MST. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wage rates and fringe benefits, as well as FAR clauses regarding Buy American preferences and combating trafficking in persons. Contractors are required to comply with DOL records management, mandatory training, and privacy breach notification requirements. Payment will be issued upon the submission of invoices for materials and services that have been delivered and accepted by MTC. Final inspection and acceptance will occur at the MTC designated point of delivery.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 238290
New
SLED
Kitchen Elevator Upgrade and Repair Service - NHSP-M
Solicitation # RFP NHDOC 2027-07
The New Hampshire Department of Corrections is soliciting proposals for a firm fixed price or not-to-exceed contract to provide comprehensive upgrades and repairs for a 1985 Dover Corporation passenger elevator at the New Hampshire State Prison for Men. The elevator, which serves two floors of the kitchen and has a 4,000-pound capacity, requires a new power unit including the motor, hydraulic valve, pump, oil reservoir, and muffler, as well as the installation of four security key switches and eight keys. All work must be performed by New Hampshire licensed professionals and comply with all local, state, and federal elevator codes, with final safety test results submitted to the New Hampshire Department of Labor. The project is expected to start in January, with a final completion deadline of June 30, 2027. Proposals are due by 2:00 PM EST on November 13, 2026, and must be submitted as separate sealed technical and cost proposals. Evaluation is based on a combined score of the technical proposal, which focuses on organizational experience, correctional facility expertise, and approach, and the cost proposal. Award selection may involve a Best and Final Offer process. Selected vendors must maintain significant insurance coverages, including commercial general liability of at least 1 million dollars per occurrence, and adhere to strict correctional facility security protocols, including tool inventories and compliance with PPD 371. Payment will be issued within 30 days of receiving approved monthly itemized invoices.
Department Of Corrections

POSTED

about 9 hours ago

DEADLINE

in 15 days
NAICS: 238290
New
Federal
Vertical Transportation Equipment (VTE) Maintenance, Repair, & Inspection Services
Solicitation # FA446027Q0005
Solicitation FA446027Q0005 is a non-personal services contract for the comprehensive management, maintenance, repair, and inspection of real property vertical transportation equipment (VTE) at Little Rock Air Force Base, Arkansas. The scope of work covers freight and passenger elevators, escalators, and potentially wheelchair lifts, dock levelers, and dumbwaiters. The contractor is required to maintain a VTE availability rate of 95 percent and adhere to strict response times, including in-person arrival for emergency calls within two hours and commencement of routine work within 24 hours. All services must comply with ASME A17.1, ANSI/ASME A17.2, and other applicable safety and fire protection standards. A written Maintenance Control Program must be delivered within 30 calendar days of the award. This is a total small business set-aside under NAICS code 238290. The government will award the contract to the responsible offeror based on a lowest-price technically acceptable sequence, where the lowest-priced offer is selected if they possess an acceptable past performance rating, defined as at least two years of similar experience within the last four years. Proposals are due by November 18, 2026, and must be submitted via email to the designated points of contact. Payment and invoicing will be processed through Wide Area WorkFlow (WAWF) by the 10th of each month. Access to the base requires a valid REAL ID, and a single site visit is scheduled for October 26, 2026, requiring an RSVP by October 22, 2026.
FA4460 19 Cons Pka

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 238290
New
Federal
N099--JLM Roll Up Door Replacement
Solicitation # 36C25627Q0092
Solicitation 36C25627Q0092 is a combined synopsis and request for quote issued by the Department of Veterans Affairs for the replacement of a motorized roll-up door at the John L. McClellan Veterans Hospital. This is a 100% set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238290. The project requires the contractor to provide all labor, tools, and equipment, including a scissor lift and forklift, to remove and dispose of the existing door and install one grey 7 by 9 foot motorized rolling steel rapid slat door with insulated slats and an obstruction safety device. The award will be a firm-fixed-price contract with a performance period of 30 days from the Notice to Proceed and includes a one-year warranty. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation process, focusing on technical capability, price reasonableness, and the completion of the VA Notice of Limitations on Subcontracting. Interested offerors must submit a three-volume quote package consisting of technical capabilities, a completed price schedule, and the required VAAR certification. Quotes must be emailed to Joseph Warren by 3:00 PM CST on November 18, 2026. A site visit is scheduled for November 6, 2026, at 10:00 AM, and all inquiries must be submitted by November 10, 2026. Performance will take place at the Central Arkansas Veterans Healthcare System in North Little Rock, Arkansas, and contractors must comply with all OSHA, ANSI, CAN, and UL standards.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 238290
New
Federal
J039--561A4-25-500 Elevator Repair Building 6 and 53
Solicitation # 36C24226R0097
Solicitation 36C24226R0097 is a Request for Proposal issued by the Department of Veterans Affairs for the emergency upgrade and modernization of four elevators at the VA New Jersey Healthcare System Lyons Campus, specifically targeting one passenger elevator in Building 6 and one service and two passenger elevators in Building 53. The scope of work requires the contractor to provide all labor, materials, and supervision to install non-proprietary microprocessor-based control systems, new geared machines, car operating panels with braille markings, hall fixtures at ADA compliant heights, and complete shaft wiring. All work must adhere to current safety codes, including fire recall features and door lock monitoring, and comply with the Davis-Bacon Act for prevailing wage rates. This procurement is a Service-Disabled Veteran-Owned Small Business set-aside under NAICS code 238290. To be eligible, the prime contractor must be a licensed elevator maintenance company with a full-time mechanic on staff and a clean safety record, certifying no more than three serious, one repeat, or one willful OSHA or EPA violation in the last three years. Proposals are evaluated based on technical capability, past performance, and price, with a requirement to submit a current Experience Modification Rate (EMR) and certifications for the Buy American Act and limitations on subcontracting. Following several extensions to accommodate requests for information, the final deadline for proposal submission is 1:00 PM on Thursday, October 29, 2026.
242-NETWORK Contract Office 02 (36C242)

POSTED

about 12 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Department of Veterans Affairs is soliciting quotes under RFQ 36C24124Q0249 for critical mechanical system repairs at the West Haven VA Medical Center in Connecticut. This project is a Service-Disabled Veteran-Owned Small Business set-aside under NAICS code 238290. The scope of work involves replacing the head pressure control on Compressor 1 of CRAC 1, the compressor in the Liebert Unit, and the relief valve on Compressor 2 of CRAC 3, all located in Building 1 Room SG105. These repairs are essential to maintain daily operations and protect critical infrastructure necessary for patient care. The contract specifies a period of performance of 60 calendar days from the Notice to Proceed. To be eligible, bidders must have a field service representative located within 200 miles of the West Haven and Newington campuses who is factory certified and trained by the Original Equipment Manufacturer for the specific equipment. The awarded contractor is responsible for providing all labor, materials, and supervision, while adhering to strict safety, quality control, and infection prevention measures, including HEPA filtration and dust control. All personnel must comply with VA security protocols, vaccination and tuberculosis testing requirements, and OSHA certification standards.

General Info

Contract Value

$19,225

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

VAMC West Haven 950 Campbell Ave, West Haven, CT, 06516, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

1

RFQ 36C24124Q0249 - Mechanical Equipment Replacement PARTS FOR CRAC 1,2,3

DOCX, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
Contacts1 person available
OfficeTOGUS, ME, 04330, USA
Office AddressTOGUS, ME, 04330, USA
Contacts
Nathan LangoneContract Specialist

Full Description

Show more
Combined Synopsis-Solicitation for Commercial Products and Commercial Services Revision 01 Effective: 05/30/2023 Description This is a combined synopsis/solicitation for commercial products and services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as RFQ 36C24124Q0249. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2023-03. The associated North American Industrial Classification System (NAICS) code for this procurement is NAICS 238290 (Other Building Equipment Contractors) size standard $22 million. This is being bid as a SDVOSB set-aside. The VAMC West Haven 950 Campbell Ave West Haven, CT 06516 is seeking to identify any vendor capable of providing VAMC West Haven with Mechanical systems repairs in Building 1 servicing critical infrastructure. They have been diagnosed and in need of the following repairs: Replacement of the head pressure control on Compressor 1 of CRAC #1 located in Building 1 Room SG105. Replacement of the compressor in the Liebert Unit located in Building 1 Room SG105. Replacement of the relief valve on Compressor 2 of CRAC #3 in Building 1 Room SG105. All interested companies shall provide quotations for the following: Statement of Work BACKGROUND Mechanical systems in Building 1 servicing critical infrastructure have been diagnosed and in need of repairs as follows: Replacement of the head pressure control on Compressor 1 of CRAC #1 located in Building 1 Room SG105. Replacement of the compressor in the Liebert Unit located in Building 1 Room SG105. Replacement of the relief valve on Compressor 2 of CRAC #3 in Building 1 Room SG105. JUSTIFICATION Replacement of mechanical equipment is needed to maintain daily operations and protect critical infrastructure needed to continue to provide patient care. PLACE OF PERFORMANCE The place of performance for this contract is VA Connecticut Healthcare System, West Haven VA Medical Center located at 950 Campbell Avenue, West Haven, CT 06516. PERIOD OF PERFORMANCE The Contract Time Period of Performance will be 60 calendar days from Notice to Proceed (NTP) and includes contractor closeout. QUALIFICATIONS To be considered eligible for consideration, potential bidders shall have a field service representative located within 200 miles of the West Haven and Newington Campuses of the VA Connecticut Healthcare System and have been trained by the Original Equipment Manufacturer (OEM) on the specific model of equipment that he/she is being asked to provide services for. Bidders shall provide upon request, documentation of factory certified service/maintenance training on the specific equipment under the terms of this contract. The Contracting Officer and/or Contracting Officer s Representative (COR) specifically reserve the right to reject any of the Contractor s personnel and refuse them permission to work on the equipment outlined herein, based upon credentials provided. SCOPE OF WORK The scope of this work includes the replacement of mechanical system parts including compressor head pressure control, compressor, and compressor relief valve. The awarded contractor shall furnish al materials, equipment, supervision, and personnel necessary to accomplish the project as indicated. Work shall occur during regular business hours between 7:00 a.m. 4:30 p.m. or as coordinated. Objectives: The project will include but not be limited to the following: Contractor shall furnish appropriate tools, equipment, and labor to replace the head pressure control on compressor 1 of CRAC #1 located in Building 1 Room SG105. Contractor shall furnish appropriate tools and equipment to replace the compressor in the Liebert Unit located in Building 1 Room SG105. Contractor shall furnish appropriate tools and equipment to replace the relief valve on compressor 2 of CRAC #3 located in Building 1 Room SG105. Protect all equipment in place during replacement activities. All contractor personnel, sub-contractors and representatives visiting VA sites will be required to sign in upon arrival at Building 15 and/or retain a temporary VA badge. Each visiting individual be required to enter their name, their company s name, VA project title, reason for visit, and the times of arrival and departure. Arrangements for after normal hour working site visits must be made in advance and during normal working hours. General: The Contracting Officer reserves the right to terminate any construction period services, without payment for services completed, if such services are not needed or are not being adequately completed. Approved Plans and Permits: Prior to the start of construction, submit to VA copies of all required permits. Site Visits: Day to day construction administration will be performed by the COR. Periodic reviews, tests, and other field observation by the Government are not to be interpreted as superintendence nor as resulting in any approval of the contractor s apparent progress toward meeting the Government s objectives; but are intended to discover any information that the Contracting Officer may be able to call to the contractor s attention to prevent costly misdirection of effort. The contractor shall remain responsible for constructing, operating, and maintaining the site in full accordance if the requirements of this solicitation. The contractor shall provide VA with a copy of all inspection reports for inspections conducted by local, regional, and state code authorities from the start of construction through issuance of the certificate of occupancy or completion. The contractor shall develop and provide to the VA the following: Safety Plan: The contractor shall produce work in accordance with the latest editions of all applicable DVA guidelines (e.g. Construction Standards, Master Specifications, Standard Details, Special Design Criteria to meet Hospital Joint Commission (JCAHO) requirements), NFPA, Federal and State codes pertinent to the project scope. All construction personnel on site are required to obtain an Occupational Safety and Health Administration (OSHA) 10 hour construction certification, and the site competent person for the contractor must obtain an OSHA 30 hour construction certification. Prior to the start of construction, the specifications shall require the contractor to develop and submit such plans as required by the VA relating to Safety and Environmental Issues. These may include but are not limited to: Job Hazard Analysis and LOTO Quality Control Plan: A Quality Control Plan shall be implemented for identifying and specifying the appropriate standard forms for Quality Control Inspections that will become part of the overall plan. Per VA Directive 1805, smoking vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees. No photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time. Prior to commencing work onsite, all Service providers and provider personnel shall furnish proof of receipt of required COVID vaccinations and boosters in compliance with current VHA Directives. Prior to commencing work onsite, all Service providers and provider personnel shall furnish proof of receipt of required Tuberculosis testing in compliance with VHA Directive 1131(5), dated June 04, 2021. Parking for Service provider and its employees shall be in designated areas only. Service provider to coordinate with COR. The Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct. Execute work in such a manner as to reduce impacts with work being done by others. Billing: Provide COR with a report or statement of work completed and include statements with request for payment. Statement should include service completed and the date each service item was completed. Labor charges shall be billed hourly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report. Safety Codes / Certification / Licensing: Environmental abatement work, if necessary, is to be performed by Contractor under supervision and monitoring for the VA by a Certified Industrial Hygienist. The Contractor shall comply with all codes as described above, as well as codes customarily applied in VA construction jobs such as NFPA fire code, OSHA, VA Design Guides, etc. Labs used by the contractor shall be licensed as required by any applicable governing agencies, and their certifications and licenses shall be included in the reports. Travel: Contractor and/or subcontractors will travel from their place of business to the West Haven VAMC of the VA Connecticut Healthcare System. APPENDIX A INFECTION PREVENTION MEASURES A. Implement the requirements of VA Medical Center s Infection Control Risk Assessment (ICRA) team. ICRA Group may monitor dust, in the vicinity of the construction work, and require the Contractor to take corrective action immediately if the safe levels are exceeded. B. Establish and maintain a dust control program as part of the contractor s infection preventive measures in accordance with the guidelines provided by ICRA Group as specified here. Prior to start of work, prepare a plan detailing project-specific dust protection measures, including periodic status reports, and submit to Project Manager and Facility ICRA team for review for compliance with contract requirements in accordance with Section 01340, SAMPLES AND SHOP DRAWINGS. 1. All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center. C. Medical Center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality. In addition: 1. The Project Manager and VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the construction zone and in the patient-care rooms are appropriate for their settings. The requirement for negative air pressure in the construction zone shall depend on the location and type of activity. Upon notification, the contractor shall implement corrective measures to restore proper pressure differentials as needed. 2. In case of any problem, the medical center, along with assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source. D. In general, following preventive measures shall be adopted during construction to keep down dust and prevent mold. 1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by Resident Engineer. Blank off ducts and diffusers to prevent circulation of dust into occupied areas during construction. 2. Analyze each site during design to determine the effects of blocking HVAC ducts and their impact on existing air handling systems that must remain operational before initiating a dust control program. The method of capping ducts shall be dust tight and withstand airflow. 3. Construct anteroom to maintain negative airflow from clean area through anteroom and into work area where required. 4. High risk patient care areas may require additional measures like air locks, special signage, smoke and negative pressure alarms. 5. Identify these areas clearly on the drawings and work with Medical Center personnel to achieve desired level of isolation suited to the scope of risk involved. 6. Do not perform dust- producing tasks within occupied areas without the approval of the Project Manager. For construction in any areas that will remain jointly occupied by the medical Center and Contractor s workers, the Contractor shall: a. Provide dust proof fire-rated temporary drywall construction barriers to completely separate construction from the operational areas of the hospital in order to contain dirt debris and dust. Barriers shall be sealed and made presentable on hospital occupied side. Install a self-closing rated door in a metal frame, commensurate with the partition, to allow worker access. Maintain negative air at all times. A fire retardant polystyrene, 6-mil thick or greater plastic barrier meeting local fire codes may be used where dust control is the only hazard, and an agreement is reached with the Resident Engineer and Medical Center. b. HEPA filtration is required where the exhaust dust may reenter the breathing zone. Contractor shall verify that construction exhaust to exterior is not reintroduced to the medical center through intake vents, or building openings. Install HEPA (High Efficiency Particulate Accumulator) filter vacuum system rated at 95% capture of 0.3 microns including pollen, mold spores and dust particles. Insure continuous negative air pressures occurring within the work area. HEPA filters should have ASHRAE 85 or other pre-filter to extend the useful life of the HEPA. Provide both primary and secondary filtrations units. Exhaust hoses shall be heavy duty, flexible steel reinforced and exhausted so that dust is not reintroduced to the medical center. c. Adhesive Walk-off/Carpet Walk-off Mats, minimum 24 x 36 , shall be used at all Interior transitions from the construction area to occupied medical center area. These mats shall be changed as often as required to maintain clean work areas directly outside construction area at all times. d. Vacuum and wet mop all transition areas from construction to the occupied medical center at the end of each workday. Vacuum shall utilize HEPA filtration. Maintain surrounding area frequently. Remove debris as they are created. Transport these outside the construction area in containers with tightly fitting lids. e. The contractor shall not haul debris through patient-care areas without prior approval of the Resident Engineer and the Medical Center. When, approved, debris shall be hauled in enclosed dust proof containers or wrapped in plastic and sealed with duct tape. No sharp objects should be allowed to cut through the plastic. Wipe down the exterior of the containers with a damp rag to remove dust. All equipment, tools, material, etc. transported through occupied areas shall be made free from dust and moisture by vacuuming and wipe down. f. Using a HEPA vacuum, clean inside the barrier and vacuum ceiling tile prior to replacement. Any ceiling access panels opened for investigation beyond sealed areas shall be sealed immediately when unattended. g. There shall be no standing water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours. h. At completion, remove construction barriers and ceiling protection carefully, outside of normal work hours. Vacuum and clean all surfaces free of dust after the removal. E. Final Cleanup: 1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction. 2. Perform HEPA vacuum cleaning of all surfaces in the construction area. This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc. 1. All new air ducts shall be cleaned prior to final inspection. SPEC WRITER NOTE: On small projects developed at Medical Center, Engineering Officer may tag items to be removed and stored, instead of noting such items on drawings or in specifications. APPENDIX B VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE FOR INCLUSION INTO CONTRACTS, AS APPROPRIATE 1. GENERAL Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security. 2. ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS a. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order. b. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures. c. Contract personnel who require access to national security programs must have a valid security clearance. National Industrial Security Program (NISP) was established by Executive Order 12829 to ensure that cleared U.S> defense industry contractor personnel safeguard the classified information in their possession while performing work on contracts, programs, bid, or research and development efforts. The Department of Veterans Affairs does not have a Memorandum of Agreement with Defense Secretary Service (DSS). Verification of a Security Clearance must be processed through the Special Security Officer located in the Planning and National Security Service within the Office of Operations, Security, and Preparedness. d. Custom software development and outsourced operations must be located in the U.S. to the maximum extent practical. If such services are proposed to be performed abroad and are not disallowed by other VA policy or mandates, the contractor/subcontractor must state where all non-U.S. services are provided and detail a security plan, deemed to be acceptable by VA, specifically to address mitigation of the resulting problems of communication, control, data protection, and so forth. Location within the U.S. may be an evaluation factor. e. The contractor or subcontractor must notify the Contracting Officer immediately when an employee working on a VA system or with access to VA information is reassigned or leaves the contractor or subcontractor s employ. The Contracting Officer must also be notified immediately by the contractor or subcontractor prior to an unfriendly termination. 3. VA INFORMATION CUSTODIAL LANGUAGE a. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor s rights to use data as described in Rights in Data General, FAR 52.227-14(d) (1). b. VA information should not be co-mingled, if possible, with any other data on the contractors/subcontractor s information systems or media storage systems in order to ensure VA requirements related to data protection and media sanitization can be met. If co-mingling must be allowed to meet the requirements of the business need, the contractor must ensure that VA s information is returned to the VA or destroyed in accordance with VA s sanitization requirements. VA reserves the right to conduct onsite inspections of contractor and subcontractor IT resources to ensure data security controls, separation of data and job duties, and destruction/media sanitization procedures are in compliance with VA directive requirements. c. Prior to terminator or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1 Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract. d. The contractor/subcontractor must receive, gather, store, back up, maintain, use, dispose of VA information only in compliance with the terms of the contract and applicable Federal and VA information confidentiality and security laws, regulations and policies. If Federal or VA information confidentiality and security laws, regulations and policies become applicable to the VA information or information systems after execution of the contract, or if NIST issues or updates applicable FIPS or Special Publications (SP) after execution of this contract, the parties agree to negotiate in good faith to implement the information confidentiality and security laws, regulations and policies in this contract. e. The contractor/subcontractor shall not make copies of VA information except as authorized and necessary to perform the terms of the agreement or to preserve electronic information stored on contractor/subcontractor electronic storage media for restoration in case any electronic equipment or data used by the contractor/subcontractor needs to be restored to an operating state. If copies are made for restoration purposes, after the restoration is complete, the copies must be appropriately destroyed. f. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12. g. If a VHA contract is terminated for cause, the associated BAA must also be terminated and appropriate actions taken in accordance with VHA Handbook 1600.01, Business Associate Agreements. Absent an agreement to use or disclose protected health information, there is no business associate relationship. h. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated. i. The contractor/subcontractor s firewall and Web services security controls, if applicable, shall meet or exceed VA s minimum requirements. VA Configuration Guidelines are available upon request. j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor/subcontractor may use and disclose VA information only in two other situations: (i) in response to a qualifying order of a court of competent jurisdiction, or (ii) with VA s prior written approval. The contractor/subcontractor must refer all requests for, demands for production of, or inquiries about, VA information and information systems to the VA contracting officer for response. k. Notwithstanding the provision above, the contractor/subcontractor shall not release VA records protected by Title 38 U.S.C. 5705, confidentiality of medical quality assurance records and/or Title 38 U.S.C. 7332, confidentiality of certain health records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse, or infection with human immunodeficiency virus. If the contractor/subcontractor is in receipt of a court order or other requests for the above mentioned information, that contractor/subcontractor shall immediately refer such court orders or other requests to the VA contracting officer for response. l. For service that involves the storage, generating, transmitting, or exchanging of VA sensitive information but does not require C&A or an MOU-ISA for system interconnection, the contractor/subcontractor must complete a Contractor Security Control Assessment (CSCA) on a yearly basis and provide it to the COR. 4. INFORMATION SYSTEM DESIGN AND DEVELOPMENT a. Information systems that are designed or developed for on behalf of VA at non-VA facilities shall comply with all VA directives developed in accordance with FISMA, HIPAA, NIST, and related VA security and privacy control requirements for Federal information systems. This includes standards for the protection of electronic PHI, outlined in 45 C.F.R. Part 164, Subpart C, information and system security categorization level designation in accordance with FIPS 199 and FIPS 200 with implementation of all baseline security controls commensurate with the FIPS 199 system security categorization (reference Appendix D of VA Handbook 6500, VA Information Security Program). During the development cycle a Privacy Impact Assessment (PIA) must be completed, provided to the COR, and approved by the VA Privacy Service in accordance with Directive 6507, VA Privacy Impact Assessment. b. The contractor/subcontractor shall certify to the COR that applications are fully functional and operate correctly as intended on systems using the VA Federal Desktop Core Configuration (FDCC), and the common security configuration guidelines provided by NIST or the VA. This includes Internet Explorer 7 configured to operate on Windows XP and Vista (in Protected Mode on Vista) and future versions, as required. c. The standard installation, operation, maintenance, updating, and patching of software shall not alter the configuration settings from the VA approved and FDCC configuration. Information technology staff must also use the Windows Installer Service for installation to the default program files directory and silently install and uninstall. d. Applications designed for normal end users shall run in the standard user context without elevated system administration privileges. e. The security controls must be designed, developed, approved by VA, and implemented in accordance with the provisions of VA security system development life cycle as outlined in NIST Special Publication 800-37, Guide for Applying the Risk Management Framework to Federal Information Systems, VA Handbook 6500, Information Security Program and VA Handbook 6500.5, Incorporating Security and Privacy in System Development Lifecycle. f. The contractor/subcontractor is required to design, develop, or operate a System of Records Notice (SOR) on individuals to accomplish an agency function subject to the Privacy Act of 1974, (as amended), Public Law 93-579, December 31, 1974 (5 U.S.C. 552a) and applicable agency regulations. Violation of the Privacy Act may involve the imposition of criminal and civil penalties. g. The contractor/subcontractor agrees to: (1) Comply with the Privacy Act of 1974 (the Act) and the agency rules and regulations issued under the Act in the design, development, or operation of any system of records on individuals to accomplish an agency function when the contract specifically identifies: a. The Systems of Records (SOR); and b. The design, development, or operation work that the contractor/subcontractor is to perform; i. Include the Privacy Act notification contained in this contract in every solicitation and resulting subcontract and in every subcontract awarded without a solicitation, when the work statement in the proposed subcontract requires the redesign, development, or operation of a SOR on individuals that is subject to the Privacy Act; and ii. Include this Privacy Act clause, including this subparagraph (3), in all subcontracts awarded under this contract which requires the design, development, or operation of such a SOR. h. In the event of violations of the Act, a civil action may be brought against the agency involved when the violation concerns the design, development, or operation of a SOR on individuals to accomplish an agency function, and criminal penalties may be imposed upon the officers or employees of the agency when the violation concerns the operation of SOR on individuals to accomplish an agency function. For purposes of the ACT, when the contract is for the operation of a SOR on individuals to accomplish an agency function, the contractor/subcontractor is considered to be an employee of the agency. (1) Operation of a System of Records means performance of any of the activities associated with maintaining the SOR, including the collection, use, maintenance, and dissemination of records. (2) Record means any item, collection, or grouping of information about an individual that is maintained by an agency, including, but not limited to, education, financial transactions, medical history, and criminal or employment history and contains the person s name, or identifying number, symbol, or any other identifying particular assigned to the individual, such as a fingerprint or voiceprint, or a photograph. (3) System of Records means a group of any records under the control of any agency from which information is retrieved by the name of the individual or by some identifying number, symbol, or other identifying particular assigned to the individual. i. The A/E shall ensure the security of all procured or developed systems and technologies, including their subcomponents (hereinafter referred to as Systems ), throughout the life of this contract and any extension, warranty, or maintenance periods. This includes, but is not limited to workarounds, patches, hotfixes, upgrades, and any physical components (hereafter referred to as Security Fixes) which may be necessary to fix all security vulnerabilities published or known to the A/E anywhere in the Systems including Operating Systems and firmware. The A/E shall ensure that Security Fixes shall not negatively impact the Systems. j. The A/E shall notify VA within 24 hours of the discovery or disclosure of successful exploits of the vulnerability which can compromise the security of the Systems (including the confidentiality or integrity of its data and operations, or the availability of the system). Such issues shall be remediated as quickly as is practical, but in no event longer than 7 days. k. When the Security Fixes involve installing third party patches (such as Microsoft OS patches or Adobe Acrobat), the A/E will provide written notice to the VA that the patch has been validated as not affecting the System within 10 working days. When the A/E is responsible for operations or maintenance of the Systems, they shall apply the Security Fixes within 7 days. l. All other vulnerabilities shall be remediated as specified in this paragraph in a timely manner based on risk, but within 60 days of discovery or disclosure...

More opportunities from Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)

Same awarding agency

NAICS: 532490
New
Federal
W038--Rental & Support Services for Wheeled Loaders w/3yard bucket
Solicitation # 36C24126Q0815
The VA Maine Healthcare System Togus is seeking a qualified vendor under a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to provide month-to-month rental and support services for two wheeled loaders and snow removal attachments. The equipment, specified as CAT 926 or CAT 930 models weighing between 27,972 and 31,124 lbs, will be used for snow removal at the Togus VAMC campus in Augusta, Maine. Requirements include a 3-yard bucket with a Fusion coupler, 160 to 170 hp Tier 4 Final engines, ROPS/FOPS certified cabs, and liquid-filled tires. The contractor must provide 24/7 service and support, with repairs initiated within 24 hours of notification or the provision of a replacement loader at no additional cost. All preventive maintenance, repairs, and delivery/pickup charges must be included in the firm fixed price quote. The procurement is governed by NAICS code 532490 and follows FAR subpart 12.6 streamlined procedures. Award will be based on a comparative evaluation of technical capability, past performance, and price, with the contract awarded to the responsible vendor who is technically acceptable and offers the lowest evaluated price. Vendors must submit a firm fixed price quote, a technical capability statement, and a signed Limitation of Subcontracting certificate. Strict security and health protocols apply, including mandatory security badging, adherence to VA non-smoking policies, and proof of vaccinations for influenza, COVID-19, and tuberculosis testing for all personnel accessing the station. All quotes must be submitted to the designated contact by November 2, 2026, at 5:00 PM EST.
Other Commercial and Industrial Machinery and Equipment Rental and Leasing

POSTED

about 12 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238990
New
Federal
Amendment 0001- Replacement-in-Kind Repair of Existing Perimeter Security Fence (Ameristar Impasse Trident) Brand Name or Equal
Solicitation # 36C24127Q0041
The Department of Veterans Affairs VA Boston Healthcare System is soliciting a contract for a localized replacement-in-kind repair of the perimeter security fence at the Brockton VA Campus in Massachusetts. The project focuses on restoring five affected fence bays and six associated post locations that were damaged by winter snow-removal activities. The objective is to return the damaged sections to their original alignment, configuration, appearance, structural stability, and security function. The benchmark product is the Ameristar Impasse Trident system, and while genuine components are preferred, equal alternatives may be proposed if they meet all salient characteristics, including the use of corrosion-resistant tamper-resistant hardware and the maintenance of a continuous security boundary. This procurement is a total set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238990. The period of performance is scheduled from December 1, 2026, to January 31, 2027. Award decisions will be based on the most advantageous offer, considering price, technical capability, and past performance, with a requirement for three relevant references. Proposals must be submitted in three separate PDF volumes (Technical, Past Performance, and Price) to the contract specialist by November 5, 2026. Final acceptance is contingent upon a satisfactory installation inspection, which may include a review by VA Police to ensure operational security.
All Other Specialty Trade Contractors

POSTED

about 12 hours ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS