Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Massachusetts was posted on June 10, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

613376 - DISTRICT 1 Scheduled and Emergency Bridge Superstructure Repairs at Various Locations

Closed
613376State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
CDBG-DR HS004 New Escambia County Area Transit (ECAT) Facility
Solicitation # PD 26-27.004
Solicitation PD 26-27.004 is an invitation to bid for the construction of a new, resilient Escambia County Area Transit (ECAT) facility in Pensacola, Florida. Funded by HUD Community Development Block Grant-Disaster Recovery (CDBG-DR) grants, the project aims to replace infrastructure damaged by Hurricane Sally and subsequent flooding. The scope of work is divided into multiple lots, including the construction of an Administration Building, a Maintenance Building, a Passenger Terminal Transfer Center with ballistic-resistant ticket windows, a Bus Wash, and a Fuel Station. The new facility will be built to Enhanced Hurricane Protection Area specifications to allow it to serve as an emergency shelter and will include a regional stormwater pond to mitigate local flooding. The contract will be awarded to the most responsive and responsible firm offering the lowest bid. Bidders must submit their proposals electronically by November 23, 2026, including a bid bond for 5 percent of the total bid price, a Section 3 Business Application, and proof of active SAM registration. Compliance requirements include the Davis-Bacon Act for prevailing wages, the Americans with Disabilities Act, and OSHA safety standards. Performance is measured by specific completion timelines, such as 300 days for final completion of the Bus Wash, with liquidated damages applied per the FDOT schedule for delays. The project also emphasizes economic opportunity through HUD Section 3 requirements to provide employment and contracting opportunities to low- and very low-income residents.
Purchasing

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope repairs, new roofing, and interior reconfiguration. Key technical upgrades include the installation of new HVAC systems, rooftop air-handling units, air-cooled water chillers, exhaust extraction, compressed air systems, and a full NFPA-compliant fire suppression system. Additionally, the work covers the replacement of electrical distribution, lighting, low-voltage systems, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The contract is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The project is subject to the Davis-Bacon Act and Buy American requirements, and all work must comply with ADA accessibility guidelines. Invoicing is processed monthly via Wide Area Work Flow (WAWF) using NAVFAC Form 7300/30.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of its North Wing dormitory in Troutdale, Oregon. The project aims to restore residential rooms, bathrooms, common areas, and mechanical rooms that suffered extensive interior damage due to water intrusion. The scope of work includes drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The selected contractor must provide all labor, materials, equipment, and supervision to return the affected spaces to safe residential use, ensuring proper protection of the occupied building and minimal service interruptions. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive work plan with project phasing, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the correction of all deficiencies and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 2 days
NAICS: 236220
New
SLED
CCT, Roger’s Bar Church Restoration
Solicitation # RogersBarChurchRestoration_DesignBuildRFP.pdf
The Confederated Tribes of the Colville Reservation is seeking a qualified Design-Build firm to provide comprehensive preservation, stabilization, and repair services for the historic Rogers Bar Church. The scope of work encompasses design, engineering, preconstruction, construction, testing, and closeout, organized into three priority phases: immediate stabilization to arrest decay, priority repairs for life safety and envelope preservation, and user serviceability and structural preservation alternates. A key technical requirement includes the use of historically appropriate wood windows and detailed inspections of wall framing and rafters for concealed deterioration. The project is guided by an existing conditions assessment prepared by Architects West and GLR Engineers. The project has a rough-order-of-magnitude planning budget of 526,000 dollars, though this is not a guaranteed funding limit. Proposals must be submitted electronically by December 4, 2026, and will be evaluated based on a scoring matrix that includes a specific weight for Native ownership and a required plan for promoting Native participation. Selected firms will undergo interviews before final contract negotiations. Awardees must provide payment and performance bonds, maintain comprehensive insurance, and submit monthly applications for payment supported by subcontractor invoices and lien waivers. Daily construction reports and a master project schedule are required to ensure quality control and adherence to the phased restoration goals.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract titled "613376 - DISTRICT 1 Scheduled and Emergency Bridge Superstructure Repairs at Various Locations" is issued by the Massachusetts Department of Transportation and focuses on the repair and maintenance of bridge superstructures within District 1 in Massachusetts. The project is set to be awarded through a solicitation process, with a posting date of June 10, 2024, and a response deadline of July 9, 2024. The contract value is estimated to range from approximately $613,376 to $1,226,752, indicating a significant scope of work involving scheduled and emergency repairs across multiple locations. The NAICS code associated with this project is 236220, which pertains to commercial and institutional building construction, emphasizing the construction and repair aspects of the project. Interested contractors are advised not to use COMMBUYS for bidding on this project, and further details can be accessed through the provided link. The primary point of contact for inquiries is the Construction Unit, reachable via email at [email hidden] or by phone at [phone hidden]. The project aims to enhance the safety and integrity of bridge infrastructure within the district, ensuring timely repairs for both scheduled maintenance and emergency situations.

Documents

1
PDF, High priority: read this firstnotice-to-contractors
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • CDBG-DR HS004 New Escambia County Area Transit (ECAT) FacilityOpen now, due in 6 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 15 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts Department of Transportation
Contacts1 person available
OfficeN/A

Full Description

Show more
Do Not Use COMMBUYS to Bid on this Project

More opportunities from Massachusetts Department of Transportation

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS