Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 22, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

81--SHIPPING AND STORAG, IN REPAIR/MODIFICATION OF

Awarded
N0038323RD303Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 4 hours ago

DEADLINE

in about 2 months
NAICS: 811310
New
SLED
Roseville Electric Utility – Gas Compressor Maintenance
Solicitation # 07-137
The City of Roseville is soliciting proposals for Gas Compressor Maintenance Services to support the Roseville Energy Park and the Roseville Energy Center and RPEAK. The selected contractor will provide all labor, supervision, technical expertise, specialized tooling, equipment, and materials necessary for both scheduled preventive and corrective maintenance on natural gas compressors, specifically Gas Packagers and Ariel models, and their associated auxiliary systems. The contract is intended to run for an initial term of five years, with services estimated to commence in April or May. This is a prevailing wage project requiring adherence to all fair employment laws, with certified payroll required for contracts exceeding 25,000 dollars. The successful proposer must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Proposals are due by December 17, 2026, and must include a Proposer’s Certification, a Non-collusion Declaration, a Levine Act Disclosure Statement, and proof of active registration with the California Secretary of State. Award will be made to the responsible proposer determined to be the most advantageous to the City through a formal evaluation panel process. Invoicing is to be submitted monthly, delineated by task and personnel, with payment terms set at 30 days following receipt of satisfactory services.
City of Roseville

POSTED

about 4 hours ago

DEADLINE

in about 2 months
NAICS: 811310
New
SLED
FY27 Pump Station and Sewer and Stormwater Structures Inspection and Maintenance
Solicitation # COC-CIFB-FY27-31268
The City of Cambridge Department of Public Works is soliciting bids for the FY27 Pump Station and Sewer and Stormwater Structures Inspection and Maintenance contract, identified as COC-CIFB-FY27-31268. The project has an estimated total value of 1,530,000.00 dollars, which includes a base year and two optional renewal years. The selected contractor will provide all labor and materials for quarterly, biannual, and annual preventative maintenance and emergency repairs for a wide array of infrastructure, including pump stations, level sensors, bending weirs, holding tanks, and generators. Services extend to the troubleshooting of SCADA and telemetering equipment, PLCs, and control valves across various city locations such as the Harvard Tunnel, various firehouses, and multiple municipal schools. The contract will be awarded to the lowest responsible and eligible bidder. Requirements for eligibility include a minimum of five years of experience in the specified activities and the employment of a Massachusetts licensed electrician. The contractor must provide a 24-hour emergency answering service and adhere to strict compliance standards, including the City's Truck Safety Ordinance for large vehicles and the Cambridge Employment Plan regarding minority and resident hiring. Financial security is required via a bid deposit of at least 5 percent of the bid value, with the successful bidder providing performance and payment bonds for 100 percent of the contract sum. Bids must be submitted through the eProcurement portal by November 19, 2026.
Public Works

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 811310
New
SLED
ANNUAL ROTATING EQUIPMENT INSPECTION, TESTING, REPAIR, RECONDITIONING AND STORAGE SERVICES
Solicitation # 2026-RFP-130
Solicitation 2026-RFP-130, issued by the City of Lakeland, seeks qualified contractors to provide annual inspection, testing, repair, reconditioning, and storage services for critical rotating equipment at the McIntosh and Larsen Power Plants. The scope of work covers a wide range of industrial machinery, including low- and medium-voltage AC and DC electric motors, as well as circulating water and condensate pumps. Required services include clean inspect test (CIT) procedures, troubleshooting, motor rewinding, machining, welding, and dynamic field balancing. The contractor is also responsible for the pickup, transportation, and secure indoor storage of equipment, ensuring strict preservation measures such as periodic shaft rotation and moisture control to prevent corrosion and damage. The selection process is based on a points-based criteria to identify the vendor most responsive to the city's needs. Proposers must submit their responses via the OpenGov portal by October 30, 2026, and provide essential documentation including a signed W-9, Sunbiz registration, a notarized indemnification agreement, and a human trafficking affidavit. Contractors must adhere to strict safety standards, including OSHA compliance and specific certification for crane operations and critical lifts. Furthermore, vendors are required to maintain insurance policies with AM Best ratings of no less than A and must undergo a safety audit covering EMR and employee training records to ensure compliance with city risk management standards.
LE - Production - MPP

POSTED

about 8 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This contract is an award from the Navsup Weapon Systems Support for the repair, overhaul, and testing of shipping and storage assets to return them to a Ready For Issue condition. The work will be performed by PackIQ LLC in Anderson, South Carolina. The contractor is responsible for providing all necessary labor, materials, and tooling, with a specific prohibition on the use of MIL-W-81381 wire in favor of SAE-AS22759 series wire. Quality standards require adherence to ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1 standards. Key performance metrics include a Repair Turnaround Time of 55 days from the physical receipt of assets, with an induction expiration date set at 365 days after the contract award. The agreement establishes specific protocols for Beyond Economical Repair and Missing on Induction determinations, both of which require written concurrence from DCMA. Additionally, the contract includes a 12-month warranty on supplies of a noncomplex nature and mandates that any over and above repair efforts be approved by the Procuring Contracting Officer prior to execution.

General Info

Contract Value

$163,870

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

PA, USA

Set-Aside

NONE

Awardee

PACKIQ LLC

Award Issued Date

Documents

1

N0038323RD303.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA
Contacts

Full Description

Show more
COMMERCIAL ITEM PROCUREMENT NOTICE - AWARD|4|N721.10|B1U|+1 (555) 000-0000|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVNG REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2022)|4||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (SEP 1999)|9|||||||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (JAN 23)|3|||| CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVEORDERS -- COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2023))|98||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (DEC 2022))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|332439|500|||||||||||| TYPE OF CONTRACT (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## 55 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for eachNSN(s). Total assets to be repaired monthly after initial delivery commences X/month A throughput of ##____ per month reflects no throughput contraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: SHIPPING AND STORAG ;072308; P/N, ;8145-01-582-4376; NSN, ;TECH DATA NOT LOCATED; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. SHIPPING AND STORAG ;PACKIQ LLC; Company Name , ;1 AMERICAN WAY, ANDERSON, SC 29621-7604; Address , ;541E5; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA77
Solicitation NO0383-26-Q-AA77, issued by NAVSUP Weapon Systems Support, seeks a contractor to provide repair, overhaul, and modification services for electrical control panels (NSN 6110-01-433-5020). The contractor is responsible for providing all necessary facilities, labor, materials, and tooling to return units to a Ready For Issue condition. Key technical requirements include adherence to MIL-STD-130 for markings, the prohibited use of MIL-W-81381 wire in favor of SAE-AS22759, and compliance with ISO 9001/SAE AS9100 quality standards. The scope includes strict protocols for handling items determined to be Beyond Economical Repair, Missing on Induction, or requiring Over and Above Repair, all of which require written concurrence from DCMA and the Procuring Contracting Officer. The government intends to make a single award based on a trade-off between price and past performance, with past performance weighted as the more important factor. Deliveries are expected within 90 days, with Repair Turnaround Time measured from asset return to acceptance at the origin. Packaging must comply with MIL-STD-2073-1 and MIL-STD-129, with specific requirements for electrostatic protection and Depot Level Repairable labeling. Invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow system. The resulting contract will be a DO rated order certified for national defense.
Motor and Generator Manufacturing

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS