Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 22, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

930 Zone Valve Replacement

Closed
IFB-JV-20-009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project involves the excavation and replacement of a 30-inch triple-offset butterfly valve located at station 198+44.57 along the 930 Zone Pipeline managed by the Inland Empire Utilities Agency in California. The existing valve will be replaced with a new 30-inch double-offset butterfly valve, with both valves sharing identical physical dimensions as detailed in the provided cut sheets. The work site includes an existing concrete pad, with specific location details, aerial views, and site photographs included in the contract documentation. Relevant as-built drawings for the pipeline segment are also provided to assist in planning and execution. The solicitation for this contract, titled "930 Zone Valve Replacement," was posted on April 22, 2020, with a response deadline of May 11, 2020. The project falls under NAICS code 238910, indicating a specialty trade contractor classification. Interested contractors could contact Jordan Villalobos via email or phone for further details. The contract aims to ensure the proper functioning of the pipeline by replacing the existing valve with a new, compatible component, thereby maintaining system integrity and operational efficiency.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Inland Empire Utilities Agency
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The Agency is seeking a qualified a contractor to excavate and replace a 30” triple-offset butterfly valve located at Sta. 198+44.57 along its 930 Zone Pipeline with a new 30” double-offset butterfly valve (See Attachment B & C for existing and new valve cut sheets, physical dimensions are the same for both). The location of the valve to be replaced is described in Attachment A with an aerial and site photos featuring dimensions for an existing concrete pad. Attachment D contains relevant as-builts for the 930 Zone Pipeline.

More opportunities from California → Inland Empire Utilities Agency

Same awarding agency

NAICS: 237110
SLED
Recharge Master Plan Update (RMPU) Basin Improvements Project Montclair Basin Improvements
Solicitation # IFB-JV-26-015
The Inland Empire Utilities Agency (IEUA) is soliciting firm fixed price bids for the Recharge Master Plan Update Basin Improvements Project, specifically focusing on Montclair Basins 2 and 3 in San Bernardino County, California. The project's primary objective is to divert storm flows from the San Antonio Creek Channel for groundwater recharge. The scope of work includes the installation of two diversion drop inlets excavated 8 to 10 feet below the channel floor, the construction of concrete outlet structures for flow dissipation, and the installation of 4-foot-diameter discharge pipelines covered with 3 feet of soil. Additionally, the contractor must provide full electrical, instrumentation, and SCADA controls integration to actuate the basin gates, utilizing approved controls integrators. The contract will be awarded to the lowest responsive and responsible bidder, with bids due via PlanetBids by 2:00 p.m. on October 29, 2026. Bidders must provide a bid bond equal to 10 percent of the total bid and submit comprehensive documentation, including key personnel resumes, a non-collusion affidavit, and CARB certification. The project is subject to stringent regulatory requirements, including Buy America Build America (BABA) and American Iron and Steel (AIS) preferences, State Prevailing Wage and Federal Davis-Bacon requirements, and Disadvantaged Business Enterprise (DBE) utilization standards. Successful awardees must deliver performance and payment bonds within ten calendar days of the Notice of Award.
Water and Sewer Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS