Aerated Sludge Holding Tanks

Closed
26-041State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 13 hours ago

DEADLINE

in 8 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 19 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The Charles County Government, through its DPW - Capital Project Management division, is soliciting design services for critical upgrades to the Aerated Sludge Holding Tanks at the Mattawoman Wastewater Treatment Plant, which serves portions of Charles and Prince George’s Counties. The existing tanks, originally designed as aerobic digesters, currently function as flow equalization units and lack sufficient capacity to meet the county’s requirement for three days of storage at the plant’s 20 million gallons per day average daily flow. The project requires a qualified, multi-disciplined engineering firm to deliver fully permitted, bid-ready design documents and construction engineering services to reconfigure and expand the tank system to achieve this capacity target. Key technical upgrades include replacing existing blowers with new positive displacement blowers, installing a CAMix aeration system, repurposing Tank 2 for scum storage and Tank 5 for thickened sludge, installing a new digested sludge pump, applying self-priming polyurethane coatings for structural integrity, and integrating new controls and sensors into the SCADA system. All design work must comply with county specifications and include acquisition of necessary permits, development of construction documents, and oversight through the construction phase. The contract is structured into three main phases—Design, Bid, and Construction—with separate pricing for each, and includes a $150,000 design contingency and allowances for test pits and a topographic survey. The solicitation, numbered 26-041, is open to electronic submission only via the OpenGov Procurement portal, with proposals due by July 13, 2026, and must be accompanied by technical documentation on SF330 forms and a separate cost proposal with all pricing rounded to the nearest cent and inclusive of overhead, profit, and transportation. Proposals must demonstrate proven experience with at least four to five similar wastewater treatment projects over the past ten years, including one completed aerated sludge holding tank design of similar scale and another constructed project with a total cost exceeding $10 million. The award will be based on a weighted evaluation of price (40%), key staff experience (30%), project understanding (15%), and firm capability (15%), with no guarantee of award to the lowest bidder. Contractors must provide performance and payment bonds, labor and materials bonds, and carry insurance including $5 million umbrella coverage, $2 million environmental liability, $1 million pollution liability, and cyber insurance with $1 million per occurrence limits, along with professional liability coverage

General Info

Upgrade Mattawoman Wastewater Plant tanks for increased storage, operational capacity, and compliance by 2026.

Documents

7

Charles County Aerated Sludge Holding Tanks RFP 26-041

PDF, High priority: read this firstrfp
High

Formal Procurement Request Form - MWWTP Aerated Sludge Holding Tanks v4

PDF, High priority: read this firstformal-procurement-request
High

Sample Contract - Consecutive Number of Days Specified

PDF, High priority: read this first2 pages · contract-document
High

Special Provisions for MWWTP Aerated Sludge Holding Tank Improvements

DOCX, High priority: read this firstspecial-provisions
High

Appendix D Recommended Configuration

PDF, Low priorityother
Low

Performance and Labor Bonds for Charles County ITB

PDF, Low priority2 pages · bond
Low

Project Close Out Documents - Charles County

PDF, Low priority7 pages · closeout-documents
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland → DPW - Capital Project Management
Contacts2 people available
OfficeLa Plata, MD, 20646, USA
Office AddressLa Plata, MD, 20646, USA
Contacts
Jorge DominguezProject Manager
Catherine ScottSenior Procurement Specialist

Interested Companies (2)

AquafinElkton, MD

Full Description

Show more
The Mattawoman Wastewater Treatment Plant (MWWTP) was constructed in the mid-1970s and currently serves the northern portion of Charles County and a southern portion of Prince George's County. The MWWTP is rated for an average daily flow of 20 million gallons per day (MGD). The MWWTP is undergoing essential upgrades to its aerated sludge holding tanks. The tanks, originally constructed as aerobic digester tanks, currently function as aerated sludge holding tanks to provide flow equalization upstream of the dewatering facility rather than volatile solids reduction through aerobic digestion. The existing Aerated Sludge Holding Tanks do not meet the County's need for three days of storage capacity at 20 MGD ADF. This project aims to design upgrades for the Aerated Sludge Holding Tanks that will increase tank capacity to achieve this goal.

More opportunities from Maryland → DPW - Capital Project Management

Same awarding agency

NAICS: 237110
New
SLED
Cobb Island and Hill Road Pump Station Improvements (UN 1308\UN 1309)
Solicitation # 27-010
The Board of Commissioners for Charles County, Maryland, is soliciting bids for construction services to improve the Cobb Island and Hill Road sewage pump stations. The scope of work involves the demolition of existing mechanical and electrical equipment and the installation of new process mechanical piping, equipment, civil site work, temporary bypass pumping, electrical work, instrumentation, and system integration. All work must comply with the Maryland Department of the Environment and Charles County Department of Planning and Growth Management standards. The project requires the contractor to provide operational training for county personnel and ensure all equipment for pump systems is approved for hazardous locations per NEC Class I, Division 1, Group C and D service. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of base bid items and contingency items. Bidders must submit their responses electronically by October 30, 2026, and include a five percent bid bond. Upon execution, the successful contractor must provide performance and labor and material payment bonds for one hundred percent of the contract price. Payment is processed through monthly invoices with a five percent retainage held for a one-year warranty period, though a maintenance bond may be accepted in lieu of retainage. The contract includes a one-year guarantee from the date of final acceptance, which is granted upon the completion of all punch list items and the approval of final as-built drawings and O&M manuals.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
SLED
MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)
Solicitation # 27-002
The Charles County Government is soliciting turn-key design-build services for the Mattawoman Wastewater Treatment Plant Effluent Force Main Surge and Transient project. The project is necessitated by an increase in the effluent pump station's design peak flow to 60 million gallons per day, which has created concerns regarding transient surges that could damage the existing 50-year-old prestressed concrete cylinder pipe and air release valves. The primary objective is to design and construct a new 40-foot diameter welded steel standpipe with separate influent and effluent pipes, including a spiral staircase, platform, and associated vaults, to manage these surges and protect critical infrastructure. The scope of work requires the contractor to perform hydraulic modeling using Bentley HAMMER software and manage all permitting, installation, and testing. The project timeline allows up to 270 consecutive calendar days for the design and permitting phase, with construction starting within 270 days of the Notice to Proceed and reaching substantial completion within 420 days. Award will be based on a combination of proposed price and the evaluation of the offeror's technical approach, construction schedule, and safety risk management. Key contractual requirements include a 33.96 percent MWBE subcontractor goal, prevailing wage compliance, and the provision of a 5 percent bid bond along with performance and labor bonds for 100 percent of the contract price. The design-builder must maintain professional liability insurance of at least 2 million dollars per occurrence and provide a one-year guarantee on all workmanship and materials. Proposals must be submitted electronically by November 9, 2026, and must include a detailed cost proposal consisting of lump sum quotes for design, permitting, and construction.
Water and Sewer Line and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Charles County VanGo Maintenance Facility Construction
Solicitation # 27-012
The Board of Commissioners for Charles County is soliciting bids for the turnkey construction of the VanGo Transit Operations and Maintenance Facility in Waldorf, Maryland. Located on a 6.72-acre site, the project involves the complete construction, testing, commissioning, training, and turnover of a facility designed to support approximately 50 transit buses. The total program is approximately 180,000 square feet, featuring 20,000 square feet of administration, operations, and maintenance space, and 82,000 square feet of commuter-bus parking. Comprehensive infrastructure requirements include bus and chassis wash facilities, fare-collection areas, a fueling island with pad-mounted storage, access road improvements, stormwater management, and landscaping. The contract is funded in part by Federal and State transit funds administered through the Maryland Transit Administration, requiring strict adherence to FTA and MDOT MTA regulations, including Buy America and Build America Buy America standards. Labor must comply with the Davis-Bacon Act prevailing wage requirements. The project has a specified completion timeline of 547 calendar days, with liquidated damages set at 500 dollars per day. Award will be granted to the lowest responsive and responsible bidder based on the sum of Base Bid and Contingency Items. Bidders must provide a five percent bid bond and demonstrate a history of successful performance on similar projects. All work must meet 2010 ADA Standards for Accessible Design and be subject to final inspection and written acceptance by the Contracting Officer.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
SLED
On-Call Maintenance, Repair and Upgrade of Utilities Infrastructure
Solicitation # 27-008
The Board of Commissioners for Charles County is soliciting bids for a Task Order Contract to provide on-call construction services for the maintenance, repair, and upgrade of utilities infrastructure, primarily supporting the Department of Public Works. The scope of work includes the removal and reinstallation of various sewage pumps, maintenance of electrical and mechanical equipment, welding, fabrication, and the rehabilitation of water, sewer, and reclaimed water piping systems, including valves, vaults, and manholes. The contract also covers general excavation, site work, and water well repairs. Each contract has a maximum price of 500,000 dollars, though the County may authorize tasks exceeding this amount with prior written approval. The base period begins upon execution and ends on December 31, 2027, with four optional one-year renewals. Award will be granted to the lowest responsive and responsible bidder who has been actively engaged in the field for at least ten years and is in good standing with the State of Maryland. Bidders must submit a 25,000 dollar bid bond and comply with MWBE program requirements for applicable task orders. Performance and payment bonds of 100 percent of the job order price may be required. Contractors are expected to provide monthly invoicing, subject to a 5 percent retainage, and must adhere to prevailing wage laws and strict safety and environmental codes. Final acceptance of work is contingent upon inspection by the Contracting Officer to ensure all services are performed in a skillful and workmanlike manner.
Water and Sewer Line and Related Structures Construction

POSTED

22 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS