Abels Bridge and Pond Outlet Improvement Project (Project) (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-67271-R1C)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Department of Fish and Wildlife has entered into Lake and Streambed Alteration Agreement EPIMS-MEN-67271-R1C with Dustin Abels under Section 1602 of the Fish and Game Code. The project involves two specific encroachments. The first focuses on upgrading a stream crossing on an unnamed tributary to the East Fork Russian River by replacing two 48-inch diameter culverts with a 30-foot by 12-foot bridge supported by eight pre-cast concrete abutments and rock riprap for protection. Coordination with the Potter Valley Irrigation District may be required before work begins to ensure compliance with agreement measures. The second encroachment involves improvements to a reservoir outlet connected to the same unnamed tributary. This phase of the project includes removing 60 feet of culvert, installing a 45-degree elbow and a 10-foot culvert section, and adding a rock energy dissipator. Additionally, a 115-foot vegetated swale with rock check dams every 20 feet and a final energy dissipator will be constructed. The project is managed by the California Department of Fish and Wildlife, Region 1.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
