Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on June 15, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

7320--589-23-2-7626-0042 | MATTOP CONVEYOR SYSTEM

Closed
36C25523Q0517Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333922
New
DIBBS
PALLET, MATERIAL HANDLI
Solicitation # SPE8EF-27-T-0129
Solicitation SPE8EF-27-T-0129 is a total small business set-aside procurement issued by DLA Troop Support for the supply of material handling pallets under NSN 3990002236529. The requirement consists of two line items totaling 63 bundles, with 13 bundles destined for DLA Distribution Warner Robins in Georgia and 50 bundles for DLA Distribution San Joaquin in California. The original required delivery date is March 6, 2027, with a need ship date of March 28, 2027, and a delivery lead time of 141 days after receipt of order. Technical specifications require pallets to be manufactured according to MIL-DTL-15011K(2) and specific reference drawings. Material requirements stipulate that oak or chestnut wood must be bark-free, square-edged, and maintain a moisture content not exceeding 19 percent. Packaging must comply with ASTM D3951 and RP001, with marking and labeling adhering to MIL-STD-129. Quality assurance is governed by MIL-STD-1916 or ASQ H1331, with inspection and acceptance occurring at the destination. The contract incorporates several critical regulatory clauses, including the Buy American and Balance of Payments Program, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Payment processing is mandated through the Wide Area WorkFlow system. Offerors must be registered in the System for Award Management and submit quotes via the DIBBS portal.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

3 days ago

DEADLINE

in 8 days
NAICS: 333922
New
Federal
Kardex Megamat and Onsite Installation
Solicitation # 511976
UT-Battelle, LLC, the management and operating contractor for Oak Ridge National Laboratory (ORNL), is soliciting firm fixed price quotes for the procurement and onsite installation of three Kardex Megamat units. The specific equipment required consists of 480V 3Phase units with 12 shelves measuring 96.5x16.9x12.3 inches. This procurement is governed by FAR 52.211-6, allowing for brand name or equal products, provided the seller is an authorized reseller and the items are authorized for use in the United States. The award will be granted to the lowest priced, technically acceptable proposal. Proposals must be submitted via email by October 30, 2026, at 5:00 PM EST. Offerors are required to provide a firm fixed price quote, a proposed delivery schedule, and a specific section addressing any exceptions or non-compliance to avoid being deemed non-responsive. Delivery is FOB Destination for domestic shipments, and all onsite personnel must be U.S. citizens or registered foreign nationals via the Foreign Access Central Tracking System. Additionally, the successful contractor must maintain general, professional, and cyber liability insurance of at least 2 million dollars each, with carriers rated A-/VIII or better by A.M. Best. Compliance with SAM registration and various FAR flowdown clauses regarding anti-kickback procedures and subcontractor sales is mandatory.
Ornl Ut-Battelle Llc-Doe Contractor

POSTED

4 days ago

DEADLINE

in 1 day
NAICS: 333922
SLED
CP25013
Solicitation # CP25013
The Port of Lake Charles is soliciting proposals for the procurement of one new portal mounted traveling import hopper and related parts for its Bulk Terminal in Sulphur, Louisiana. The project is classified under heavy construction for wharves, docks, and harbor improvements, with specific requirements for pneumatic tubes and conveyors. The solicitation includes an option for the owner to purchase one additional identical unit within twelve months of the initial handover. Proposals must be submitted by November 20, 2026, and must include a base proposal, an option proposal for the second unit, and any alternate proposals. Required documentation includes a commercial summary, technical data summary, and a technical deviation form, all submitted in Excel format alongside a PDF and hard copy of the full proposal. The selected contractor must maintain local sales support in the Southeast United States and provide a five-year reference list of similar installations. Technical requirements emphasize strict adherence to UL standards and NFPA 70E for electrical safety, with specific mandates for stainless steel or brass nameplates and English labeling. The contract utilizes a milestone-based invoicing system with payments made via wire transfer within 45 days of approval. Quality assurance is rigorous, requiring inspections at both fabrication and delivery sites, the provision of a mobile office trailer on-site, and the issuance of formal certificates for pre-shipment, substantial completion, and final acceptance. Award evaluation is based on a 125-point scale to determine the order of contract negotiations.
Port of Lake Charles

POSTED

9 days ago

DEADLINE

in 23 days

General Info

NAICS

333922 - Conveyor and Conveying Equipment Manufacturing

Place of Performance

Department of Veterans Affairs Dwight D Eisenhower VA Medical Center 4101 S 4th Street Trafficway, Leavenworth, KS, 66048, USA

Set-Aside

NONE

Documents

1

36C25523Q0517 - MATTOP CONVEYOR SYSTEM

DOCX, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Deadline changed

Response deadline changed from Jun 16, 2023 to Jun 23, 2023.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)
Contacts1 person available
OfficeLEAVENWORTH, KS, 66048, USA
Office AddressLEAVENWORTH, KS, 66048, USA
Contacts
Heather StrouhalContract Specialist

Full Description

Show more
This is a SOURCES SOUGHT announcement only. It is neither a solicitation announcement nor a request for proposal or quote and does not obligate the Government to award a contract. Responses to this Sources Sought must be in writing. The purpose of this Sources Sought Announcement is for market research, to make appropriate acquisition decisions, and to gain knowledge of potential qualified businesses capable of providing the following: MATTOP Conveyor System for the Leavenworth VA Medical Center *** See Statement of Work below for details *** If this is within your capability, please respond with the information below: Company Name Address Point of Contact Phone, Fax, and Email UEI number GSA Contract (as applicable) Interested firms are reminded that in accordance with FAR 4.12, prospective contractors shall complete electronic annual representations and certifications to be considered for award. In addition, FAR 4.11 states that prospective contractors shall be registered in the System for Award Management (www.SAM.gov) database. All Service-Disabled Veteran Owned Small Businesses (SDVOSB) and Veteran Owned Small Businesses (VOSB) shall be verified in VetBiz at www.vip.vetbiz.gov. Point of Contact for this Sources Sought is: contact@example.gov +1 (555) 000-0000 Department of Veterans Affairs Network Contracting Office -15 3450 S. 4th Street Trafficway Leavenworth, KS. 66048. Statement of Work Tray Conveyor System Leavenworth, KS I. Introduction The Leavenworth VAMC is seeking to replace an outdated Tray Conveyor System, Disposal system and Trough. The system is used to bring trays from the cafeteria to the Dishroom. This new system will be used to support the Leavenworth VAMC campus. II. Delivery All equipment will be delivered and installed NLT 30 days ARO and must be coordinated with the facility POC before delivery of items. III. Requirements A. New and Unused: All goods shall be new, unused, produced from current production components, and shall be delivered and installed ready for use. B. Shipping: All shipping and handling charges shall be paid by the contractor. Attached below are the specs of the original conveyor that was installed in 1995. We asked that the vendor comes out and measures the area for bidding this project to ensure accuracy. IV. Product Specifications and Quantities CLIN 1 Tray Conveyor System QTY: 1 EA Manufacturer: Bi-Line - Brand Name or Equal Model: MT12/Trough Requirements Model MT12 Mat-Top Soiled Tray Conveyor L Configuration All stainless-steel table construction (14 gauge 304) Single 12" interlocking belt (For Tray or Tray less Operation) General maintenance/cleaning requires no tools Electrical control panel (208/1ph) Drive cabinet w/ belt wash Drip pan with flushing system below belt return Recess sump(s) w/chute below belt for cleanability Variable speed drive UHMW guides and drip pan for belt return 1 5/8" diameter tubular legs and cross tubes Adjustable bullet feet Stainless Steel Window Frame and Sill (3) Trash chutes to accommodate customers trash cans Scrapping Table complete with the following: Trough integral to the tabling & conveyor belt Trough flows to a Salvajor Troughveyor by others. 1 5/8" diameter tubular base with adjustable bullet feet (1) double overhead rack shelf above trough (2) trough covers (1) wash down hose station (2) integral pre rinse sprayers (1) trough magnet (1) trough gusher (1) remote stop/start station (1) SST mobile soak sink (2) SST mobile tables CLIN 2 Re-assembly Requirements Removal and disposal of existing conveyor system Assembly of Bi-Line Conveyor System QTY: 1 EA Mechanical assembly of all field joints and internal utilities reassembly (AS PROVIDED) Fully welded, ground and polished field joint (1) (AS PROVIDED) Level equipment as necessary, making ready for final utility connections, by trades Attach and seal equipment to adjacent equipment and/or walls (AS REQUIRED) Install waste system (by others) underneath soiled tabling Informal start up and testing of equipment with available utilities at time of install Supervision of re-assembly is included (Formal Start-up, testing of all equipment) Warranty Service shall be performed at an additional cost if required. VAMC to provide the following: Conditions: Facility is responsible for providing adequate building utilities. (See item 4 for final connection of equipment to utilities.) Facility is responsible for shut off and integrity of building isolation valves for water, steam, and steam return. CLIN 3 Disposal System QTY: 1 EA Manufacturer: Salvajor- Brand Name or Equal Model: 300-TVR Requirements TroughVeyor, Food waste conveying & Disposing system with water recirculation Right-Hand operation, 3HP disposer with trough diffuser Salvage Basin & Silverware Trap Stainless Steel Construction with Start/stop button with auto reversing control & Safety line disconnect 2nd-Year warranty Electrical: 460/480v/60/3-ph, 5.9 amps (2) each - 988001 Gusher Head Assembly for TVL, TVR & S419 CLIN 4 Installation, removal and disposal Removal/Disposal of existing tray conveyor system and installation of new QTY: 1 EA Requirements Remove old unit (VA to keep the old disposal) Install new conveyor, trough and disposal Install disperser to conveyor Assembly and interconnections Make Final Connections to utilities Start up and test for proper operation VAMC to provide the following: Allow access to onsite forklift, if required Verify and supply all proper sized utilities, with valves and disconnects within 5 feet of terminating points on the same floor level VAMC to keep the existing Salvajor disposal as a backup unit V. Delivery Location and POC information Equipment shall be delivered to: Department of Veterans Affairs Dwight D. Eisenhower VA Medical Center 4101 S. 4th Street Trafficway, Bldg 160 (Nutrition and Food Service) Leavenworth, Kansas 66048-5014

More opportunities from Department Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS