Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

9001-9019 Long Beach Boulevard Habitat for Humanity Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 9001-9019 Long Beach Boulevard Habitat for Humanity Project is a residential development in South Gate, California, focused on the creation of affordable housing. The scope of work involves the demolition of all existing on-site improvements on a 0.66-acre site to construct 14 two- and three-story attached townhomes across four buildings. These units will total 18,656 square feet of building area with a combined footprint of 9,772 square feet and a maximum height of 33 feet, two inches. Additional site features include a 1,000-square-foot community center, 950 square feet of open common space, guest surface parking, outdoor benches, and perimeter and interior landscaping. The project also includes a Tentative Tract Map to facilitate the subdivision and sale of individual units. The project has undergone extensive environmental review to comply with CEQA and NEPA standards, resulting in a Notice of Determination filed on July 24, 2026, confirming that no significant environmental effects are expected. Comprehensive assessments were conducted regarding air quality, greenhouse gas emissions, noise impacts, and local transportation, with the latter indicating 65 net additional daily trips. Geological and cultural resource studies were performed, including tribal consultations and hazardous materials assessments, which found no significant historical resources or current hazardous materials on site. The project is funded through the HOME Investment Partnerships Program and is managed by the City of South Gate.

General Info

Habitat for Humanity will build 14 affordable townhomes in South Gate, California.

Place of Performance

Long Beach Blvd/Willow Pl, South Gate, CA, 90280

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of South Gate
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Joshua ValdezAssociate Planner
Audrey DeVoeAssociate Director of Forward Planning

Interested Companies (1)

De Novo Planning GroupEl Dorado Hills, CA

Full Description

Show more
The Project proposes the removal of all existing on-site improvements and structures within the site and construction of a common interest subdivision and affordable housing development. The Project proposes to construct 14 two- and three-story attached townhomes in four buildings. The proposed townhomes total 18,656 square feet of building area and have a combined building footprint of 9,772 square feet. The common areas will include guest surface parking areas, outdoor benches, and community green space. Landscaping will be installed along the perimeter and interior of the site. The Project includes a Tentative Tract Map to create a subdivision for the sale of individual units.

Similar Contracts

Same NAICS industry code

NAICS: 236117
New
Grant
HOME Housing Production Investment Fund 2027
Solicitation # https://www.nj.gov/dca/dhcr/forms/docs/homehpirfpfinalpackage.pdf
The HOME Housing Production Investment Fund 2027 is a state grant opportunity administered by the New Jersey Department of Community Affairs (DCA) to increase the supply of decent, affordable housing for low- and very low-income households. Open to both for-profit and non-profit affordable housing developers, the program funds the new construction or rehabilitation of permanent rental units and for-sale homeownership units, including single-family homes, condos, co-ops, and specific two-family configurations. Applications are accepted on a rolling basis through June 30, 2027, or until all available funds are committed. Funding is provided as a subsidy with maximum per-unit limits based on bedroom count, ranging from 187,658 dollars for studios to 371,477 dollars for units with four or more bedrooms. A maximum of 11 units per project may be assisted with HOME funds. Projects must be completed, including initial lease-up or sale, within four years, and construction on vacant land must begin within 12 months of the grant agreement. Award evaluations focus on construction cost reasonableness, financial feasibility, market demand, and developer capacity, while ensuring compliance with 24 CFR Part 92 and various environmental and hazard factors. Strict technical and regulatory standards apply, including mandatory Energy Star certification verified by a third-party consultant and adherence to the Fair Housing Act and Uniform Federal Accessibility Standards. Specific requirements include water efficiency flow rates, automatic fire suppression for certain projects, and certified lead abatement for buildings constructed before 1978. Applicants must submit their proposals electronically via the DCA SAGE and HPU portals, providing comprehensive documentation including pro formas, professional resumes for key project roles, and required certifications regarding lobbying and debarment.
NJ Department of Community Affairs

POSTED

1 day ago

DEADLINE

in 8 months
View Details
NAICS: 236117
New
SLED
26 Shank Painter Road Housing Development
Solicitation # FY27-RFP-047
The Town of Provincetown is soliciting proposals under RFP FY27-RFP-047 for the design, construction, and development of mixed-income ownership housing on two town-owned parcels located at 26 Shank Painter Road and 15 Browne Street. The project aims to create year-round units for first-time homebuyers, with a preferred affordability range of 80% to 150% Area Median Income (AMI), though levels between 80% and 200% AMI are acceptable. Local preference will be given to individuals living or working in Provincetown or those with children in local schools. The selected developer will enter into a Purchase and Sale Agreement and a Land Development Agreement, with a target for project completion within three years of the sale agreement's execution. Qualified proposers must demonstrate at least five years of housing development experience, a track record of at least two similar projects, and the capacity to begin permitting within 60 days of the agreement. The Town has approved a potential financial contribution of up to 4 million dollars to serve as the last money in to ensure project feasibility, subject to a grant agreement and a perpetual affordable housing restriction. Development must comply with the Provincetown Zoning Bylaw and may leverage an existing Development of Regional Impact decision from the Cape Cod Commission. Proposals are due by November 30, 2026, and will be evaluated based on developer experience, site and building design, financial feasibility, and community need.
Housing

POSTED

4 days ago

DEADLINE

in 23 days
View Details
NAICS: 236117
SLED
Move-In Mass/A Homeownership Production Pilot Program
Solicitation # BD-23-1213-MA001-MA001-134728
MassHousing, in collaboration with the Executive Office of Housing and Livable Communities, is soliciting proposals from qualified non-profit and for-profit developers to produce approximately 20 starter homes across the Commonwealth of Massachusetts. This pilot program, known as Move-In Mass, provides up to 10 million dollars in low-cost non-amortizing loans to as many as three selected sponsors. The initiative specifically targets the use of cost-effective construction methods, including CrossMod, 3D volumetric modular, 1D kit-of-parts, and 2D panel systems, to increase homeownership. All homes must be installed on permanent foundations or crawl spaces and comply with the Massachusetts State Building Code, HUD standards where applicable, and all federal, state, and local accessibility and fair housing regulations. The award process involves a two-stage review consisting of a threshold eligibility check for completeness and legal standing, followed by a comparative review focusing on financial feasibility, construction readiness, team capacity, marketability, and alignment with program preferences. Key financial constraints include a maximum developer fee and overhead of 10 percent of total development costs, infrastructure costs below 50,000 dollars per home, and a maximum subsidy of 150,000 dollars per unit. Applicants must submit a comprehensive package via the MailGate folder by February 25, 2027, including a non-refundable 1,000 dollar application fee. Final award determinations are made by the Executive Office of Housing and Livable Communities.
MassHousing

POSTED

15 days ago

DEADLINE

in 4 months
View Details
NAICS: 236117
SLED
Project 2027 - Development of 30 homes
Solicitation # 26-2903
The Chickasaw Nation Department of Community Service, Division of Housing, is soliciting bids under solicitation number 26-2903 for Project 2027, which involves the construction and equipping of 30 homes across three Oklahoma counties. The scope of work includes providing all labor, materials, tools, and equipment to build 11 homes in the Hilltop Meadows Subdivision of Pontotoc County, 14 homes in Brooklyn Estates of Carter County, and 5 homes in the Northside Addition Subdivision of Johnston County. All work must adhere to the Specifications for Mutual Help Housing for the Housing Authority of the Chickasaw Nation. The overall project completion window is anticipated between October 1 and December 31, 2027, with specific performance periods of 365 calendar days for Pontotoc and Carter Counties and 240 calendar days for Johnston County. Failure to meet these timelines will result in liquidated damages of 2,000 dollars per day. Interested bidders must attend a pre-bid meeting on October 29, 2026, at 10 am. Sealed bids must be submitted to the Tribal Procurement Office in Ada, Oklahoma, by November 19, 2026, at 10 am. To be considered responsive, submissions must be typed or written in ink, include completed Invitation to Bid sheets with unit pricing for specific house plans and site improvements, a signed Non-Collusion Affidavit, and an acknowledgement of Addendum 1. The Department of Community Services reserves the right to reject any or all bids, and the contract prohibits any direct or indirect interest in the proceeds by department employees during their tenure or for one year following.
Chickasaw Nation

POSTED

15 days ago

DEADLINE

in 12 days
View Details
NAICS: 236117
SLED
26 Shank Painter Road Housing Development
Solicitation # BD-26-1573-DPW00-DPW01-134456
The Town of Provincetown is soliciting proposals from qualified developers for the design, permitting, financing, and construction of mixed-income ownership housing on two adjacent town-owned parcels located at 26 Shank Painter Road and 15 Browne Street. Spanning approximately 0.4 acres, the project requires the development of 24 or more residential units with affordability levels ranging from 80% to 200% Area Median Income (AMI), with a specific preference for the majority of units to serve those between 80% and 150% AMI. The development must comply with the Shank Painter Road Form-Based Code Zoning District, Tier 1, which generally allows for three-story buildings, or up to four stories if at least 25% of the units are designated as affordable or community housing. Proposals must be submitted via the Town's online procurement portal by November 30, 2026, at 12:00 p.m. Qualified developers are required to provide third-party references for three completed projects, including at least one affordable housing development. The Town intends to execute a Land Development Agreement and Purchase and Sales Agreement within 90 days of selecting the most advantageous proposal, with work expected to commence within 60 days thereafter and total completion required within three years. Total development costs are estimated between 6.546 million and 7.47 million dollars. The selected developer will be responsible for all insurance, maintenance, and taxes, and must provide a marketing plan aligned with EOHLC Affirmative Fair Housing standards.
Town of Provincetown

POSTED

24 days ago

DEADLINE

in 23 days
View Details
NAICS: 236117
International
DESIGN AND BUILD CONTRACTOR FOR THE DELIVERY OF 192 NEW HOUSES AND APARTMENTS AT KINGS COPSE AVENUE DEVELOPMENT, EASTLEIGH, HAMPSHIRE.
Solicitation # 2026/S 000-096319
Eastleigh Borough Council is seeking a Main Contractor for the design and build of 192 new mixed-tenure homes and apartments at the Kings Copse Avenue development in Botley, Hampshire. This single-phase project includes the delivery of all residential plots along with associated infrastructure, open spaces, and both soft and hard landscaping. The works will be appointed under a JCT Design and Build Contract 2024, with an estimated contract value of 60 million pounds. The project is scheduled to start on site in Q3 2027, with first plot completions expected in early 2028 and final completion by late 2030, though a possible extension to December 2031 may be granted for unforeseen delays. The procurement follows a competitive flexible procedure under the Procurement Act 2023, divided into three potential phases. Phase 1 requires a Procurement Specific Questionnaire (PSQ) due by November 11, 2026, which evaluates conditions of participation and technical capabilities. The four highest-scoring suppliers will proceed to Phase 2, the Invitation to Tender (ITT), involving pricing submissions, technical submissions, and interviews. A final optional Phase 3 may include a Best and Final Offer (BAFO) stage. The contract award will be based on the most advantageous tender, with evaluation weighting set at 70 percent for quality and 30 percent for cost.
Eastleigh Borough Council

POSTED

26 days ago

DEADLINE

in 4 days
View Details

More opportunities from California → City of South Gate

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS