71--FURNITURE & INSTALLATION AWARD NOTICE

Awarded
F9A3CE9190A002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423210
New
SLED
Maintenance Office Building Furnishings
Solicitation # 5730
The City of Redding, California, is soliciting proposals under Schedule No. 5730 to provide a complete, commercial-grade furnishing solution for a new maintenance personnel building located at 17120 Clear Creek Rd, Redding, CA 96001. The scope of work includes the supply and installation of durable office furniture for private and shared offices, a conference room, a break room, and reception areas. Key deliverables include inside delivery, room-by-room staging, assembly, and the removal of all packaging debris. To avoid public works installation classifications, the contract expressly excludes wall-mounted panel systems, modular office systems, and any items requiring permanent attachment to the building or licensed electrical work. The City will utilize a two-step evaluation process to determine the award based on the best overall value, considering technical quality, product suitability, warranty, and service support alongside cost. Technical scoring is conducted first, followed by a cost evaluation weighted at 25 points. Proposals must be submitted by 3:00 p.m. PT on November 12, 2026, and must include a signed cover letter, a detailed furniture schedule, and a pricing form submitted in a separate sealed envelope. The successful vendor will be required to provide a primary contact for warranty and service support, and payment for undisputed invoices will be made within 30 calendar days of receipt.
The City Of Redding, California

POSTED

3 days ago

DEADLINE

in 14 days

General Info

Contract Value

$70,382.95

NAICS

423210 - Furniture Merchant Wholesalers

Place of Performance

SD

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7N0 Uspfo Activity Sdang 114
ContactsNo contacts available
OfficeSIOUX FALLS, SD, 57104-0264, USA
Office AddressSIOUX FALLS, SD, 57104-0264, USA
ContactsNo contact information available

Full Description

Show more
DATE: 9/11/09 SUBJECT: Site Visit Notes & Questions and Answers FBO Solicitation: F9A3CE9190A002 FBO Solicitation Title: Furniture and Installation in Sioux Falls, SD Notes: 1. The following individuals attended the Site Visit held September 11, 2009 at 10:00am: Reed Scott, (Interstate Office Products); Linda Marquardt and Teena Hagen, (Canfield Business Interiors); Dave DeBoer, (Brown & Saenger); Craig Jacobson, (Modular Furniture); Rebecca Determan, (Office Systems Inc), MSgt Jim Volden representing SD Air National Guard Civil Engineers. 2. This RFQ is set aside for Small Business concerns and Quotes have been solicited using a combo synopsis/solicitation on FedBizOpps (fbo.gov) and fair opportunity has been given. 3. The salient characteristics of the furniture to be quoted was presented. UNICORs Harmony Mid-Manager Laminate product line is the basis of comparison. The document attached in the Additional Information section of the solicitation entitled Mid-Manager Laminate describes the characteristics of the Mid-Manager laminate furniture requested. 4. As indicated in the solicitation, offer evaluation will be based on price and technical factors. Technical factors are approximately equal in weight to price related factors. The offered items best meeting the Governments requirement will be selected. 5. Drawings for Areas 1 & 2 are for reference purposes only and are not certified for accuracy. In accordance with FAR 52.237-1 offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. 6. Alternate proposals will be considered. The government reserves the right to accept or reject alternate proposals at its option; however offerors must also price the project as specified. Alternate proposals should include enough detail for the Government to understand the alternate as well as its benefits. Costs and or credits shall be listed separately. In the event the government elects to accept an alternate proposal from another offeror, offerors may not be notified that an alternate proposal was accepted. 7. Acceptance of offers must be allowed through October 30, 2009. Questions and Answers: 1. Question: Will this be awarded all or none? Answer: This solicitation is all, some or none and multiple awards are not planned for this project. In accordance with FAR 52.217-5, offer evaluation will be made inclusive of the BASIC line item and all OPTIONS. The Government reserves the right to award MDG OPTION (Line Item 0002) or OPS OPTION (Line Item 0003) at the time of BASIC line item award (Line Item 0001) or after, but not later than October 30, 2009. We do not anticipate making an award to more than one vendor. 2. Question: Do the three drawer rolling file cabinets need to be pencil/box/file cabinets or can they be box/box/file cabinets with a pencil tray included in the top box? Answer: the box/box/file cabinet with a pencil tray in the top box is an acceptable alternative. 3. Question: Are all chairs on carpet? Answer: (9) of the # 23s for Area 1 will be on VCT (vinyl tile). All other chairs will be on carpet. 4. Questions specific to Area 1: A) Item ref # 6 in the Power Pro floor drawing is pictured as a # 12 in the Section BB elevation drawing. Should this item be a # 6 or a # 12? B) Is the Supply Office drawing for both of the Supply Offices since these two office are actually reversed and if so have we accounted for the difference in left and right extentions needed? C) In the Supply Office drawing a #12 is pictured in the Section BB elevation drawing but not in the floor drawing. Are #12 items needed in these offices? Answers: A) This should be a #12 item which was correct on the Area 1 Quote Sheet. B) The Supply Office drawing applies to both of the Supply Offices and changes have been made to the Area 1 Quote Sheet to account for the changes in right and left L-Unit extensions needed and changes to the size of the extentions. C) #12 items are not needed in the Supply Offices. The Area 1 Drawings(Revised) and Area 1 Quote Sheet(Revised) documents attached to this amendment were updated as a result the questions addressed. The amended Area 1 Quote Sheet(Revised) should be used for submitting quotes. 5. Question: Is there storage to drop ship product? Answer: Storage should not be needed for Areas 2 & 3. We would prefer not to store the items for Area 1 for more than a week or two. 6. Question 2: Is there a dumpster on site or do we have to furnish one? Answer: Dumpster can be provided with advanced notice. 7. Question: You mentioned Area 1 install in December. Are the other 2 areas going to be done the same time or earlier? Answer: Installation for Areas 2 & 3 can be done earlier or at the same time if awarded. All other aspects of the Solicitation/Request for Quote remain unchanged.

More opportunities from Department Of Defense → W7N0 Uspfo Activity Sdang 114

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS