Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Abels Bridge and Pond Outlet Improvement Project (Project) (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-67271-R1C)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has entered into Lake and Streambed Alteration Agreement EPIMS-MEN-67271-R1C with Dustin Abels under Section 1602 of the Fish and Game Code. The project involves two specific encroachments. The first focuses on upgrading a stream crossing on an unnamed tributary to the East Fork Russian River by replacing two 48-inch diameter culverts with a 30-foot by 12-foot bridge supported by eight pre-cast concrete abutments and rock riprap for protection. Coordination with the Potter Valley Irrigation District may be required before work begins to ensure compliance with agreement measures. The second encroachment involves improvements to a reservoir outlet connected to the same unnamed tributary. This phase of the project includes removing 60 feet of culvert, installing a 45-degree elbow and a 10-foot culvert section, and adding a rock energy dissipator. Additionally, a 115-foot vegetated swale with rock check dams every 20 feet and a final energy dissipator will be constructed. The project is managed by the California Department of Fish and Wildlife, Region 1.

General Info

Dustin Abels will upgrade a stream crossing and reservoir outlet for CDFW Region 1.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-MEN-67271-R1C_NOE

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Penny LancasterEnvironmental Scientist
Dustin Ables Please contact Penny Lancaster of CDFWPermitee

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-67271-R1C, pursuant to Section 1602 of the Fish and Game Code to Dustin Abels. The Project is limited to two (2) encroachments (Table 1). One encroachment is for upgrading a stream crossing on an unnamed tributary to East Fork Russian River. Two 48-inch diameter culverts will be replaced with a bridge, consisting of a 30-foot long by 12-foot wide bridge deck supported by eight (8) 2-foot tall by 2-foot wide by 6-foot long pre-cast concrete bridge abutments, 4 pre-cast abutments supporting each end of the bridge, and six (6) cubic-yards of 6-inch plus rock riprap in the stream channel to protect the abutments. Prior to initiating work, coordination with Potter Valley Irrigation District may be necessary to ensure compliance with Measure 2.14 of the Agreement. The other proposed encroachment is for improvements to the outlet of a reservoir filled by water delivery from the Potter Valley Irrigation District and is currently hydrologically connected to an Unnamed Tributary to the East Fork Russian River. Work for this encroachment will include the removal of 60 feet of culvert from the outlet, installation of a 45-degree elbow and 10-foot section of culvert and addition of a 6 foot by 9 foot energy dissipator consisting of 6-inch rock, followed by a 115-foot long vegetated swale with rock check dams at 20-foot intervals, ending in a 6 foot by 9 foot energy dissipator consisting of 6-inch rock.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the project involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved site south of Oahu, vegetation clearance, and the repair of the revetted mole through stone rework and void filling. The estimated contract value ranges between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for small businesses, including specific preferences for HUBZone, SDB, WOSB, VOSB, and SDVOSB concerns. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Mandatory requirements for responsiveness include active SAM registration, a bid guarantee, and the submission of Standard Form 1442. The contractor is required to provide key personnel, including a Project Manager, Superintendent, QC Manager, and Site Safety and Health Officer, and must adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Failure to meet the delivery schedule will result in liquidated damages of 2,297 dollars per calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 28 days
View Details